Attachment_6_Detailed_Construction_Breakdown.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Repair PRIDE Parking Lot Federal contract opportunity
- Solicitation number
- FA4528-15-R-0014
About this file
Attachment 6 Construction Cost Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Contractor_Q A_-_15_May_15.docx | DOCX document | |
| SF_30_-_Add_Attachments.doc | DOC document | |
| Attachment_8_-_Contractor_Q A.docx | DOCX document | |
| Attachment_7_-_Revised_SOW_ _Drawings.pdf | ||
| Attachment_2_Drawings.pdf | ||
| 15-R-0014_Repair_Pride_Parking_Lot.doc | DOC document | |
| Attachment_3_DB_Wage_Rates_ND_150002.pdf | ||
| Attachment_5_Financial_Responsibility.docx | DOCX document | |
| Attachment_4_Past_Performance_Questionnaire.docx | DOCX document | |
| Attachment_1_Specifications.pdf | ||
| Draft01_Specifications.pdf | ||
| Draft02_Drawings.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Construction Cost Breakdown | |||||
| FA4528-15-R-0014 | |||||
| QJVF 13-0067, Repair Pride Parking Lot | Contractor Name | ||||
| Attachment 6 | Date | ||||
| Line No. | Description of Offer Item | Unit | Unit Cost | Quantity | Line Total |
| 1 | General Conditions | LS | |||
| 2 | Mobilization | LS | |||
| 3 | Traffic Control/Phasing | LS | |||
| 4 | Erosion Control | LS | |||
| 5 | Remove Trees | EA | |||
| 6 | Remove Signs | EA | |||
| 7 | Remove Asphalt Pavement | SY | |||
| 8 | Remove Base Course | SY | |||
| 9 | Remove Sidewalk | SF | |||
| 10 | Remove Curb & Gutter | LF | |||
| 11 | Miscellaneous Utility Removals | LS | |||
| 12 | Unclassified Excavation & Grading | CY | |||
| 13 | Asphalt Pavement (4" - Parking Area) | Ton | |||
| 14 | Asphalt Pavement (6" - Entrances and Drives) | Ton | |||
| 15 | 6" PCC (Concrete) Paving | SY | |||
| 16 | Aggregate Base Course (12") | Ton | |||
| 17 | 6" Vertical Curb and Gutter | LF | |||
| 18 | Special 2.5' Concrete Pan | LF | |||
| 19 | Curb Chase | LF | |||
| 20 | Sidewalk | SY | |||
| 21 | 3' Concrete Pan | LF | |||
| 22 | Valley Gutter | SY | |||
| 23 | Handicap Ramp Type 2 | EA | |||
| 24 | Handicap Ramp Type 3 | EA | |||
| 25 | Pavement Markings | LS | |||
| 26 | 15" RCP CL III | LF | |||
| 27 | 24" RCP CL III | LF | |||
| 28 | Area Inlet | EA | |||
| 29 | Curb Catch Basin | EA | |||
| 30 | Adjust Inlet Grate | EA | |||
| 31 | 15" Flared End Section | EA | |||
| 32 | 24" Flared End Section | EA | |||
| 33 | 12" Diameter Riprap | SY | |||
| 34 | Relocate Fire Hydrant | EA | |||
| 35 | 6" Water Line Relocation (Including Fittings) | LF | |||
| 36 | Lighting - Upgrade Existing Parking Lot | LS | |||
| 37 | Lighting - New Lot | LS | |||
| 38 | Construction Survey | LS | |||
| 39 | Materials Testing | LS | |||
| 40 | |||||
| 41 | |||||
| 42 | |||||
| 43 | |||||
| 44 | Overhead | LS | |||
| 45 | Profit | LS | |||
| 46 | Bonding | LS | |||
| Total |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .