Section J Attachment 16 - APS V Optional Task SOO rev4.docx

DOCX document 494 KB Posted

Attached to
Air Vehicle Planning System V
Solicitation number
FA4600-11-R-0028
Issued by

About this file

Attachment 16 APS V Optional Task SOO

View the file

Other files

File Type Posted
FA4600-11-R-0028 0004 RFP.doc DOC document
Section J Attachment 3 APS V DD Form 254 0003 3 Aug 11.doc DOC document
Section J Attachment 14 - APS V Price Model 0003 28Jul11.xls XLS spreadsheet
FA4600-11-R-0028 0002 Amendment.doc DOC document
Section J Attachment 17 - APS V SCRs 0002 v2.xls XLS spreadsheet
Section J Attachment 1 - APS V PWS FINAL - 29 APR 11.doc DOC document
Amendment 0001.doc DOC document
A003 - SDP.pdf PDF
A016 - R M.pdf PDF
A004 - DAL.pdf PDF
A010 - Training Materials.pdf PDF
Section J Attachment 12 - Subcontractor Teaming.doc DOC document
A011 - PMR Package.pdf PDF
Section J Attachment 15 - DOL EEOC Clearance Request Information Form.doc DOC document
A017 - IA Deliverables.pdf PDF
Section J Attachment 10 - PP Questions.docx DOCX document
A015 - SDD.pdf PDF
A008- STR.pdf PDF
A006 - CDRL Metrics.docx DOCX document
A002 - CDRL Metrics.docx DOCX document
A019 - Technical Report.pdf PDF
A002 - IMS.pdf PDF
Section J Attachment 5 APS CPIF Plan 27 Apr 11.docx DOCX document
Section J Attachment 6 - NCIC Data.docx DOCX document
Section J Attachment 13 - Client Authorization Letter.doc DOC document
Section J Attachment 11 - PP Tracking Record.docx DOCX document
A003 - SDP.pdf PDF
A011 - PMR Package.pdf PDF
A012 - Monthly.pdf PDF
A006 - CDRL Metrics.docx DOCX document
Q A 1.doc DOC document
Section J Attachment 10 - PP Questions.docx DOCX document
A015 - CDRL Metrics.docx DOCX document
A014 - Socio.pdf PDF
Section J Attachment 4 - AP2 APS V Revised 18 Nov 2010 .doc DOC document
A018 - CSPEI.pdf PDF
A001 - PMP.pdf PDF
Section J Attachment 15 - DOL EEOC Clearance Request Information Form.doc DOC document
A010 - Training Materials.pdf PDF
A017 - IA Deliverables.pdf PDF
Section J Attachment 11 - PP Tracking Record.docx DOCX document
MPAS CDRL —
Section J Attachment 13 - Client Authorization Letter.doc DOC document
A007 - Users Manuals.pdf PDF
Section J Attachment 6 - NCIC Data.docx DOCX document
Section J Attachment 8 - PP Information.docx DOCX document
Section J Attahcment 9 - PP Performance Questionnaire Cover Letter.doc DOC document
Section J Attachment 7 - Cross Reference Matrix of PP Questions.docx DOCX document
A006 - STP STD.pdf PDF
A008 - CDRL Metrics.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4600-11-R-0028

Attachment 16

STATEMENT OF OBJECTIVES

TO

“INCORPORATE WEAPON WITH LAUNCH ACCEPTABLE REGION (LAR) REQUIREMENT INTO APS” TASK ORDER

AIR VEHICLE PLANNING SYSTEM V

(APS V)

CONTRACT

AIR VEHICLE PLANNING SYSTEM V (APS V)

INCORPORATE WEAPON WITH LAUNCH ACCEPTABLE REGION (LAR) REQUIREMENT INTO APS

STATEMENT OF OBJECTIVES (SOO)

1.0 SCOPE. USSTRATCOM requires software engineering, hardware, design, integration, technical support, and training services for planning software used by the Integrated Strategic Planning and Analysis Network (ISPAN) for air vehicle planning accomplished by the JFCC Global Strike.

2.0 Background.

2.1 The Air Vehicle Planning System (APS) software is a full fidelity (able to plan fully validated missions down to the individual sortie level) force-level mission planning system that performs planning functions in support of the nation’s nuclear war plan and Conventional Air Launched Cruise Missile (CALCM). APS is currently used to plan missions involving the following aircraft and weapon systems: B-52, B-2, KC-135, KC-10, RC-135, U-2, EP-3, Air Launched Cruise Missile (ALCM), Advanced Cruise Missile (ACM), and CALCM. APS also contains capability to plan dual capable aircraft (DCA), F15/16/18, but this functionality is not in current use. This application is used to perform Air Vehicle planning operations, including maintenance operations, exercise and adaptive planning for the Operational Plan (OPLAN), non-nuclear OPLAN planning, and non-nuclear planning. Tasks include Route Generation, Mating and Ranging, Timing, Verification, Data Products and Tape Build. Results and outputs are also used by other applications. The software is also used to perform maintenance operations, as required, for an existing OPLAN.

2.2 APS provides an automated planning system for manned and unmanned air vehicles. This will include bombers, dual capable aircraft, cruise missiles, reconnaissance air vehicles, and air refueling support aircraft. APS de-conflicts air vehicle missions and provides plan development and maintenance in support of strategic and non-strategic plans. APS provides interactive time-phased graphical displays supporting: air vehicle routing, route conflict resolution, reconnaissance objective acquisition analysis, threat and weapon effect analysis, and timing plan development. APS provides the capability to create plans, reports, and capture images for hardcopy output, transmission, and inclusion in electronic briefing slides. Mission management capabilities include separate management functions for Planners, Team Leaders, and Sortie Managers supporting working sorties and master sorties. The system provides connectivity with Air Force Mission Support System (AFMSS), Portable Flight Planning System (PFPS), and other systems providing a distributed collaborative planning environment. It is responsive to advancements in: military planning guidance; computing architectures and standards; database management systems; hardware and software technology; weapons and weapon systems; and net-centric infrastructure requirements.

3.0 Objectives. The objective of this pre-priced optional task order will be to provide a costed estimate to incorporate the ability to plan a guided gravity weapon into the existing APS version 4.8 program within 18 months. The minimum requirements and expectations would be to automatically plan an optimized B2A route including LAR, manually plan the LAR, vary flight constraints, flight conditions, address Digital Topographic Elevation Data (DTED) in LAR computations and plan weapon release points central to the LAR. This pre-priced optional task order should detail the methodology to modify the APS software to include how the contractor will modify the current APS software to plan the weapon with the LAR capability to meet the needs of JFCC Global Strike by using a set of decision priorities and produce a verified and validated mission. The contractor will provide a clear scoring and justification to address the following priorities in order of: responsiveness to the planners’ requirements, schedule risk, cost, technical risk and maintainability and supportability.

4.0 Summary. The objectives of APS V are to provide air vehicle planning and analysis support for ISPAN at the best value to the Government. The government seeks the best value for the APS V contract. APS is a highly complex system that requires software maintenance, enhancements and possible development. Specific requirements for the pre-priced optional task order are listed above and in Section L.

image3.png image1.png image2.jpeg

File details come from the government source that posted it. Updated .