Attachment_6_-_Questions_and_Answers_part_2.docx
DOCX document 15 KB Posted
- Attached to
- Replace Lighting Bldg 286 Federal contract opportunity
- Solicitation number
- FA4528-17-R-0004
About this file
Attachment 6 - Questions and Answers part 2
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Offeror Questions and Government Responses QJVF 15-0041, Replace Lighting Building 286
FA4528-17-R-0004
Attachment 6a 14 April 2017
1. Could we get the Reflected Ceiling Plan from the A sheets for reference?
Not Available
2. At the walk, I did not see the lighting control panels to be replaced. What information and pictures do you have to work with?
See drawings and specifications.
3. Where are drawings identified in solicitation FA4528-17-R-0004 spec section 01 11 00, 1.1.1.4?
See new attachments
4. What are the allowable shutdown schedules for switch overs?
See Specifications
5. Who is responsible for providing the design drawings?
See new attachments
6. Has an environmental site assessment been completed and if so can it be provided?
None will be provided.
7. Are there any know environmental hazards?
No.
8. Who is providing the record drawings for solicitations FA4528-17-R-0003 and FA4528-17-R-0004 as shown is specifications section 01 78 00 1.2.2 See Specifications.
9. Why are the two solicitations being separated and not included as one?
N/A
10. Will the Government be requiring the electrical equipment to be painted as identified in section 26 00 00 3.1?
See Specifications.
11. Where are the source drawing identified in section 01 37 00 1.5.2 See Specifications.
12. Will the Government be requiring full compliance with the EM385 as stated in the specifications?
Yes.
13. Will access to each site be escorted or will the contractor be allowed to be badged?
N/A
14. What time restraints for access should be allowed for entry from the front gate to each project site?
N/A
15. What are the access routes are available to each project site?
Bomber Blvd to Peacekeeper place is the primary route.
16. What specific perimeter area lighting of buildings are required to be replaced?
See Drawings.
17. Can a lighting operation plan be provided for each building?
No.
18. Where is the specification section in regards to raceways?
Follow NEC 2017
19. Is there a typical connection detail preferred for fixture connection? Plug in or hard wired?
No.
20. Is there a preferred hanger attachment for each fixture?
No.
21. What are the normal work hours/days allowed?
See specification Addendum
22. What are no work days?
See specifications
23. What is the holiday schedule where the contractor would be limited from working?
See specifications.
24. What are the minimum credentials for the design professional?
See specifications.