Attachment_6 _Construction_Cost_Breakdown.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Repair/Resurface Machine Gun Backstop Federal contract opportunity
- Solicitation number
- FA4528-15-R-0015
About this file
Attachment 6 Construction Cost Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0001.pdf | ||
| Attachment_7 _Geotech_Summary.pdf | ||
| Attachment_2 _Drawings _Machine_Gun_Backstop.pdf | ||
| Attachment_1 _Specifications _Machine_Gun_Backstop.pdf | ||
| Attachment_5_Financial_Responsibility.docx | DOCX document | |
| FA4528-15-R-0015_Solicitation.pdf | ||
| Attachment_3 _WD_150015 _Heavy.pdf | ||
| Attachment_4 _Past_Performance_Information_Form.docx | DOCX document | |
| DRAFT_Specifications _Machine_Gun_Backstop.pdf | ||
| DRAFT_Drawings _Machine_Gun_Backstop.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CONSTRUCTION COST BREAKDOWN | ||
| CONTRACTOR | ADDRESS | |
| CONTRACT FOR (Work to be performed) | PROPOSED CONTRACT PRICE | |
| PURCHASE REQUEST NUMBER - ATA | PROJECT TITLE: Repair & Resurface Machine Gun Backstop | WORK LOCATION |
Minot Air Force Base
| LINE NO | ITEM | ||
| (1) | MATERIALS | LABOR COSTS | OTHER DIRECT COSTS |
| (6) | LINE TOTAL |
(7)
| TOTAL | ||
| (2) | MANHOUR MANDAYS | |
| (3) | AVERAGE RATE | |
| (4) | TOTAL |
(5)
| 1 | GENERAL CONDITIONS |
| 2 | SITEWORK AND DEMOLITION |
| 3 | OVERHEAD |
| 4 | PROFIT |
PROJECT TOTAL
File details come from the government source that posted it. Updated .