FA4610-16-R-1448_SV_Minutes.pdf
PDF 40 KB Posted
- Attached to
- XUMU 07-1187C Upgrade Lompoc Gate Facilities Federal contract opportunity
- Solicitation number
- FA4610-16-R-1448
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4610-16-R-1448-0002-Conformed.pdf | ||
| FA4610-16-R-1448_Amendment_0002.pdf | ||
| 01000_General_Requirements_XUMU071187C.doc | DOC document | |
| 07-1187C_Upgrade_Lompoc_Gate_RFI_List_Responses.docx | DOCX document | |
| 07-1187C_Upgrade_Lompoc_Gate_SV_Sign_In.pdf | ||
| 07-1187C_Upgrade_Lompoc_Gate_SV_Sign_In.pdf | ||
| FA4610-16-R-1448_Conformed_Amdnt_1.docx | DOCX document | |
| FA4610-16-R-1448_Amendment_1.docx | DOCX document | |
| FA4610-16-R-1448_CA160023_Attch_3.pdf | ||
| FA4610-14-D-1448_Drawings_Attch_4.pdf | ||
| 2009-09-25_-Consolidated_Fire_Alarm_Spec_Attch_6.pdf | ||
| FA4610-16-R-1448_Environmental_Specs_Attch_7.pdf | ||
| FA4610-16-D-1448_Statement_of_Work_Attch_1.pdf | ||
| FA4610-16-R-1448.pdf | ||
| 2013-02-19_Lockshop_Lockset_Requirements_Attch_8.pdf | ||
| FA4610-16-D-1448_16700_Comm_Sys_Attch_5.pdf | ||
| FA4610-16-R-1448_LompocGateProcedures_Attch_9.pdf | ||
| FA4610-16-R-1448_RMDF_Attch_2.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
30TH SPACE WING (AFSPC)
GUARDIANS OF THE HIGH FRONTIER
25 July 2016
MEMORANDUM FOR RECORD
FROM: William R. Bumpass, 30 CONS/LGCA
SUBJECT: FA4610-16-R-1448, XUMU 07-1187C Upgrade Lompoc Gate.
1. A Site Validation Visit was conducted on 19 July 2016 for the titled project.
a. During the Site Validation Visit, the following were discussed:
(1) The project manager, Mr. Jordan Hampton, gave a brief explanation of the requirements in the statement of objectives.
(2) A question was asked regarding the location of the new final denial barrier. Mr.
Hampton stated from previous projects the barriers had been located approximately 800 feet from the gate, however, the contractor who wins the award will be required to determine the exact distance during the design phase to ensure the barrier meets all codes.
(3) Mr. Hampton asked that all Requests for Information (RFIs) be submitted in writing to 30th Contracting.
b. Those present were then allowed to conduct their own investigation of the Lompoc
Gate.
All questions shall be emailed to the Contract Specialist, Robert Bumpass, at email william.bumpass.1@us.af.mil.
WILLIAM R. BUMPASS
Contract Specialist