AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendement is to establish partnership agreement, teaming agreement to subfactor 2 in Section M.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA461017R5001
X 9B. DATED (SEE ITEM 11)
06-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Mar-2018
CODE
FA4610 - 30TH CONS
1515 ICELAND AVE. (BLDG 8500), RM 150
VANDENBERG AFB CA 93437-5212
FA4610 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA461017R5001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
PROPOSAL PREP INSTRUCTIONS
Section L - Instructions, Conditions and Notices to Bidders
L-1 GENERAL INSTRUCTIONS
1.0 This section provides general guidance for preparing proposals, as wells as specific instructions on the format and content of the proposal. Throughout this section, the term “offeror” means the prime contractor submitting the proposal. The offeror’s proposal must include all data and information requested by this Section L and must be submitted in accordance with (IAW) these instructions. Any offeror who submits an incomplete package may be considered non-responsive. The offer shall be compliant with the requirements as stated in the Request for Proposal (RFP). A proposal that is sufficiently documented to support cost/price and technical requirements in a complete, orderly and detailed manner will enable the Government to perform a thorough and fair evaluation. Non-compliance with the instructions and RFP may result in an unfavorable proposal evaluation and may be grounds to eliminate the proposal from consideration for contract award. Offerors are cautioned that the Government does not assume the duty to search for data to cure inconsistencies or discrepancies identified in the offeror’s proposal.
2.0. Type of Acquisition. This acquisition is a geographically competitive 8(a) set-aside award limited to 8(a) Program Participants with an SBA bona-fide place of business in the State of California. For this acquisition, selection of the best value offeror will be made using lowest priced technically acceptable (LPTA) procedures. This solicitation will result in a single award Firm-Fixed-Price (FFP), Indefinite-Delivery/Indefinite-Quantity (IDIQ) contracts. Proposals may only be submitted by Small Business Certified 8(a) Small Business firms listed under the 238320 North American Industry Classification System Code (NAICS).
3.0. Discrepancies and Ambiguities. If an offeror believes the requirements in these instructions contain an error, omission, ambiguity, or are otherwise unsound, the offeror shall immediately notify the Contracting Officer (CO) in writing with supporting rationale No Later Than (NLT) seven (7) calendar days after the RFP release date. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussions.
4.0. Mistakes. Mistakes in an offeror’s proposal shall be handled IAW FAR 14.407-4 as referenced in FAR 15.508.
5.0. Exchanges With Offerors After Receipt of Proposals.
5.1. Award without discussions. IAW FAR 15.306(a), offerors may be given the opportunity to clarify certain aspects of the proposal or resolve minor or clerical errors. Clarifications shall be documented on, and conducted via transmittal of, Evaluation Notices (EN) to the applicable offeror. Each EN shall clearly indicate that the type of exchange being conducted is “Clarification”.
5.2. Communications with offerors before establishment of the Competitive Range. After the decision to conduct discussions has been made and prior to establishment of the Competitive Range, the CO may enter into limited “Communications” with offerors only as described in FAR 15.306(b). Communications shall be documented on, and conducted via transmittal of, ENs to the applicable offeror. Each EN shall clearly indicated that the type of exchange being conducted is “Communications”.
5.3. Competitive Range. If discussions are to be conducted, the CO shall establish the Competitive Range comprised of all the most highly rated proposals based on the ratings of each proposal against all evaluation criteria, unless the range is further reduced for purposes of efficiency. IAW FAR 15.306(c), the CO may limit the number of proposals in the Competitive Range to the greatest number that will permit an efficient competition among the most highly rated proposals. IAW FAR 15.503(a)(1), the CO shall provide written notification to unsuccessful offerors of exclusion from the Competitive Range and/or elimination from the competition.
5.4. Exchanges with offerors after establishment of the Competitive Range. Discussions, negotiations in a competitive acquisition, are tailored to each offeror’s proposal and will be conducted by the CO with every offeror within the Competitive Range. At a minimum, during discussions, the CO shall indicate to, or discuss with, each offeror in the Competitive Range any deficiencies or significant weaknesses that have been identified during the evaluation. Discussions shall be documented on, and conducted via transmittal of, ENs to the applicable offeror.
Each EN shall clearly indicate that the type of exchange being conducted is “Discussions”.
5.5. Discussions. The Government intends to award without discussions. However, the Government reserves the right to conduct discussions if determined necessary. If discussions or requests for revised proposals conducted or requested by the Government, the coefficient prices identified in Schedule B of the Final Proposal Revision (FPR) shall be valid through the proposal acceptance period stated in Block 13. D. of the SF1442, RFP.
6.0. Contract Documents. Sections K, L and M apply only to the solicitation phase of this acquisition. These sections will be removed and will not be included in the resulting contract documents.
7.0. Post-Award/Pre-Performance Conference. A post-award/pre-performance conference will be scheduled by and held prior to the commencement of any work at Vandenberg AFB. The offeror or their duly authorized representative is required to attend the post-award/pre-performance conference.
8.0. Points of Contact. The POC for this acquisition is the Contracting Officer, Louis R. Buchanan and the Contract Specialist, Linda Seipel. Written requests for clarification shall be sent to the CO and courtesy copied to the CS. Address any questions or concerns to the POCs using the following contact information:
Louis R. Buchanan Linda Seipel Contracting Officer Contract Specialist louis.buchanan.1@us.af.mil linda.seipel@us.af.mil
30 CONS/LGCA 30 CONS/LGCA
1515 Iceland Avenue B8500 1515 Iceland Avenue B8500
Vandenberg AFB, CA 93437 Vandenberg AFB, CA 93437
L-2 PROPOSAL PREPARATION INSTRUCTIONS
1.0. The proposal package must be completed and returned to the address in Block 7 of the SF 1442, prior to the time set for closing of proposals, see Block 13A of the SF 1442.
1.1. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.
Proposals must be complete, self-sufficient, and respond directly to the requirements of this solicitation. Alternate proposals will not be accepted. The response shall consist of two (2) separate volumes; Volume I – Price and Executed Contract Documentation and Volume II - Technical Proposal.
1.2. Formatting for proposal Volumes I, and II shall be as follows:
1.2.1. USE OF COMMERCIAL SYSTEMS TO TRANSMIT SOURCE SELECTION SENSITIVE
INFORMATION: To facilitate review and evaluation for this source selection the Government proposes to transmit data via commercial systems. Distributed material will be identified as source selection sensitive and distribution will be strictly limited to appropriate personnel, and shall be encrypted per AFFARS MP 5315.3 paragraph 1.4.2.2.3.
Should any contractor object to their proprietary information being shared between source selection evaluators and advisors via commercial email as described above, please advise the Contracting Specialist or the Contracting mailto:louis.buchanan.1@us.af.mil mailto:linda.seipel@us.af.mil
Officer using the contact information above. A cover sheet shall be included in each binder. The cover sheet shall clearly identify the company name, solicitation number, volume number, and copy number (e.g. “Original” or “Copy 1 of 4”). Each binder/CD-ROM/DVD-ROM will be labeled according to the following format:
1.2.2. Hand-Carried Proposals Notice: Offerors are cautioned that Vandenberg AFB has stringent visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass and be cleared by the Government point of contact to be visited prior to entrance. A request for base access must be received at least three business days prior to the date of entry to gain entrance onto VAFB. It is possible that the point of contact may not be available to clear offerors for entrance, which may prohibit submission of hand-carried proposals; consequently, offerors electing t hand-carry their proposals for submittal just prior to closing time do so at their own risk. he header of each page shall include the company name, solicitation number, and page number.
1.2.3. The proposals shall be on 8 1/2” x 11” paper, white. Charts, tables or diagrams may not exceed 11” x 17”.
Pages exceeding these dimensions will be removed from the proposal and not evaluated.
1.2.4. A page is defined as one face of a sheet of paper containing information. This includes all appendices, charts, graphs, diagrams, tables, photographs, etc, unless placed on 11” x 17” sheets, in which case they will be counted as two pages. Covers for volumes, tables of contents, indices, title pages, cross reference indices, and section dividers/tables will not be included in the page count if they are inserted solely to provide ease to the reader in locating volumes/sections of the proposal. They will be counted if they contain any other information, (e.g.
diagrams, extraneous data, etc). Pages marked “This page intentionally left blank” will not be counted.
1.2.5. Each volume shall contain a glossary of all abbreviations and acronyms used, with an explanation for each.
These glossaries will not be included in the page count.
1.2.6. Type face shall not be less than 12 point font with 1” margins on all sides. Smaller, legible font size no smaller than 6 point font, may be used for charts and tables.
1.2.7. The original and hard copy volumes shall be submitted in three-ring, loose leaf binders permitting the volume to lie flat when open. Staples shall not be used to bind pages. If the binder used has protective sleeves on the covers or spine (including the exterior), the offeror should not insert anything in these protective sleeves. A cover sheet shall be included in each binder clearly identifying the company name, solicitation number, volume number, and copy number (e.g. “Original” or “Copy 1 of 3”). The header of each page shall include the company name, solicitation number, and page number. See table below for specific number of copies to be submitted and maximum number of pages permitted. The stated formatting requirements shall also apply to responses to ENs, if requested.
TITLE # OF COPIES MAXIMUM # OF PAGES
Volume I Price with Executed Contract Documentation
Original and 1 hard (paper) copy, and 1 electronic copy
No Page limitation
Volume II Technical Proposal Original and 1 hard (paper) copy, and 1 electronic copy
20 Pages, excluding the demonstration project cost estimate;
no page limitation on the demonstration project cost estimate
1.2.8. Electronic copies shall be identical to the hard copies submitted. The electronic copies shall be submitted on a CD or DVD only. Submission of electronic copies on other than CD or DVD media is not authorized and will result in an offeror being determined non-responsive and not eligible for award. The CD or DVD shall be clearly marked with the company name, solicitation number, and volume(s) included on the CD. The electronic files shall be searchable documents compatible with Adobe Reader 9 and/or Microsoft 2010.
1.2.9. The offeror should be sure to apply all appropriate markings on its proposal, including those prescribed in accordance with FAR 52.215-1(e), Restriction on disclosure and use of data, and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and
Source Selection Information Medium, Number of Copies, & Page Limitations.
1.2.10. Proposal revisions shall conform to the requirements of this section and must be clearly marked to show the changes, on different color stock as directed by the Contracting Officer.
1.2.11. Documents submitted in response to this solicitation must be fully responsive to and consistent with the following:
1.2.11.1. Requirements of the solicitation, and government standards and regulations pertaining to the specification.
1.2.11.2. Evaluation Factors for Award in Section M of this solicitation.
1.2.11.3. Any limitation on the number of proposal pages. Pages exceeding the page limitations set forth in this Section L will be removed from the proposal and not read or evaluated.
2.0. Specific Instructions, SUBMIT THE FOLLOWING:
2.1. VOLUME I – EXECUTED CONTRACT DOCUMENTATION & PRICE PROPOSAL
2.1.1. Executive Summary Sheet. Submit a summary about the company, including the company’s CAGE code, small business categories, and identification of the name(s), email(s), and phone number(s) of the principal person(s) authorized to negotiate on behalf of and obligate the company.
2.1.2. Chapter 1 – SF 1442. Complete applicable blanks. In doing so, the offeror agrees to the contract terms and conditions as written in the RFP Sections A through J. These sections constitute the model contract. The offeror shall also acknowledge, in writing, all amendments issued against this solicitation and include a signed copy of each amendment in this chapter of the proposal.
2.1.3. Chapter 2 – Section B. Insert the proposed price in Section B for base period CLIN including each option periods. Section B shall be the summation of “Exhibit A” (Attachment 2) sub-line items for the based period and each option periods. Offerors who do not comply with this requirement shall be considered non-responsive and not eligible for award. The offeror shall also prepare and include in this chapter a narrative/worksheet that details the costs (i.e. overhead, profit, minimum design, General & Administrative expenses, bond premium, gross receipt taxes, etc.)support the development of the proposed pricing in “Exhibit A”. The total will be identified in Block 22 of SF1442
2.1.4. Chapter 3 – Section C through J. Complete applicable blanks, the offeror shall submit only those pages that require a fill-in.
2.1.5. Chapter 4 – Section K.
2.1.5.1. Complete the Representations and Certifications in Section K of the RFP. Section K shall be submitted in its entirety.
2.1.5.2. Joint ventures are allowable on competitive 8(a) small business set-asides; however, the joint venture agreement must be received by SBA prior to proposal due date and approved before award of any resulting contract.
If the offeror is contemplating a joint venture on this project, the offeror must advise, in writing, its assigned SBA Business Opportunity Specialist (BOS) as soon as possible. It also recommended that the agreement be submitted to your assigned SBA BOS as soon as practicable to ensure compliance with established regulations. Any corrections and/or changes needed can be made only when your BOS has had adequate time for a thorough review before the proposal due date. NO CORRECTIONS AND/OR CHANGES ARE ALLOWED AFTER TIME OF
SUBMISSION OF PROPOSALS.
2.1.5.3. Provide a letter from the Small Business Administration (SBA) showing proof of Section 8(a) status. This letter must also evidence a SBA bona-fide office located within California. Offerors who do not comply with this requirement shall be considered non-responsive and not eligible for award.
2.1.6. Chapter 5
2.1.6.1. Contractor’s License. Offeror shall provide a copy of its active and current, as of the proposal due date, California General Contractor’s License Type B, General Building Contractor or California Contractor’s Specialty License Type C-33.
2.1.6.2. Bonding Capacity. Provide a letter from the offeror’s surety company, stating the offeror’s bonding capacity and ability to meet the bonding requirements ($500K single, $1M aggregate) of the resulting contract.
Bonding may be obtained from a surety listed in the Department of the Treasury Circular 570 list of approved surety companies (http://www.fms.treas.gov/c570/) or other security permitted by FAR Subpart 28.2, unless prohibited by law or regulation.
2.1.6.3. Provide a description of the work the offeror intends to perform within its organization to meet the requirements of FAR clause 52.219-14, Limitations on Subcontracting
2.1.6.4. Provide a letter of authorization to the Contracting Officer to verify offeror’s financial responsibility.
Include name, address and phone numbers for financial institution including a point of contact.
2.2. VOLUME II – TECHNICAL PROPOSAL
2.2.1. General Instructions. At a minimum, the technical volume shall be divided so that Corrosion Control Plan, Organizational Experience and, Demonstration Project are placed in separate tabs within the technical volume. The technical volume should be specific and complete. Legibility, clarity and coherence are very important. The technical volume will be evaluated against the technical sub-factors identified in the Basis of Award in Section M.
Using the instructions below, provide as specifically as possible the actual methodology you would use for accomplishing/satisfying these sub-factors. By your proposal submission, you are representing that your firm will perform all the requirements specified in the solicitation and identified in your proposal. Proposed performance or capabilities that exceed the minimum requirements identified in the solicitation may be incorporated into the contract, but will not result in a more favorable technical rating. Offerors must “pass” in all sub-factors of the Technical Factor in order to be determined “technically acceptable.” The standards are defined in Section M for each sub-factor.
2.2.2. Format and Specific Content. The technical volume should address your technical solution for meeting the Government’s minimum performance or capability requirements of each technical sub-factor.
2.2.2.1. Sub-factor 1: Corrosion Control Plan. Offeror shall provide an effective Corrosion Control Plan specifically addressing Vandenberg AFB identifying preventive measures for reoccurring corrosion of exterior facilities and structures. The plan shall cite the industry standards and specifications used, at a minimum, but not limited to, coating systems, surface preparation methods, quality control standards and inspection procedures for metal structures, propane tanks, diesel tanks, water tanks, generators, transformers and roofs. The Corrosion Control Plan shall include offeror’s approach for recruiting, training and retaining sufficient qualified staffing throughout the contract period; the offeror’s management policies and procedures for project planning, execution information flow, reporting and Government interface; policies and procedures for selection and management of subcontractors; how subcontractors will be integrated into overall paint management; and offeror’s ability to handle the workload of multiple concurrent paint projects (5 to 10),
2.2.2.2. Sub-factor 2: Organizational Experience
2.2.2.2.1. Offeror shall provide position descriptions for key personnel, required minimum qualifications, required job experience (with examples, but without individual names or resumes). Key personnel at a minimum are:
Contract Manager Foreman/Craftsman/Tradesman Safety Officer/Quality Control Officer
2.2.2.1.2. A chart of offeror’s organizational structure detailing the roles, responsibilities, qualifications, and levels http://www.fms.treas.gov/c570/ of authority for key personnel within offeror’s organization, to include (but are not necessarily limited to) personnel with the responsibilities, qualifications, and levels of authority.
2.2.2.1.3. Provide a competency statement evidencing of a minimum of three 3 years job experience in each Categories listed below. Job experience (competency )shall include a brief narrative of type work, the value of the contract/project, the duration of work, and shall include a point of contact (POC) information. Job experience must be within the last three (3) year form the date of solicitation.
(1) painting exterior surface of wood, metal, block and stucco
(2) mudding and tapping drywall
(3) epoxy resurface concrete floors
2.2.2.3. Sub-factor 3: Demonstration Project. The Demonstration Project TO 17-999, Bldg 10250 will be used for evaluation purposes only and will not be awarded.
Provide a solution to fulfill Demonstration Project Statement of Objective which will result in a completed schedule of events; a completed cost estimate sheet utilizing “Firm Fixed Task Order Worksheet” (Attachment 5). The Firm Fixed Task Order Worksheet” shall reflect suitable “Exhibit A” Line Item Numbers (Attachment 2) price and quantity need to fulfill Demonstration Project: TO 17-999, Bldg 10250. An acceptable offer will demonstrate offeror’s ability to appropriately apply Exhibit A” Line Item Numbers, appropriately list a schedule of events that reflect method, performance period, and price.
SECTION M - EVALUATION FACTORS FOR AWARD
The following have been modified:
EVALUATION FACTORS FOR AWARD
BASIS FOR CONTRACT AWARD
M-1 SOURCE SELECTION
1.0. Basis for Contract Award.
1.1. This acquisition is being conducted as a Lowest Price Technically Acceptable (LPTA) source selection in accordance with (IAW) Federal Acquisition Regulation (FAR) Part 15, Contracting by Negotiation, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS), DoD Source Selection Procedures Appendix C, and AFFARS Mandatory Procedures (MP)
5315.3. These regulations are available electronically at the Air Force FARSite, http://farsite.hill.af.mil or http://acquisition.gov/far. The Government will select the proposal(s) with the lowest evaluated price from among those rated as “technically acceptable” for all sub-factors of the Technical Factor.
1.2. Contracts may be awarded to the offerors who are determined to be responsible IAW FAR Subpart 9.1, as supplemented, and are determined eligible by the Small Business Administration (SBA) IAW FAR 19.8, whose proposals conform to the solicitation’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation) and are judged, based on the evaluation factors and sub-factors, to represent the Lowest Price Technically Acceptable (LPTA) proposal. While the Government will strive for maximum objectivity, the source selection process, by its nature, is subjective;
therefore, professional judgment is implicit throughout the entire process.
2.0. Number of Contracts to be Awarded. The Government intends to award one (1) Firm-Fixed-Price (FFP), Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract for the Base Paint and Corrosion Control Requirement.
http://farsite.hill.af.mil/ http://acquisition.gov/far
3.0. Distribution. Distributed material will be identified as source selection sensitive and distribution will be strictly limited to appropriate personnel, and shall be encrypted where practicable. Should any offeror object to its proprietary information being shared between source selection evaluators and advisors via commercial email as described above, advise the Contracting Officer using the contact information above.
4.0. Discussions. The Government intends to award without discussions. However, the Government reserves the right to conduct discussions if determined necessary. The offeror’s proposal should represents the offeror’s best efforts and most complete responses to this solicitation. If during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, offeror responses to Evaluation Notices (ENs) and the Final Proposal Revision (FPR) will be considered in making the source selection decision. If the offeror’s proposal has been evaluated as acceptable at the time discussions are closed, any changes or exceptions in the FPR are subject to evaluation and may introduce risk that the offeror’s proposal be determined unacceptable and ineligible for award.
5.0. Evaluation Process. The evaluation process to be used is as follows:
Step 1. Perform compliance review on all proposals to assess compliance with terms and conditions of the solicitation. Non-compliance with the terms and conditions of the solicitation may result in an unfavorable proposal evaluation and may be grounds to eliminate the proposal from consideration for contract award.
Step 2. Perform price evaluations on all proposals and rank them from lowest to highest;
Step 3. Conduct technical evaluations beginning with the lowest priced offeror. If the lowest priced Offeror is determined to be technically unacceptable, then the next lowest priced Offeror will be evaluated. This process will be repeated until the government has identified the lowest priced technically acceptable offeror. The government reserves the right to open discussions. The offeror determined to be technically acceptable, either initially or as a result of discussions, will be considered for award.
Step 4. Perform a responsibility determination on the lowest priced technically acceptable offeror. In order to be determined as responsible, an offeror must meet the following conditions:
• Offeror must provide a letter from the Small Business Administration (SBA) showing proof of Section 8(a) status evidencing a SBA bona-fide office located within California
• Offeror must meet the standards identified in FAR 9.104-1;
• Offeror must possess an active California General Building Contractor’s License, Type B, or
California Specialty Contractor’s License Type C-33 registered in the prime contractor’s name;
• Offeror must provide evidence that it is able to obtain a minimum single project bonding capacity of
$500K and an aggregate bonding capacity of $1M from an approved surety listed in the Department of the Treasury Circular 570 (http://www.fms.treas.gov/c570/) or other security permitted by FAR Subpart 28.2, unless prohibited by law or regulation;
• Offeror must provide a letter detailing how the offeror intends to perform within its organization to meet the requirements of FAR clause 52.219-14, Limitations on Subcontracting;
• Offeror must provide a letter of authorization permitting the Contracting Officer to verify offeror’s financial responsibility. Include name, address and phone numbers for financial institution including a point of contact.
Offerors who are determined to be non-responsible will be referred to the Small Business Administration (SBA) for a Certificate of Competency (COC). If a COC is denied by the SBA, the Government will resume technical evaluations as detailed in Step 3. Technical evaluations will continue until the Government identifies the Lowest Priced Technically Acceptable (LPTA) responsible offeror.
Following the completion of Steps 3 and 4; the Contracting Officer, with the approval of the Source Selection Authority (SSA), will determine if it is in the Government’s best interest to open discussions. If the determination is made to open discussions, the Government will conduct discussions with all offerors considered technically acceptable. The Government reserves the right to award without discussions. The Government also reserves the right to perform both price and technical evaluations on non-responsive Offerors to determine if it is in the http://www.fms.treas.gov/c570/
Government’s best interest to open discussions. Only those Offerors determined to be technically acceptable, either initially or as a result of discussions, will be considered for award.
M-2: EVALUATION FACTORS AND SUB-FACTORS
1.0. Evaluation of Proposals. The following evaluation factors and sub-factors will be used to evaluate each proposal. The Government will evaluate proposals for technical acceptability, but will not rank the proposals by non-price factors or sub-factors.
Factor I - Price Factor II - Technical Subfactor 1: Corrosion Control Plan Subfactor 2: Organizational Experience Subfactor 3: Demonstration Project
2.0. Evaluation Factors and Standards
2.1. Factor 1 - Price Factor. Offerors whose price is determined to be unreasonable or unbalanced will not be considered for award. The offeror’s price proposal will be evaluated by reviewing the proposed pricing from completed the SF1442, Section “B” Schedule. A completed price proposal shall consist of completed “Exhibit A” (Attachment 2) sub-line items for the based period and each option period. The sum will be identified in Block 22 of SF1442.
a. Schedule B: Contract Line Item Numbers: Insert offeror’s totals derived from “Exhibit A, Pricing Schedule” for the base year and all option years:
b. “Exhibit A, Pricing Schedule” (Attachment 2): For each sub-line/reference number, enter a unit price; multiply the estimated quantity by the unit price for an estimated total price. The contractor shall sum all corresponding sub-line items and enter the total price in the “Basic Period Est Total” column for the base year and each option year.
The contractor shall transfer each estimated total price from “Exhibit A, Pricing Schedule” to the corresponding CLIN in Section B. Prices shall be firm-fixed price and include labor and materials, overhead and profit.
The Government may determine that an offer is unacceptable if unit prices are significantly unbalanced. Offerors are cautioned against submitting an offer that contains unbalanced pricing. Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated by the application of cost or price analysis techniques. The Government will analyze offers to determine whether they are unbalanced with respect to separately priced line items or subline items. Offers that are determined to be unbalanced may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
2.2. Factor 2 - Technical Factor. The Government’s technical evaluation team shall evaluate the technical proposals on an “Acceptable” or “Unacceptable” basis, assigning one of the ratings described below for each sub-factor. Any sub-factor evaluated as “Unacceptable” will render the entire proposal unacceptable and, therefore, not eligible for award. Only those proposals determined to be “technically acceptable”, either initially or as a result of discussions, will be considered for award. However, the offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussions.
TABLE 1 - TECHNICAL RATINGS
Rating Description Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
2.2.1. Sub-factor 1: Corrosion Control Plan.
2.2.1.1. Description. This sub-factor evaluates the offeror’s approach to Corrosion Control measures to implement Base Paint and Corrosion Control Requirement stated in base-wide paint & corrosion control Scope of work paragraph 1.24.
2.2.1.2. Standard. This requirement is met when the offeror provides an effective Corrosion Control Plan that identifies preventive measures for reoccurring corrosion of exterior facilities and structures. Lists industry standards and specifications to be used on coating and surface preparation. Identifies quality control measure and inspection standards for metal structures, propane tanks, diesel tanks, water tanks, generators, transformers and roofs. The Plan shall include offeror’s approach for recruiting, training and retaining sufficient qualified staffing throughout the contract period; the offeror’s management policies and procedures for project planning, execution information flow, reporting and Government interface; policies and procedures for selection and management of subcontractors; how subcontractors will be integrated into overall paint management; and offeror’s ability to handle the workload of multiple concurrent paint projects (5 to 10),
2.2.2. Sub-factor 2: Organizational Experience
2.2.2.1. Description. This sub-factor evaluates the offeror’s ability to create an effective organizational chart that list job experience/qualifications of key personnel in relation to: (1) painting exterior surface of wood, metal, block and stucco surfaces (2) mudding and tapping drywall (3) epoxy resurface concrete floors. The term “offeror” includes partnership agreements and/or teaming agreements for this evaluation sub-factor.
2.2.2.2. Standard. This requirement is met when the offeror’s organizational chart specifies Key Personnel roles, responsibilities, levels of authority of personnel within its organization and meets the minimum experience/qualifications that complies with the requirements of base-wide paint & corrosion control Scope of work, paragraph 3.2.5.
2.2.2.3. Position descriptions are required to meet a minimum job experience qualifications with examples that demonstrate their ability to meet all technical elements requirements: (1) painting exterior surface of wood, metal, block and stucco surfaces (2) mudding and tapping drywall (3) epoxy resurface concrete floors specifications acceptability is met when the offeror submits documentation evidencing a minimum of three (3) years job experience in each of the areas identified above. Job experience qualification shall be within 3 three year form date of solicitation.
• Contract Manager
• Foreman/Craftsman/Tradesman
• Quality Control Officer/Safety Officer
2.2.3. Sub-factor 3: Demonstration Project TO 17-999, Bldg 10250 - This project will be used for evaluation purposes only and will not be awarded
2.2.3.1. Description. This sub-factor evaluates the offeror’s ability to provide a solution (complete and acceptable proposal package) for the Demonstration Project in accordance with the Base Paint and Corrosion Control Requirement
2.2.3.2. Standard. This requirement is met when the offeror submits a complete and acceptable “Firm Fixed Task Order Work Sheet that list the necessary work criteria in bullet format which fulfills Government Statement of Objectives, a completed schedule of events, and a completed cost estimate sheet utilizing “Firm Fixed Task Order Worksheet” (Attachment 5) that includes the necessary subline item numbers (0001AA-0001BK) to fulfill the requirement stated in the Statement of Objectives, Paint exterior and interior of Bldg 10250 (Attachment 7) and demonstrates compliance with Base Wide Paint and Corrosion Control Statement of Objectives.
Proposal package is a completed schedule of events; a completed “Firm Fixed Task Order Worksheet” (Attachment
5) utilizing the necessary subline item numbers (0001AA-0001BK) to fulfill the requirement stated in the Statement of Objective Project: TO 17-999, Bldg 10250 (Attachment 7) and demonstrate compliance with Base Wide Paint and Corrosion Control.
(End of Summary of Changes)