Attachment 7a - Final Questions and Answers
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Offeror Questions and Government Responses QJVF 14-0031, Replace Highbay Lights Multi Bldgs
FA4528-17-R-0003
Attachment 7a 14 April 2017
1. Building 545 has high bays and strip fixtures in the vehicle area. I assume we are replacing the high bay fixtures and not replacing the strip fixtures. Is this correct?
Correct, only high bay fixtures.
2. Also the lighting in the office at Area E and the strip lighting above it were not lined out in REV 2 but I did not think those were included. Please clarify if they are since they are not high bays.
Only high bay fixtures.
3. In Building 837. I count 83 high bay fixture we are replacing. Given the layout on the record drawing looks uneven, is this count and layout correct since we are changing one for one?
See specifications for accuracy of as-built drawings.
4. What are the allowable shutdown schedules for switch overs?
See Specifications
5. Who is responsible for providing the design drawings?
See Specifications
6. Has an environmental site assessment been completed and if so can it be provided?
None will be provided.
7. Are there any know environmental hazards?
No.
8. Who is providing the record drawings for solicitations FA4528-17-R-0003 and FA4528-17-R-0004 as shown is specifications section 01 78 00 1.2.2 See Specifications
9. Why are the two solicitations being separated and not included as one?
N/A
10. Will the Government be requiring the electrical equipment to be painted as identified in section 26 00 00 3.1?
See Specifications
11. Where are the source drawing identified in section 01 37 00 1.5.2 See Specifications
12. Will the Government be requiring full compliance with the EM385 as stated in the specifications?
Yes
13. Will access to each site be escorted or will the contractor be allowed to be badged?
Sites on the flight line will be escorted.
14. What time restraints for access should be allowed for entry from the front gate to each project site?
Various.
15. What are the access routes are available to each project site?
Will be addressed at Pre-construction meeting.
16. What specific perimeter area lighting of buildings are required to be replaced?
See Drawings
17. Can a lighting operation plan be provided for each building?
No
18. Where is the specification section in regards to raceways?
Follow NEC 2017
19. Is there a typical connection detail preferred for fixture connection? Plug in or hard wired?
No.
20. What fixtures are required to be explosion proof?
None.
21. Is there a preferred hanger attachment for each fixture?
No.
22. What are the normal work hours/days allowed?
See specification Addendum.
23. What are no work days?
See Specifications
24. What is the holiday schedule where the contractor would be limited from working?
See Specifications.
25. Will aircraft be removed from work zones as the contractor needs access to the bays?
Yes.
26. What are the minimum credentials for the design professional?
See Specifications.