Questions_and_Answers.docx
DOCX document 17 KB Posted
- Attached to
- Replace HVAC Bldg 9190 Federal contract opportunity
- Solicitation number
- FA4610-15-R-0012
About this file
FA4610-15-R-0012 Questions Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Minutes_Sign_In_Sheet.pdf | ||
| Att_3_Combined_Drawings.pdf | ||
| Att_1_5-14-2015_-_SOW_12-1008B.pdf | ||
| Att_2_Specifications.pdf | ||
| Att_6_VAFB_Facility_Excellence.pdf | ||
| FA4610-15-R-0012_Solicitation.pdf | ||
| Att_5_DBA_CA150023.pdf | ||
| Att_4_RMDF.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for FA4610-15-R-0012 Repair HVAC Bldg 9190
1) On page 31 of the Solicitation, Volume I, Number 3 references Section C through J - the solicitation does not have a Section C or D. Can those sections be located somewhere else?
Answer 1: Sections “C” through “J” is not applicable. Submit proposal in accordance with solicitation FA4610-15-R-0012
2) Will phasing be necessary for this project?
Answer 2: No phasing is required. However the shutdown of the facility, or any loss of operation, is strictly limited to the absolute minimum. Any and all shutdowns must be coordinated a minimum of 4 weeks in advance through the users and the 30CES PM.
File details come from the government source that posted it. Updated .