Attachment_3_-_Floor_Plans.pdf
PDF 472 KB Posted
- Attached to
- Carpet Installation 9 Buildings Federal contract opportunity
- Solicitation number
- FA4528-17-Q-4018
About this file
Building Floor Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_SOW.pdf | ||
| Attachment_3_-_Floor_Plans.pdf | ||
| Attachment_2_-_Carpet_Project_Sheet.xls | XLS spreadsheet | |
| Attachment_4_-_Questions_and_Answers.pdf | ||
| FA4528-17-P-4018_Amendment.pdf | ||
| Attachment_2_-_Carpet_Project_Sheet.xls | XLS spreadsheet | |
| Attachment_2_-_Carpet_Project_Sheet.xls | XLS spreadsheet | |
| Attachment_1_-_SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Carpet
F A C
IL
IT
Y
1S T
F L O O R
R em ove carpet / Insta ll carpe t tile
F A C
IL
IT
Y
N D
F L O O R
R em ove carpet / Insta ll carpe t tile
MINOT AIR FORCE BASE
NORTH DAKOTA
FOUO
This map is for reference only.
Although every effort has been made to ensure the accuracy of information, errors and conditions originating from physical sources used to develop the database may be reflected on this map.
GeoBase shall not be liable for any
Prepared By:
SrA Young Facility Utilization Manager
5CES/CEOER
5th Civil Engineer Squadron
COM: 701-723-3996
Drawing Finalized: 19 June 2017
Carpet Renovation
Building: 221_1Air Force Global Strike Command
Legend
Carpet Renovation
FOUO
This map is for reference only.
Although every effort has been made to ensure the accuracy of information, errors and conditions originating from physical sources used to develop the database may be reflected on this map.
GeoBase shall not be liable for any
Prepared By:
SrA Young Facility Utilization Manager
5CES/CEOER
5th Civil Engineer Squadron
COM: 701-723-3996
Drawing Finalized: 19 June 2017
Carpet Renovation
Building: 221_2Air Force Global Strike Command
FOUO
This map is for reference only.
Although every effort has been made to ensure the accuracy of information, errors and conditions originating from physical sources used to develop the database may be reflected on this map.
GeoBase shall not be liable for any
Prepared By:
SrA Young Facility Utilization Manager
5CES/CEOER
5th Civil Engineer Squadron
COM: 701-723-3996
Drawing Finalized: 19 June 2017
Carpet Renovation
Building: 221_3Air Force Global Strike Command
A E&L1111.: 1'/S> t\'i ~
"'lS!~
5th Civil Engineer Squo.olron l J16'-!~' i...--r-e I I
I:::::::::::::!
n~·ll ·~· I
II .l.2F ..
r,'r
11·-i~·
™"' lillb'i ~I I I
211'.,,. 11c1:~·
I I W'-11'----.
L------v I w~·
11 I •r-7*'-11 I •r-t~'-
Minot Air Force Bo.se
BLDG 505
2nol Floor
21/Mo.r/14 --C"t"'1.c. ~G\i"'i'c,; .
FOUO
This map is for reference only.
Although every effort has been made to ensure the accuracy of information, errors and conditions originating from physical sources used to develop the database may be reflected on this map.
GeoBase shall not be liable for any
Prepared By:
SrA Young Facility Utilization Manager
5CES/CEOER
5th Civil Engineer Squadron
COM: 701-723-3996
Drawing Finalized: 19 June 2017
Carpet Renovation
Building:523Air Force Global Strike Command
718 2nd floor
1038753530C Text Box X -New Flooring
1038753530C Text Box X
1038753530C Text Box X
1038753530C Text Box X
1038753530C Text Box X
1038753530C Text Box X
1038753530C Text Box X
1038753530C Text Box X
1038753530C Text Box X
1038753530C Text Box X
1038753530C Text Box X
1038753530C Text Box X
1038753530C Text Box X
| 120 Flooring project |
| 167 1st Floor |
| 167 2nd Floor |
| 221 |
| 221_1 |
| 221_2 |
| 221_3 |
| 505 Floor Plan |
| 523 |
| 718 1st floor flooring |
| 718 2nd floor flooring |
| 970 Floor Plan |
File details come from the government source that posted it. Updated .