Amendment_0001.pdf

PDF 58 KB Posted

Attached to
Repair/Resurface Machine Gun Backstop Federal contract opportunity
Solicitation number
FA4528-15-R-0015
Issued by
Department of the Air Force Global Strike Command

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Repair/Resurface Machine Gun Backstop, newest first.
File Type Posted
Attachment_7 _Geotech_Summary.pdf PDF
Attachment_2 _Drawings _Machine_Gun_Backstop.pdf PDF
Attachment_1 _Specifications _Machine_Gun_Backstop.pdf PDF
Attachment_3 _WD_150015 _Heavy.pdf PDF
Attachment_4 _Past_Performance_Information_Form.docx DOCX document
Attachment_6 _Construction_Cost_Breakdown.xlsx XLSX spreadsheet
Attachment_5_Financial_Responsibility.docx DOCX document
FA4528-15-R-0015_Solicitation.pdf PDF
DRAFT_Specifications _Machine_Gun_Backstop.pdf PDF
DRAFT_Drawings _Machine_Gun_Backstop.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT II CON~TIDCODE I PAGE OF PAGES

1 J 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. , 5. PROJECTNO.(lfapplicable)

0001 27-Mar-2015

6. ISSUED BY CODE FA4528 7. ADMINISTERED BY (lfother than item6) CODE I

5CONS

See Item 6 165 MISSILE AVENUE

MINOT AFB ND 58705-5027

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, ColDlty, State and Zip Code) x 9A. AMENDMENT OF SOLICITATION NO.

FA4528-15-R-OO 15

x 9B. DATED (SEE ITEM 11) 26-Feb-2015 lOA. MOD. OF CONTRACT/ORDER NO.

lOB. DATED (SEE ITEM 13)

CODE !FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

WThe above nutrbered solicitation is am:nded as set furth in Item 14. The hour and date specified fur receipt ofOtrer 0 is extended, D is not extended.

Of!er nust acknowledge receipt ofthis arrendrr.,nt prior to the hour and date specified in the solicitation or as arrended by one ofthe full owing rrethods:

(a) By corqileting Items 8 and 15, and returning copies of the am:nd1rent; (b) By acknowledging receipt ofthis am:ndment on each copy of the of!er subrritted:

or(c) By separate letter or telegram which includ~nceto the solicitation and airendment nutrbers. FAILURE OF YOURACKNOWLEDGMENTTO BE RECEIVED AT THE PLACE DESIGN A TED FOR THE RECEIPT OF OFFERS PRJOR TO THE HOUR AND DA TE SPECIFIED MAY RESULT JN

REJECTION OF YOUR OFFER. Jtby virtue ofthis am:ndment you desire to change an of!er already submitted, such change may be made by telegram or letter, provided each telegram or letter nnkes re~rence to the solicitation and this a1rend~nt, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS'ORDERS.

IT MODIFIES THE CONTRACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM JOA.

B. THE ABOVE NUMBERED CONTRACT /ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENT AL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT: Contractor D is not, D is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter ooere feasible.)

The purpose of this arrendrrent is to add the Geotechnical Sumnary to the solicitation as Attachrrent 7.

Except as provided herein, all tenn; and conditions ofthe docwrent rererenced in Item 9A or I OA, as heretofure changed, remains unchanged and in full rorce and ef!ect.

I SA. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) .JE_:f'F W fl\CRR 15

I SB. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

TEL 1e;;j 1Z3 4C?14

!SC. DATE SIGNED I 6B. UNITED ST ATES OF AMERICA

BY ~~~ingOfficer)

30-1 OS-04

EMAIL J(Yf '1\0R~s<f) v, l\f'.: 111iL

16C. DATE SIGNED

27-l\llar-2015

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) S3.243

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICIT A TI ON/CONTRACT FORM

FA4528-15-R-0015

Page 2 of2

The required response date/time has changed from 30-Mar-2015 02:00 PM to 0l-Apr-2015 02:00 PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS

Attachment Title Date Number of Pages Attachment 1 Specifications 10 Dec 14 49 Attachment 2 Drawings 10 Dec 14 7 Attachment 3 Wage Determination 2 Jan 15 5 Attachment 4 Past Performance N/A 4

Questionnaire Attachment 5 Financial Responsibility N/A 1 Attachment 6 Construction Cost N/A 1

Breakdown Attachment 7 Geotechnical Summary July 2014 26

(End of Summary of Changes)

File details come from the government source that posted it. Updated .