AF66_Submittal_Register_revision_2_(with_amendments).pdf

PDF 99 KB Posted

Attached to
Replace Lighting Bldg 286 Federal contract opportunity
Solicitation number
FA4528-17-R-0004
Issued by
Department of the Air Force Global Strike Command

About this file

AF 66 Submittals Register revision 2 (with amendments)

View the file

Other files for this federal contract opportunity

Other files attached to Replace Lighting Bldg 286, newest first.
File Type Posted
SF30_Hubzone.pdf PDF
17-R-0004-0004.pdf PDF
Attachment_6_-_Questions_and_Answers_part_2.docx DOCX document
SF_30.pdf PDF
AF66_Submittal_Register_revision_3.pdf PDF
Attachment_6_-_Questions_and_Answers_part_2.docx DOCX document
B286_specifications_v9_(with_amendments).pdf PDF
Building_286_pdf.pdf PDF
FA4528-17-R-0004_Amendment_2.docx DOCX document
Attachment_1_-_Revised_Specifications.pdf PDF
Attachment_6_-_Revised_Questions_and_Answers.docx DOCX document
SF-30.pdf PDF
286.pdf PDF
BuildingFixture_Heights.docx DOCX document
Attachment_6_-_Questions_and_Answers.docx DOCX document
15-0041_AS_BUILT.pdf PDF
Combined_Drawings_15-0041.pdf PDF
286.dwg DWG drawing
B286_specifications_v7_(with_amendments).pdf PDF
Attachment_5_-_Financial_Responsibility.docx DOCX document
Attachment_1_-_Specification.pdf PDF
Attachment_3_-_WD.pdf PDF
Attachment_2_-_Form_66.pdf PDF
FA4528-17-R-0004.pdf PDF
Attachment_4_-_Past_Performance_Information_Form.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 8 PAGES

Replace Lighting B286

01 11 00 SD-01 Preconstruction Submittals

1.6.1Utility Outage Requests

1.6.1Utility Connection Requests

1.6.2Excavation Permits

1.6.2Welding Permits

1.8 GSalvage Plan

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 45 00.10 20 SD-01 Preconstruction Submittals

1.6 GQC Plan

01 57 19 SD-01 Preconstruction Submittals

1.4.1Preconstruction Survey

1.8 GSolid Waste Management Permit

1.4.2 GRegulatory Notifications

1.5 GEnvironmental Protection Plan

3.2.1.2 GStormwater Notice of Intent

1.5.9.1 GDirt and Dust Control Plan

1.4.4 GEmployee Training Records

GEnvironmental Manager

Qualifications

SD-06 Test Reports

Laboratory Analysis

3.2.1.3Inspection Reports

GSolid Waste Management Report

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 8 PAGES

01 57 19 3.2.1.4 GStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 GStormwater Notice of Termination

3.4.1 GWaste Determination

Documentation

GDisposal Documentation for

Hazardous and Regulated Waste

1.8 GSolid Waste Management Permit

GSolid Waste Management Report

3.4.2.1 GHazardous Waste/Debris

Management

1.4.2 GRegulatory Notifications

GSales Documentation

Contractor Certification

As-Built Topographic Survey

01 74 19 SD-01 Preconstruction Submittals

1.5 GWaste Management Plan

SD-11 Closeout Submittals

1.6Records

01 78 00 SD-03 Product Data

1.6.1Warranty Management Plan

1.6.5Warranty Tags

3.6Final Cleaning

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.6.1Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 8 PAGES

01 78 00 SD-10 Operation and Maintenance

Data

3.5 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

As-Built Record of Equipment and Materials

3.4Final Approved Shop Drawings

Construction Contract

Specifications

GCertification of EPA Designated

Items

3.7 GInterim DD FORM 1354

3.7 GChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance

Data

1.3 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 8 PAGES

02 41 00 1.2.1 GDemolition Plan

GDeconstruction Plan

1.10Existing Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

Receipts

26 05 19.10 10 SD-03 Product Data

2.1.1 GWire and Cable

2.1.3.1 GConductors

3.1Cable Manufacturing Data

SD-06 Test Reports

3.2 GTest Report(s), Inspection

Report(s), and Verification

Report(s)

26 09 23.00 40 SD-03 Product Data

2.1.1 GPhotoconductive Control Devices

3.1 GInstallation Drawings

GLight-Sensitive Control Devices

2.2.2 GDimming Ballast Controls

2.2.3 GLight Level Sensor

2.2.4 GDimmer Switch

2.2.5 GLighting Contactor

2.2.6 GPhotocell Switch

2.2.7 GOccupancy Sensors

3.3 GMotion Sensors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 8 PAGES

26 09 23.00 40 SD-06 Test Reports

3.2System Operation Tests

SD-10 Operation and Maintenance

Data

3.3Lighting Control System, Data

Package 5

26 51 00 SD-02 Shop Drawings

1.4.1 GLuminaire Drawings

1.4.2 GOccupancy/Vacancy Sensor

Coverage Layout

SD-03 Product Data

2.2 GLuminaires

2.4 GLight Sources

2.3 GDrivers, Ballasts and Generators

1.5.1 GLED Luminaire Warranty

1.4.4 GLuminaire Design Data

2.5.3.2 GVacancy Sensors

2.5.2 GDimming Controllers (Dimmers)

2.5.4 GLighting Contactor

2.8 GPower Hook Luminaire Hangers

2.6.1 GExit Signs

2.6.2 GEmergency Lighting Unit (EBU)

2.6.3 GLED Emergency Drivers

2.6.4 GFluorescent Emergency Ballasts

2.5.3.1 GOccupancy Sensors

3.1.8 GAmbient Light Level Sensor

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 8 PAGES

26 51 00 2.5.5 GLighting Control Panel

SD-06 Test Reports

1.4.5 GLED Luminaire - IES LM-79 Test

Report

1.4.6 GLED Light Source - IES LM-80

Test Report

1.4.7 GLED Light Source - IES TM-21

Test Report

1.4.8 GOccupancy/Vacancy Sensor

Verification Tests

1.4.11.3 GEnergy Efficiency

SD-07 Certificates

1.5.1.1 GLuminaire Useful Life Certificate

1.4.3 GLED Driver and Dimming Switch

Compatibility Certificate

26 56 00 SD-01 Preconstruction Submittals

1.5.2 GPhotometric Plan

1.7.1 GLED Luminaire Warranty

SD-02 Shop Drawings

1.5.1.1 GLuminaire drawings

1.5.1.2 GPoles

SD-03 Product Data

2.2 GHID, LPS, Fluorescent, Induction

and LED Luminaires

2.2.2 GLuminaire Light Sources

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 8 PAGES

26 56 00 2.2.3 GLuminaire Ballasts, Generators and Power Supply Units (Drivers)

2.3.2 GLighting contactor

2.3.3 GLighting Control Relay Panel

2.3.4 GMotion Sensor

2.3.1 GPhotocell

2.4.1 GConcrete poles

2.4.2 GAluminum poles

2.4.3 GSteel poles

2.4.4 GFiberglass poles

2.5Brackets

GObstruction Marker Luminaires

SD-04 Samples

2.2 GHID, LPS, Fluorescent, Induction

and LED Luminaires

SD-05 Design Data

1.5.3 GDesign Data for luminaires

SD-06 Test Reports

1.5.4 GLED Luminaire - IES LM-79 Test

Report

1.5.5 GLED Light Source - IES LM-80

Test Report

1.5.6 GTests for fiberglass poles

3.2Operating test

SD-07 Certificates

1.7.1 GLuminaire Useful Life Certificate

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 8 PAGES

26 56 00 SD-08 Manufacturer’s Instructions

2.4.1Concrete poles

2.4.4Fiberglass poles

SD-10 Operation and Maintenance

Data

1.7.2Electronic Ballast Warranty

1.8Operational Service

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .