Q A.docx
DOCX document 15 KB Posted
- Attached to
- CATM Range Maintenance & Repair Federal contract opportunity
- Solicitation number
- FA4608-16-R-0012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Signed_Amendment_1.pdf | ||
| RFP.doc | DOC document | |
| Attachment_1_-_Environmental_Requirements.doc | DOC document | |
| Redacted_Brand_Name_J A.pdf | ||
| Q A.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A Q1. What size are the bullet fragment drums?
A. O/H 55 gallon drums
Q2. Can the government provide the pallets for the drums?
A. Yes.
Q3. What is the quantity and part number of the DCU filters?
A. DCU filters, 12 filters Part# NF20060-L, DCU is a Donaldson Torit Model DFT2-12
Q4. Please provide appendix A that is referenced in the PWS 1.4.
A. Appendix A is located at the end of the Performance Work Statement in section C of the RFP.
Q5. Please provide drawings of the range.
A. Drawings are proprietary and will be made available at contract awar Q6. Can you post pictures of the range?
A. No. Due to the individual needs of any interested parties, the Government will not provide pictures of the range. A pre-bid site visit will be held in lieu of pictures.
Q7. PWS 1.5 indicates 20 random locations for testing. This is 10 times more than other federal contract requirements. Typically the lead removal verification is taken by the waste water generated from the range. And the customer does a visual inspection.to ensure cleanliness. There is a significant cost savings by not testing the range using standards written by the Housing and Urban Development (HUD) in child occupied facilities for lead paint abatement. Will you consider deleting this requirement?
A. No. Per discussion with Base Bioenvironmental random sampling ensures the range is cleaned throughout the entire paved area and identifies potential “hot spots” in paved areas between the firing ling and target line.
Q8. When the range last serviced and what was done?
A. The range was last serviced in January 2015. The bullet trap was emptied and the auger motor was replaced.
Q9. When was the range built?
A. Range construction finished January 2010.
Q10. Can you provide facility drawings so that we can determine the layout and square footage that will be involved in the scope of work?
A. Drawings are proprietary and will be made available at contract award.
Q11. Is the bullet trap system currently in working condition?
A. Yes.
Q12. What is the age of the bullet trap system?
A. Bullet trap is the same overall age as the range January 2010, parts are replaced as they break.
Q13. Is there a pre-bid walk scheduled for this scope of work? If so, is this a mandatory site visit?
A. Yes, based on the questions asked, we have now scheduleda pre-bid walk through for 4 April 2016, at 9:00 a.m. This is not a mandatory site visit and, any questions asked at the site visit will be written down posted to FBO. Request all vendors planning to attend the pre-bid site visit notify the Contract Administrator, SrA Kent Pendleton, if you are planning to attend, not later than 28 March 2016.
Q14. Is there an approved/preferred vendor list for laboratory analysis of the samples obtained or for the 3rd party contractor which will be obtaining the samples?
A. No. However, the 3rd party contractor providing the laboratory results should certified to perform the tests required.