Attachment_10-_Bid_Schedule.xls

XLS spreadsheet 51 KB Posted

Attached to
Repair primary distribution line, Bodcau tie Federal contract opportunity
Solicitation number
FA4608-16-R-0013
Issued by
Department of the Air Force Global Strike Command

About this file

Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Repair primary distribution line, Bodcau tie, newest first.
File Type Posted
BAFB_Site_Visit_Questions_-_answers__2-9.pdf PDF
Question__1.docx DOCX document
Attendance_Sheet.pdf PDF
Attachment_4_-_AF66.pdf PDF
Attachment_3-_Environmental_Req'ts_(Oct_15).pdf PDF
Attachment_2_-_Drawings.pdf PDF
Attachment_7_-_Past_Performance_Questionnaire.pdf PDF
Attachment_6_-Wage_determination.pdf PDF
Attachment_1_Specifications.pdf PDF
Attachment_8_-_PPQ_cover_letter.pdf PDF
Released_Solicitation.doc DOC document
Attachment_9-_Special_Contract_Requirements.pdf PDF
Attachment_5-_Insurance.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary of Costs

NOTE:OMB No. 0704-0193 (REV)
THISCONSTRUCTION COST ESTIMATE BREAKDOWN
COLUMNCONTRACTORADDRESS
DOES
NOTCONTRACT FOR (WORK TO BE PERFORMED)AVAILABLE FOR CONSTRUCTION (afc)
PRINTREPAIR PRIMARY DISTRIBUTION LINE - BODCAU TIE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
FA4608-16-R-0013 / AWUB 11-0052OTHER
MATERIAL COSTLABOR COSTSDIRECTLINE
UNITLINEUNIT OFCOSTTOTAL
LABORNO.ITEMMEASUREQUANTITYUNITTOTALUNITTOTAL(EQUIP)
COST
(1)(2)(3)(4)(5)(6)(8)(9)(10)
0.00SUMMARY0.000
1Conductor CostsEA
2Equipment CostsEA
3Demolition CostsEA
4
TOTAL COST OPINION
00.000
NOTES:0.000
0.000
0.000
0.000.000
0.000.000
0.000.000
0.000.000
0.000.000
0.000.000
0.000.000
0.00
0.000.00
AF Form 3052, Aug 85 PREVIOUS EDITION IS OBSOLETE

&RFA4608-16-R-0013

Attachement 10

Conductor Cost

NOTE:OMB No. 0704-0193 (REV)
THISCONSTRUCTION COST ESTIMATE BREAKDOWN
COLUMNCONTRACTORADDRESS
DOES
NOTCONTRACT FOR (WORK TO BE PERFORMED)AVAILABLE FOR CONSTRUCTION (afc)
PRINTREPAIR PRIMARY DISTRIBUTION LINE - BODCAU TIE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
FA4608-16-R-0013 / AWUB 11-0052OTHER
MATERIAL COSTLABOR COSTSDIRECTLINE
UNITLINEUNIT OFCOSTTOTAL
LABORNO.ITEMMEASUREQUANTITYUNITTOTALUNITTOTAL(EQUIP)
COST
(1)(2)(3)(4)(5)(6)(8)(9)(10)
0.001Manhole install & racking 10'x10'x8'EA
215KV EPR Conductors - # 750 kcmilLF
315KV EPR Conductors - # 2 AWGLF
4Bare Copper Ground - # 4/0 AWGLF
515 KV Cable Terminations - 750 kcmilEA
615 KV Cable Terminations - 2 AWGEA
7Schedule 40 PVC - 6"LF
8Schedule 40 PVC - 5"LF
9PVC-Coated RGS Elbow - 6"Ea
10PVC-Coated RGS Elbow - 5"Ea
0.0011Trenching (6" + 5" + 4/0 CPoise)CY
0.0012BackfillingCY
0.0013ExcavationCY
0.0014BoringLF
0.0015ConcreteCY
0.0016Manhole install & racking 8'x8'x8'EA
0.0017End Bells - 6"EA
0.0018End Bells - 5"EA
0.00
AF Form 3052, Aug 85 PREVIOUS EDITION IS OBSOLETE

&RFA4608-16-R-0013

Attachement 10

Equipment Cost

NOTE:OMB No. 0704-0193 (REV)
THISCONSTRUCTION COST ESTIMATE BREAKDOWN
COLUMNCONTRACTORADDRESS
DOES
NOTCONTRACT FOR (WORK TO BE PERFORMED)AVAILABLE FOR CONSTRUCTION (afc)
PRINTREPAIR PRIMARY DISTRIBUTION LINE - BODCAU TIE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
FA4608-16-R-0013 / AWUB 11-0052OTHER
MATERIAL COSTLABOR COSTSDIRECTLINE
UNITLINEUNIT OFCOSTTOTAL
LABORNO.ITEMMEASUREQUANTITYUNITTOTALUNITTOTAL(EQUIP)
COST
(1)(2)(3)(4)(5)(6)(8)(9)(10)
0.00000.000
1S&C PMS Selector Switch - 4way/900AEA
2
3group mounted pole switch w/ horiz configEA
4Core drill existing transformer padsEA
540' class II poles / hardwareEA
6crane equip rental (MH, Poles, switches)EA
7dig permitEA
8cable testingLOT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00SHEET SUBTOTAL
AF Form 3052, Aug 85 PREVIOUS EDITION IS OBSOLETE

&RFA4608-16-R-0013

Attachement 10

Demolition Cost

OMB No. 0704-0193 (REV)
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (WORK TO BE PERFORMED)AVAILABLE FOR CONSTRUCTION (afc)
REPAIR PRIMARY DISTRIBUTION LINE - BODCAU TIE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
FA4608-16-R-0013 / AWUB 11-0052OTHER
MATERIAL COSTLABOR COSTSDIRECTLINE
LINEUNIT OFCOSTTOTAL
NO.ITEMMEASUREQUANTITYUNITTOTALUNITTOTAL(EQUIP)
(1)(2)(3)(4)(5)(6)(8)(9)(10)
1Remove UG Feeder 2" BFGLF
Remove poles & assoc hardwardea
remove old pad mounted switchesea
remove old concretecy
remove unused bollardsea
SHEET SUBTOTAL
AF Form 3052, Aug 85 PREVIOUS EDITION IS OBSOLETE

&RFA4608-16-R-0013

Attachement 10

File details come from the government source that posted it. Updated .