STATEMENT OF WORK (SOW)
TEMPORARY LODGING FACILITIES
DEMOLITION
Bldgs. 158, 159, 160, 161, 162, 163
1. DESCRIPTION OF SERVICES: The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform all work in accordance with these specifications. Work includes the demolition and disposal of all listed structures as well as their foundations. All materials inside the structures will be disposed of as well. Once the site has been cleared, ground will be graded and topsoil will be placed and seeded.
1.1. Work Included:
1.1.1. All utilities running to the listed facilities are to be disconnected and capped. To disconnect the utilities, please contact the utilities owners listed below. The contractor is responsible for paying any costs to the utility owners for the disconnection service.
1.1.1.1. Electrical Service: Verendrye Electric Cooperative – 1-800-472-2141
1.1.1.2. Water/Wastewater Services: Base Utilities – 701-727-5050
1.1.1.3. Gas Service: Montana-Dakota Utilities – 701-857-6821
1.1.2. Transformers shown in the project area will be removed by Verendrye Electric
Cooperative. Contractor will be responsible for removing any electrical equipment pads in the project site.
1.1.3. Safely demolish all 6 facilities and foundations, and haul all demolished materials off base to an authorized disposal facility. The demolition is to include all materials, mechanical equipment, and items within the facilities as well.
1.1.4. The site of the demolished buildings will be filled with appropriate fill material and the top 6 inches of material will be approved topsoil material. The site will be graded to match
1.1.5. The project area will then be grass seeded using an approved method.
1.1.6. The contractor will be responsible for maintaining the project site area for 1 year after project completion in order to establish and sustain satisfactory grass growth.
2. EXECUTION:
2.1. The contractor is required to abide by all terms listed in the provided specifications.
2.2. The most suitable and safe method of demolishing the existing buildings will be up to the determination of the contractor.
2.3. All bushes in trees in the project area (as shown on the map) can be removed and disposed of or left in place. This decision can be made at the discretion of the contractor.
2.4. All light poles in the project area are to remain in place and are not to be damaged by the contractor.
2.5. The contractor is encouraged to recycle and reuse as much of the material as possible.
The contractor is allowed to resell or donate any materials within the buildings to be demolished.
2.6. As-built drawings of the existing facilities will be provided to facilitate their demolition.
2.7. Any damage done to any pavements or structures not indicated as part of the demolition on the drawings will be repaired at the expense of the contractor.
2.8. All listed facilities have been be examined for asbestos and there have been no asbestos material found. In the event that ACM is discovered the contractor will immediately notify the CO.
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES:
3.1. Utilities. All reasonable quantities of utilities shall be made available at no cost to the Contractor.
3.2. Storage. Material and equipment storage will be approved by CO. If approved, materials shall be placed in a neat appearance, and in a manner that allows safe continued facility use.
3.3. Damage to Government Property. The Contractor shall notify the Government when damage to government property is discovered. Any damage to government property caused by the Contractor shall be repaired or replaced by the Contractor at the Contractor’s expense. The Contractor shall annotate on the inspection report, the damage, the cause of damage (if known) and a projected proposal for repair.
4. GENERAL INFORMATION:
4.1. Hours of Operation. 7:30 AM to 4:00 PM, Monday through Friday, except Federal Holidays listed in paragraph 4.2.
4.2. Federal Holidays.
New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January Washington’s Birthday - 3rd Monday in February Memorial Day - last Monday in May Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December
4.3. Base Closures. Work scheduled, but not accomplished because of base closure due to weather, exercises, or actual alerts, shall commence as soon as possible after reopening the base, unless otherwise directed by the CO.
4.4. Security Requirements. Contractor personnel will be limited to work areas.
4.5. The Contractor shall be responsible for obtaining all necessary passes, decals or other items required for access to the areas in which work will be performed. The Contractor shall request contractor passes through the Contracting Officer by providing the name, social security number, date of birth, work phone, and home phone of employees requiring passes. Personnel must adhere to the REAL ID Act of 2005 to ensure access to base is granted. Pass requests will be forwarded by the Contracting Officer to the 5th Security Forces Squadron Visitor’s Control Center for approval and issuance. Upon completion or termination of the contract, or an individual’s release from employment, the Contractor shall retrieve the identification issued above and surrender it to the 5th Security Forces Squadron Pass and Registration Section located in the Visitor Control Center. Template will be provided at contract award and due NLT 10 days after award.
4.6. Reporting Requirements. Contractor personnel shall report, to an appropriate authority, any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor’s employees shall be briefed by their immediate supervisor prior to entering the base.
4.7. Notification of Environmental Spills. The Contractor or their authorized representative shall report any spills immediately by calling 723-2461 or 911 from a standard phone. If the Contractor spills or releases any substance listed in 40 CFR 302, Designation, Reportable Quantities, and Notification or general fluids into the environment. In these cases, the type of material and quantity spilled shall be reported. The Contractor shall be held liable for the spill or release of such substances, and is expected to clean up all spills of less than 25 gallons. The Contractor shall be liable for the cleanup and cost of any spill greater than 25 gallons that occurs and is determined to be contractor negligence.
4.8. The Contractor shall be familiar with, and follow the most current "Full Spectrum Threat Response (FSTR) Plan 10-2". The Contractor is required to have and maintain Safety Data Sheets (SDS) on all Hazardous Material (HM). The Contractor shall provide a list of all HM to the CO at least 30 days prior to entering the base. The CO will distribute the list to all appropriate agencies for approval. The list shall contain the following information: the expected to be used including a copy of the SDS, an estimate on the quantity of the HM expected to be used during the performance of the contract, and anticipated storage location for each HM intended for use.
4.9. Compliance with Laws and Regulations. The Contractor shall be knowledgeable of and comply with all applicable federal, state, and local laws, regulations, and requirements regarding environmental protection to include AFI 32-7080, Pollution Prevention Program, AFI 32-7042, Solid and Hazardous Waste Compliance, ACC Manual 32-7051, Environmental Quality Manual, 40 CFR 273, 40 CFR 133, North Dakota Administrative Code 33-24-02-06, and base Hazardous Waste Management Plan (September 2005) 5 BW-32-7043. In the event of environmental laws/regulations/requirements change during the term of the contract, the Contractor shall comply with such laws/regulations as changed. The Contractor shall comply with the base Hazardous Waste Management Plan (September 2005) when turning in wastes generated from spill cleanup.
4.10. Traffic Laws. The Contractor and its employees shall comply with base traffic regulations.
4.11. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned or privately owned vehicle while on Minot Air Force Base.
4.12. For Official Use Only (FOUO). The Contractor shall comply with DoD 5400-7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
4.13. Personnel. Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection.
4.14. The Government is authorized to restrict the employment under the contract of any contractor employee or prospective contractor employee, who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
4.15. Fire and Emergency Reporting. Call 723-2461 or 911 from a standard phone.
Missile Avenue
Tanker Trail
Ea gle
W ay
Rocket Ro ad
Sum m it D rive
Huey L ane
Flight Line D rive
Roa ming Ro ad
E Stree t
Arrowhead Drive
Fir ing
La ne
H S t re e t
Roa d-C
W av er ly
W ay
Shawnee Road
Choppe r P ath
Ta ng ley R oa d Gla cier D rive
Largo L ane
Go lf C ar t P ath
Cruis e M issi le La ne
Gram ercy Co urt
Minu te Man D rive Co ra l C ou rtDel M ar
Court
Rail Road
Pemb ro ok La neFigh ter Road
Avion WayLoc ke
L a ne
Po pla r P lac e
Dako ta Court
Hampton Loop
De lta
D riv e
Sin gle Tree C ircle
Rock R idge Circle
Sirocco Drive
Carlton Court
Wall S tre et
Che vy Chase
Bomber Bou le vard
Peac e keepe r P la ce
Pe ac ek ee pe r P la c e
Sum m it D rive
Coral Court
Bomber Bou le vard
De lta
D riv e
Minu te Man D rive
Che vy Chase
Sin gle Tree C ircle
Bomber Bou le vard
859 583 202
155205
130 120
118116
127124
135110
87 8884
109111
89 97
105 101 130
110 137
108 134 133
103 124
139142
95 126
109106
112114
101 102
116 112
107108105
113115
110 113115
102 103
103 123
103108
114 118
117119
114 115
103 107 104 102
136 138
135126
108 155
104 103
122103
105 120101
137 158
149102
170 182
116147
118 119
134 138 140
T-1 251
³
1 inch = 833 feet 1 inch = 254 meter s 1:1 0 00 0
Docum ent P ath: Y:\ 10. C EO -O per ati ons\ 7. CE OE - O ps Engi neer ing \5. C EO ER - R equi rem ent s & O pt im izat ion \1. F CAT- Bu ild er 2015\ 3. E .A. - \P erso nal Fol der s\Er azo\ Ar cm ap\T LF\ 995 Sit e. mxd
Rev isi on By Dat e C re a t e d 28 M A R 2 0 1 9T E
Key to Fe a tu re s
Th is m a t e ria l is Fo r O f f icia l Use O n ly.
Th is m a p is fo r r e f er e n ce a n d p l a n n in g p u r p o se s o n l y. D o n o t u se fo r e n g in e e r in g , n avi g a t io n , t a rg e t in g , o r su rve yi n g w o rk . E ve r y re a so n a b l e e f fo r t h a s b e e n m a de t o e n su r e t h e a ccu r a cy o f th e in f o rm a t io n ;
h o we ve r, e r r o rs fr o m i n fo r m a ti o n so u r ce s u se d to de ve lo p t h is m a p m a yb e re f le ct e d o n th i s m a p . Th e Ge o Ba se In t e g ra t io n O f fi ce a n d it s st a ff sh al l n o t b e h e ld li a b le fo r a n y e rr o r s, o m i ssio n s, o r d a m a g e s th a t r e su lt f r o m in a p p r o p r ia t e u se o f th i s do cu m e n t .
Un a u th o ri ze d r e p ro d u cti o n , dist ri b u t io n , p u b l ica t io n , o r e xh ib i ti o n o f t h is m a p is STR ICTICLY PR O H IBITED. In fo r m at i o n sa f e g u a rdi n g a n d p r o p e r di sp o sa l is t h e re sp o n si b il it y o f t h e i n di vi du a l , ag en cy a n d/o r co m p a n y re q u e st i n g a n d ta k i n g p o sse ssi o n o f t h is m a p .
Th e o r ig i n a l size o f th i s m a p i s AR CH E (36" X 48"). An y a lt e ra t io n s to t h e di g it a l fi le o r h a r dco p y p a g e wil l ca u se di sto r t io n to th e size o r sh a p e o f t h e m a p ’s fe a t u r e s a n d re su l t in e rr o r s i n m e a su r ed
Ple ase re po rt a ny m a p e rrors or om issions to th e Ge o Base Int e g ra tion O f fice Bu ilding 445 - R oom 140
DSN: 453-4811
Com m e rcia l: 701-723-4811
MI NO T AI R F O RCE BASE
MI NO T, N OR TH DAK OT A
TLF Site Pla n
DEPA RTM EN T O F THE A IR FO RC E
D IR E C T O R A T E O F E N G I N E E R I N G & S E R V I C E S D C S /L E E - WA S H I N G T O N , D . C
AI R F O R C E G L O B A L S T R I K E C O M M A N D
C O M P R E H E N S I V E P LA N
5t h C I V I L E N G I N E E R S Q U A D R O N
EN G I N E ER IN G FL I G H T
D R A FT I N G / S U R V E Y / G E O B A S E S H O P
D at e: 6 /2 0/ 2 01 9
Installation }} Fe nce
Gate Building
To we r Com mu nication s Tower Pavem ent Slab Sid ewalk
Pavem ent Ma rking s Airfield Surface Roa d Cen ter lin e Parkin g Lo ts, D riveways
Pavem ent Branch Roa d Area
0 407 814203 .5 Fe et
D e s ig n e d B y : 20 J U N 2 0 1 9T E
Project Site
Ýò
Ýò èÅ èÅ èÅèÅ èÅ èÅ èÅ èÅ èÅ èÅ èÅ èÅ èÅ èÅ èÅ èÅ èÅ èÅ èÅ èÅ
Missile Avenue
Bow ling
A lley
Rock Rid ge Circle
104 108
³ 1 inch = 100 feet 1 inch = 30 m eter s
1:1 2 00
Docum ent P ath: Y:\ 10. C EO -O per ati ons\ 7. CE OE - O ps Engi neer ing \5. C EO ER - R equi rem ent s & O pt im izat ion \1. F CAT- Bu ild er 2015\ 3. E .A. - \P erso nal Fol der s\Er azo\ Ar cm ap\T LF\ TLF Ut il it ies. m xd
Rev isi on By Dat e C re a t e d 28 M A R 2 0 1 9T E
Key to Fe a tu re s
Th is m a t e ria l is Fo r O f f icia l Use O n ly.
Th is m a p is fo r r e f er e n ce a n d p l a n n in g p u r p o se s o n l y. D o n o t u se fo r e n g in e e r in g , n avi g a t io n , t a rg e t in g , o r su rve yi n g w o rk . E ve r y re a so n a b l e e f fo r t h a s b e e n m a de t o e n su r e t h e a ccu r a cy o f th e in f o rm a t io n ;
h o we ve r, e r r o rs fr o m i n fo r m a ti o n so u r ce s u se d to de ve lo p t h is m a p m a yb e re f le ct e d o n th i s m a p . Th e Ge o Ba se In t e g ra t io n O f fi ce a n d it s st a ff sh al l n o t b e h e ld li a b le fo r a n y e rr o r s, o m i ssio n s, o r d a m a g e s th a t r e su lt f r o m in a p p r o p r ia t e u se o f th i s do cu m e n t .
Un a u th o ri ze d r e p ro d u cti o n , dist ri b u t io n , p u b l ica t io n , o r e xh ib i ti o n o f t h is m a p is STR ICTICLY PR O H IBITED. In fo r m at i o n sa f e g u a rdi n g a n d p r o p e r di sp o sa l is t h e re sp o n si b il it y o f t h e i n di vi du a l , ag en cy a n d/o r co m p a n y re q u e st i n g a n d ta k i n g p o sse ssi o n o f t h is m a p .
Th e o r ig i n a l size o f th i s m a p i s AR CH E (36" X 48"). An y a lt e ra t io n s to t h e di g it a l fi le o r h a r dco p y p a g e wil l ca u se di sto r t io n to th e size o r sh a p e o f t h e m a p ’s fe a t u r e s a n d re su l t in e rr o r s i n m e a su r ed
Ple ase re po rt a ny m a p e rrors or om issions to th e Ge o Base Int e g ra tion O f fice Bu ilding 445 - R oom 140
DSN: 453-4811
Com m e rcia l: 701-723-4811
MI NO T AI R F O RCE BASE
MI NO T, N OR TH DAK OT A
TLF Pa ve m e n t Utilit ie s Pla n
DEPA RTM EN T O F THE A IR FO RC E
D IR E C T O R A T E O F E N G I N E E R I N G & S E R V I C E S D C S /L E E - WA S H I N G T O N , D . C
AI R F O R C E G L O B A L S T R I K E C O M M A N D
C O M P R E H E N S I V E P LA N
5t h C I V I L E N G I N E E R S Q U A D R O N
EN G I N E ER IN G FL I G H T
D R A FT I N G / S U R V E Y / G E O B A S E S H O P
D at e: 6 /2 0/ 2 01 9
Verendrye Dem arcati on Elec Service Poi nt Elec S tati on Transformer
") Verendrye Fuse Cabi net Switch
Surface St ructure ! Verendrye Support St ructure
Anchor Guy ! Street Light
Verendrye Span Verendrye Device Leader wHydrant wSystem Valve wTestStation wM anhole Water Main Water Servi ce èÅ Water Ct rl Val ve Gas Main Gas Service Gas_Noncontrollable_Fi tt ing
Ýò Gas Service Point Gas_Downstream_P ipe
QJVFGIO_310.dManhole_P Road Centerline Wall Fence Gate Building
Curb/Gut ter Playground Road Pavem ent B ranch Underground Secondary
0 50 10025 Feet
D e s ig n e d B y : 14 F e b 2 0 1 9T E
156 156
Bow ling
A lley
Missile Avenue
Docu men t Pa th: Y:\1 0. CEO-Operation s\7. CEOE - Op s Engine erin g\5. CE OER - Requ irem en ts & Opt im iza tion\1 . FCAT-Builder 20 15\ 3. E.A .-\ Personal Folde rs\E razo \Arcm ap \TL F\ TL F Map .mxd
Revision By Date Ke y to Fe ature s ³
0 6 123 9
M eter s
0 20 4010 30
Feet
1 in ch = 2 0 feet 1 in ch = 6 meters1:237 This m ate rial is Fo r Offic ial Us e On ly.
Unauthorize d re p rod uc tion, d is tribution , public ation or exh ibitio n o f this m ate rial is 'STRICTLY P ROHIBITED'.
This map is fo r r e fe re n c e and plan nin g purpo s e s on ly. Do n ot us e fo r e n gine e r in g, navigatio n, targe ting, or surve ying wor k. Eve ry r e as onable e ff ort has be e n mad e to e n sur e the ac c urac y of th e in for m atio n; howeve r, e rr or s f ro m in fo rm atio n s ourc e s us e d to d e ve lop th is m ap m aybe r e fle c te d o n th is m ap. Th e Ge oBas e Inte gratio n Offic e an d its staff s hall not be h e ld liable fo r any e rr or s, o m is s ion s, o r d am age s that r e s ult fro m inap pr op riate us e of this d o c um e nt.
Unautho rize d r e p ro duc tio n, d istr ibutio n, public atio n, o r e xhibitio n of this map is STRICTICLY P ROHIBITED.
Info rm ation saf e guard ing an d p ro pe r d is po sal is th e r e s p on s ibility o f the ind ividual, age n c y and /or c o m pany re que s tin g an d takin g p os s e s s ion of this map.
The or iginal s ize o f th is m ap is ARCH D (24" X 36"). Any alte ration s to the d igital f ile o r har d c o py pag e will caus e d istortio n to th e s ize or s hape of the map’s f e atur e s an d r e sult in e r r or s in m e asur e d d istanc e s.
Ple as e re port any map e rrors or om is sions to the Ge oBase Inte gratio n Offic e Build in g 445 - Ro om 140
DSN : 453-4811
Com m e rc ial: 701-723-4811
W e bs ite : https ://afgs c .ge obas e.us .af.m il/Das hboard /
MINOT AIR FORCE BASE
MINOT, NORTH DAKOTA
TLF De m olition
DEPARTMENT OF THE AIR FORCE
DIR EC TO R ATE OF EN G INE ER IN G & SE R VIC ES DC S/LE E - WAS H ING TO N , D .C
AIR FORCE GLOBA L S TRIK E COM MA ND
CO MP RE HENS IV E P LA N
5th CIV IL E NG INE ER SQ UA DRON
ENGINEE RING FLIGHT
DRA FTING/SURVE Y/GE OBA SE S HOP
Date: 6 /20/2019
For Offic ial Us e Only (FOUO)
Building
Tower
Pavement Slab
Sidewalk
Road Centerline
Parking Lots, Driveways
Road Area
! Street Light
! Transformer
Demolish
Created TE 12JUN19
Contractor is required to demolish and dispose of all highlighted structures, including building foundations/footings and electrical equipment pads. Any excavated areas left below grade will then have suitable material brought in to make the areas level with surrounding grade and then it will be seeded and maintained to establish grass growth.
Notes: Light Poles are to be left as is. Any bushes and trees can be removed if necessary and disposed of by the contractor.
| Attachment 1 - Statement of Work - Demo TLFs |
| Demo TLFs - Project Drawings |
| TLF Site Map |
| TLF Utilities |
| TLF Demolition Map |
File details come from the government source that posted it.