Attachment_10-_Bid_Schedule.xls
XLS spreadsheet 51 KB Posted
- Attached to
- Repair primary distribution line, Bodcau tie Federal contract opportunity
- Solicitation number
- FA4608-16-R-0013
About this file
Bid Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BAFB_Site_Visit_Questions_-_answers__2-9.pdf | ||
| Question__1.docx | DOCX document | |
| Attendance_Sheet.pdf | ||
| Attachment_4_-_AF66.pdf | ||
| Attachment_3-_Environmental_Req'ts_(Oct_15).pdf | ||
| Attachment_2_-_Drawings.pdf | ||
| Attachment_7_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_6_-Wage_determination.pdf | ||
| Attachment_1_Specifications.pdf | ||
| Attachment_8_-_PPQ_cover_letter.pdf | ||
| Released_Solicitation.doc | DOC document | |
| Attachment_9-_Special_Contract_Requirements.pdf | ||
| Attachment_5-_Insurance.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary of Costs
| NOTE: | OMB No. 0704-0193 (REV) | |||||||||
| THIS | CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| COLUMN | CONTRACTOR | ADDRESS | ||||||||
| DOES | ||||||||||
| NOT | CONTRACT FOR (WORK TO BE PERFORMED) | AVAILABLE FOR CONSTRUCTION (afc) | ||||||||
| REPAIR PRIMARY DISTRIBUTION LINE - BODCAU TIE | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| FA4608-16-R-0013 / AWUB 11-0052 | OTHER | |||||||||
| MATERIAL COST | LABOR COSTS | DIRECT | LINE | |||||||
| UNIT | LINE | UNIT OF | COST | TOTAL | ||||||
| LABOR | NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | UNIT | TOTAL | (EQUIP) | |
| COST | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (8) | (9) | (10) | ||
| 0.00 | SUMMARY | 0.00 | 0 | |||||||
| 1 | Conductor Costs | EA | ||||||||
| 2 | Equipment Costs | EA | ||||||||
| 3 | Demolition Costs | EA | ||||||||
| 4 | ||||||||||
| TOTAL COST OPINION | ||||||||||
| 0 | 0.00 | 0 | ||||||||
| NOTES: | 0.00 | 0 | ||||||||
| 0.00 | 0 | |||||||||
| 0.00 | 0 | |||||||||
| 0.00 | 0.00 | 0 | ||||||||
| 0.00 | 0.00 | 0 | ||||||||
| 0.00 | 0.00 | 0 | ||||||||
| 0.00 | 0.00 | 0 | ||||||||
| 0.00 | 0.00 | 0 | ||||||||
| 0.00 | 0.00 | 0 | ||||||||
| 0.00 | 0.00 | 0 | ||||||||
| 0.00 | ||||||||||
| 0.00 | 0.00 | |||||||||
| AF Form 3052, Aug 85 PREVIOUS EDITION IS OBSOLETE |
&RFA4608-16-R-0013
Attachement 10
Conductor Cost
| NOTE: | OMB No. 0704-0193 (REV) | |||||||||
| THIS | CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| COLUMN | CONTRACTOR | ADDRESS | ||||||||
| DOES | ||||||||||
| NOT | CONTRACT FOR (WORK TO BE PERFORMED) | AVAILABLE FOR CONSTRUCTION (afc) | ||||||||
| REPAIR PRIMARY DISTRIBUTION LINE - BODCAU TIE | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| FA4608-16-R-0013 / AWUB 11-0052 | OTHER | |||||||||
| MATERIAL COST | LABOR COSTS | DIRECT | LINE | |||||||
| UNIT | LINE | UNIT OF | COST | TOTAL | ||||||
| LABOR | NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | UNIT | TOTAL | (EQUIP) | |
| COST | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (8) | (9) | (10) | ||
| 0.00 | 1 | Manhole install & racking 10'x10'x8' | EA | |||||||
| 2 | 15KV EPR Conductors - # 750 kcmil | LF | ||||||||
| 3 | 15KV EPR Conductors - # 2 AWG | LF | ||||||||
| 4 | Bare Copper Ground - # 4/0 AWG | LF | ||||||||
| 5 | 15 KV Cable Terminations - 750 kcmil | EA | ||||||||
| 6 | 15 KV Cable Terminations - 2 AWG | EA | ||||||||
| 7 | Schedule 40 PVC - 6" | LF | ||||||||
| 8 | Schedule 40 PVC - 5" | LF | ||||||||
| 9 | PVC-Coated RGS Elbow - 6" | Ea | ||||||||
| 10 | PVC-Coated RGS Elbow - 5" | Ea | ||||||||
| 0.00 | 11 | Trenching (6" + 5" + 4/0 CPoise) | CY | |||||||
| 0.00 | 12 | Backfilling | CY | |||||||
| 0.00 | 13 | Excavation | CY | |||||||
| 0.00 | 14 | Boring | LF | |||||||
| 0.00 | 15 | Concrete | CY | |||||||
| 0.00 | 16 | Manhole install & racking 8'x8'x8' | EA | |||||||
| 0.00 | 17 | End Bells - 6" | EA | |||||||
| 0.00 | 18 | End Bells - 5" | EA | |||||||
| 0.00 | ||||||||||
| AF Form 3052, Aug 85 PREVIOUS EDITION IS OBSOLETE |
&RFA4608-16-R-0013
Attachement 10
Equipment Cost
| NOTE: | OMB No. 0704-0193 (REV) | |||||||||
| THIS | CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| COLUMN | CONTRACTOR | ADDRESS | ||||||||
| DOES | ||||||||||
| NOT | CONTRACT FOR (WORK TO BE PERFORMED) | AVAILABLE FOR CONSTRUCTION (afc) | ||||||||
| REPAIR PRIMARY DISTRIBUTION LINE - BODCAU TIE | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| FA4608-16-R-0013 / AWUB 11-0052 | OTHER | |||||||||
| MATERIAL COST | LABOR COSTS | DIRECT | LINE | |||||||
| UNIT | LINE | UNIT OF | COST | TOTAL | ||||||
| LABOR | NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | UNIT | TOTAL | (EQUIP) | |
| COST | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (8) | (9) | (10) | ||
| 0.00 | 0 | 0 | 0.00 | 0 | ||||||
| 1 | S&C PMS Selector Switch - 4way/900A | EA | ||||||||
| 2 | ||||||||||
| 3 | group mounted pole switch w/ horiz config | EA | ||||||||
| 4 | Core drill existing transformer pads | EA | ||||||||
| 5 | 40' class II poles / hardware | EA | ||||||||
| 6 | crane equip rental (MH, Poles, switches) | EA | ||||||||
| 7 | dig permit | EA | ||||||||
| 8 | cable testing | LOT | ||||||||
| 0.00 | ||||||||||
| 0.00 | ||||||||||
| 0.00 | ||||||||||
| 0.00 | ||||||||||
| 0.00 | ||||||||||
| 0.00 | ||||||||||
| 0.00 | ||||||||||
| 0.00 | ||||||||||
| 0.00 | SHEET SUBTOTAL | |||||||||
| AF Form 3052, Aug 85 PREVIOUS EDITION IS OBSOLETE |
&RFA4608-16-R-0013
Attachement 10
Demolition Cost
| OMB No. 0704-0193 (REV) | |||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| CONTRACT FOR (WORK TO BE PERFORMED) | AVAILABLE FOR CONSTRUCTION (afc) | ||||||||
| REPAIR PRIMARY DISTRIBUTION LINE - BODCAU TIE | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| FA4608-16-R-0013 / AWUB 11-0052 | OTHER | ||||||||
| MATERIAL COST | LABOR COSTS | DIRECT | LINE | ||||||
| LINE | UNIT OF | COST | TOTAL | ||||||
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | UNIT | TOTAL | (EQUIP) | |
| (1) | (2) | (3) | (4) | (5) | (6) | (8) | (9) | (10) | |
| 1 | Remove UG Feeder 2" BFG | LF | |||||||
| Remove poles & assoc hardward | ea | ||||||||
| remove old pad mounted switches | ea | ||||||||
| remove old concrete | cy | ||||||||
| remove unused bollards | ea | ||||||||
| SHEET SUBTOTAL | |||||||||
| AF Form 3052, Aug 85 PREVIOUS EDITION IS OBSOLETE |
&RFA4608-16-R-0013
Attachement 10