AF66_Submittal_Register_revision_3.pdf

PDF 98 KB Posted

Attached to
Replace Highbay Lights Multiple Buildings Federal contract opportunity
Solicitation number
FA4528-17-R-0003
Issued by
Department of the Air Force Global Strike Command

About this file

AF66 Submittal Register revision 3

View the file

Other files for this federal contract opportunity

Other files attached to Replace Highbay Lights Multiple Buildings, newest first.
File Type Posted
SF30_Hubzone.pdf PDF
17-R-0003-0004.pdf PDF
Attachment_7_-_Revised_Questions_and_Answers.docx DOCX document
sf30.pdf PDF
Attachment_7_-_Questions_and_Answers_part_2.docx DOCX document
14-0031_Specifications_revision_7_(with_amendments).pdf PDF
Attachment_14-_Building_970.pdf PDF
Attachment_7_-_Revised_Questions_and_Answers.docx DOCX document
Attachment_10_-_Building_545.pdf PDF
Attachment_1_-_Revised_Specifications.pdf PDF
Attachment_11_-_Building_765.pdf PDF
Attachment_13_-_Building_867.pdf PDF
Attachment_9_-_Building_455.pdf PDF
Attachment_12_-_Building_837.pdf PDF
FA4528-17-R-0003_Amendment_2.docx DOCX document
SF_-30.pdf PDF
BuildingFixture_Heights.docx DOCX document
14-0031_Specifications_revision_5_(with_amendments).pdf PDF
970.dwg DWG drawing
455.dwg DWG drawing
AF66_Submittal_Register_revision_2_(with_amendments).pdf PDF
867.dwg DWG drawing
761.dwg DWG drawing
Attachment_7_-_Questions_and_Answers.docx DOCX document
837.dwg DWG drawing
Combined_14-0031_revision_2_(with_amendments).pdf PDF
545.dwg DWG drawing
14-0031_AS_BUILTS.pdf PDF
Attachment_3_-_Drawings_14-0031.pdf PDF
Attachment_2_-_Submittal_Register.pdf PDF
Attachment_6_-_Financial_Responsibility.docx DOCX document
FA4528-17-R-0003.pdf PDF
Attachment_1_-_Specification_14-0031.pdf PDF
Attachment_4_-_WD.pdf PDF
Attachment_5_-_Past_Performance_Information_Form.docx DOCX document
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES

TITLE AND LOCATION :

LED Lights Multiple High Bays

01 11 00 SD-01 Preconstruction Submittals

1.6.1Utility Outage Requests

1.6.1Utility Connection Requests

1.6.2Excavation Permits

1.6.2Welding Permits

1.8 GSalvage Plan

01 14 00 SD-01 Preconstruction Submittals

1.3.1.1 GList of Contact Personnel

1.4.1 GPersonnel List

GVehicle List

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 45 00.10 20 SD-01 Preconstruction Submittals

1.6 GQC Plan

01 57 19 SD-01 Preconstruction Submittals

1.4.1Preconstruction Survey

1.8 GSolid Waste Management Permit

1.4.2 GRegulatory Notifications

1.5 GEnvironmental Protection Plan

3.2.1.2 GStormwater Notice of Intent

1.5.9.1 GDirt and Dust Control Plan

1.4.4 GEmployee Training Records

GEnvironmental Manager

Qualifications

SD-06 Test Reports

Laboratory Analysis

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES highbay

01 57 19 3.2.1.3Inspection Reports

GSolid Waste Management Report

SD-11 Closeout Submittals

3.2.1.4 GStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 GStormwater Notice of Termination

3.4.1 GWaste Determination

Documentation

GDisposal Documentation for

Hazardous and Regulated Waste

1.8 GSolid Waste Management Permit

GSolid Waste Management Report

3.4.2.1 GHazardous Waste/Debris

Management

1.4.2 GRegulatory Notifications

GSales Documentation

Contractor Certification

As-Built Topographic Survey

01 74 19 SD-01 Preconstruction Submittals

1.5 GWaste Management Plan

SD-11 Closeout Submittals

1.6Records

01 78 00 SD-03 Product Data

1.6.1Warranty Management Plan

1.6.5Warranty Tags

3.6Final Cleaning

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES

01 78 00 1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.6.1Instructions

SD-10 Operation and Maintenance

Data

3.5 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

As-Built Record of Equipment and Materials

3.4Final Approved Shop Drawings

Construction Contract

Specifications

GCertification of EPA Designated

Items

3.7 GInterim DD FORM 1354

3.7 GChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance

Data

1.3 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES

01 78 23 3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

GDeconstruction Plan

1.10Existing Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

Receipts

26 05 19.10 10 SD-03 Product Data

2.1.1 GWire and Cable

2.1.3.1 GConductors

3.1Cable Manufacturing Data

SD-06 Test Reports

3.2 GTest Report(s), Inspection

Report(s), and Verification

Report(s)

26 09 23.00 40 SD-03 Product Data

2.1.1 GPhotoconductive Control Devices

3.1 GInstallation Drawings

GLight-Sensitive Control Devices

2.2.2 GDimming Ballast Controls

2.2.3 GLight Level Sensor

2.2.4 GDimmer Switch

2.2.5 GLighting Contactor

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES

26 09 23.00 40 2.2.6 GPhotocell Switch

2.2.7 GOccupancy Sensors

3.3 GMotion Sensors

SD-06 Test Reports

3.2System Operation Tests

SD-10 Operation and Maintenance

Data

3.3Lighting Control System, Data

Package 5

26 51 00 SD-02 Shop Drawings

1.4.1 GLuminaire Drawings

1.4.2 GOccupancy/Vacancy Sensor

Coverage Layout

SD-03 Product Data

2.2 GLuminaires

2.4 GLight Sources

2.3 GDrivers, Ballasts and Generators

1.5.1 GLED Luminaire Warranty

1.4.4 GLuminaire Design Data

2.5.3.2 GVacancy Sensors

2.5.2 GDimming Controllers (Dimmers)

2.5.4 GLighting Contactor

2.8 GPower Hook Luminaire Hangers

2.6.1 GExit Signs

2.6.2 GEmergency Lighting Unit (EBU)

2.6.3 GLED Emergency Drivers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES

26 51 00 2.6.4 GFluorescent Emergency Ballasts

2.5.3.1 GOccupancy Sensors

3.1.8 GAmbient Light Level Sensor

2.5.5 GLighting Control Panel

SD-06 Test Reports

1.4.5 GLED Luminaire - IES LM-79 Test

Report

1.4.6 GLED Light Source - IES LM-80

Test Report

1.4.7 GLED Light Source - IES TM-21

Test Report

1.4.8 GOccupancy/Vacancy Sensor

Verification Tests

1.4.11.3 GEnergy Efficiency

SD-07 Certificates

1.5.1.1 GLuminaire Useful Life Certificate

1.4.3 GLED Driver and Dimming Switch

Compatibility Certificate

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .