Casey_LOSC_Industry_Day_Slides_18_Aug_16_final.pdf
PDF 247 KB Posted
- Attached to
- Industry Day/Site Visit
- Solicitation number
- FA4610-15-R-0002
About this file
LOSC Industry Day Briefing Slides
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Air Force Installation Contracting Agency
Source Selection Information Protect IAW FAR 2.101 & 3.104
Launch Operations Support Contract, FA4610-15-R-0002
18 Aug 2016
Claudia Boga Contracting Officer
Casey Linehan Program Manager
Presenter Presentation Notes Be sure to appropriately label your briefing with legends such as:
For Official Use Only (FOUO)
Or
Source Selection Information Protect IAW FAR 2.101 & 3.104
Agenda
8:30 – 10:00 – Contract Overview
10:00 – 11:00 – South Vandenberg Power Plant (SVPP)
11:00 – 12:00 – B7025, B8510
12:00 – 1:00 – Lunch at Breakers
1:00 – 2:00 – B1768 (US Citizens only, info needed prior to entry)
Program Description
Program Title: Launch Operations Support Contract
Description of services being acquired:
LOSC provides maintenance and repair services for facilities, real property, real property installed equipment, and Western Range support equipment to ensure successful performance during tests, operations, and launches.
RFP: FA4610-15-R-0002
Period of Performance:
Thirty (30) day phase-in from 3 Jun 17 through 02 Jul 17 Base period of 3 Jul 17 through 31 May 18 Four (4) one (1)-year options from 1 Jun 18 through 31 May 21 Six (6) month pre-priced option to extend under FAR 52.217-8
Program Description (CONT)
Type of set-aside: Small Business Set-Aside
Contract Type: FPIF, CPFF, Cost
Presenter Presentation Notes Acquisition Considerations: (i.e., GFP/Security/Logistics/personal services/labor laws)
CLIN Structure
CLIN Description CLIN Type 0001 Phase-In FFP
X001 Range Support Services, Maintenance & Repair (M&R) FPI
X002 MDA M&R FPI
X003 NRO M&R FPI
X004 Launch Group M&R FPI
X005 Launch Support / Task Assignments CPFF
X006 Non-PME Launch Customer Support CPFF
X007 Other Services / Task Assignments CPFF
X008 Reimbursables COST
Instructions to Offerors
Proposal Submission timeframe:
Per Section A of the RFP, Item #9, proposals will be received by 30 CONS on 16 Sep 16 by 3:00 PM
Proposals are subject to the requirements of FAR 52.215-1, Instructions to Offerors - Competitive Acquisitions
FAR 52.215-1 states proposals received at the Government office designated in the solicitation after the exact time specified for receipt of offers will not be considered with only a few specific exceptions
Basis of Award Lowest Price Technically Acceptable
Lowest Price Technically Acceptable acquisition conducted in accordance with FAR 15.3 - Source Selection, as supplemented by the DFARS and AFFARS.
Award will be made to the Offeror who is deemed responsible in accordance with the FAR Part 9.1 whose proposal conforms to all solicitation requirements.
Award represents the best value to the government from the selection of the technically acceptable proposal with the lowest evaluated price.
Evaluation Factors
Evaluation Factors Factor 1: Price/Cost Factor 2: Technical Capability SubFactor 1: Program Management Approach
Phase-in Organization and Staff Quality Management Plan
SubFactor 2: Operations Approach Pressure Vessels South Vandenberg Power Plant (SVPP) Generators Use and Environmental/SBAPCD Requirements Maintenance and Repair Corrosion Control
Presenter
Key word is “Demonstrate” how requirements will be met. Don’t just change requirements from ‘Contractor shall’ to the Contractor Will.
Price Evaluation
The sum of all FPIF CLINs Ceiling Price and CPFF CLIN X006 shall constitute the total evaluated price which will be evaluated for price reasonableness, affordability and balance.
CPFF CLINs will be evaluated for cost realism and reasonableness.
The amounts used for cost reimbursable material CLINs will be provided by the government and will not be included in the total evaluated price.
Presenter
Performance Work Statement PWS lists the requirements, appendices list locations & quantities
Appendix A: Facilities with 100% responsibility Appendix B: Equipment outside Appendix A facilities Appendices C, D, E, F, G: Cranes, Hoists, Pressure Vessels, Elevators, LPS/Grounding, Generators Appendix H: Environmental Requirements Appendix I: Service Summary Items & Objectives Appendix J: MDA Launch Comm Systems Appendix K: Acronyms and Abbreviations Appendix L: Government Furnished Equipment Appendix M: Real Property Report Appendix N: Equipment List for Appendix A Bldgs Appendix O: Glossary (includes demarcation points)
Operations Support Scheduling
30 CES collects orders for customers requesting support
30 CES sends LOSC contractor list of assignments for each launch
Typical assignments used for every launch:
Pre-Launch testing at CT-3 site Elec, Power and HVAC standby at DCC Generator standby at CT-3 Pillar Point Power Plant operations
Special Assignments for particular launches:
Operate SVPP 24/7 (anywhere from 16 hrs to 60 days) Standby at Bldg 1768 launch control center Standby at Bldg 8510 launch control center Standby at Bldg 1594 control center Standby at sites with degraded electrical infrastructure
Operations Support History
Launch Vehicle
Mission Tempo
Avg # Assg’ts
Avg M-hrs
Avg # Assg’ts
Avg M-Hrs
Special Assignments
MM III 3 per yr 14 108 Atlas V ~2 per yr 18 146 115 1,377 SVPP & B8510 Delta II 2 more left 18 137 MDA GBI ~1 per yr 16 166 25 305 B1768 standby Delta IV 1 per 2 yrs 13 115 154 1,854 SVPP & B8510 X-37B 1 per 2 yrs 15 421 34 411 B1594 standby Falcon 9 2-3 per yr 8 53 Minotaur 19 170 Taurus 15 92 Pegasus 10 70
Typical Assignments Special Assignments
Operations Support History
Year # of Missions Typical Assignments
Man-Hrs
Special Assignments
Man-Hrs 2009 8 676 3,022 2010 11 1,943 1,805 2011 9 1,184 3,648 2012 5 1,292 3,848 2013 11 1,360 2,092 2014 7 1,108 3,920 2015 7 926 1,680 2016 5 400 4,992
Questions
| Slide Number 1 |
| Agenda |
| Program Description |
| Program Description (CONT) |
| CLIN Structure |
| Instructions to Offerors |
| Basis of Award |
| Evaluation Factors |
| Price Evaluation |
| Performance Work Statement |
| Operations Support Scheduling |
| Operations Support History |
| Operations Support History |