Attachment 2 - Quality Assurance Surveillance Plan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF_30_Amendment_0005.pdf | ||
| Final_TA_PWS_15_July_2013.pdf | ||
| SF_30_Amendment_0004.pdf | ||
| Amendment_0003_Wage_Determination_Update.pdf | ||
| SF_30_Amendment_0002.pdf | ||
| SF_30_Amendment_0001.pdf | ||
| Attachment_3_-_Responsibility_Questionnaire.pdf | ||
| SF1449_TA_FA4528-13-R-0020.pdf | ||
| Attachment_1_-_PWS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation FA4528-13-R-0020
Attachment 2
QUALITY ASSURANCE SURVEILLANCE PLAN
FOR
Transient Aircraft Services
At
Minot AFB North Dakota
21 June 2013
Coordination and Review: See Signature Page on back
TABLE OF CONTENTS
1.0 PURPOSE………………………………………………………………….…..…. 3
2.0 MULTI-FUNCTIONAL TEAM MEMBERS & RESPONSIBILITIES..…….. 3
3.0 SERVICE SUMMARY (SS) & METHOD OF ASSESSMENT…………………4
4.0 UNACCEPTABLE PERFORMANCE REMEDIES…………………………….6
5.0 CERTIFICATION/ACCEPTANCE OF SERVICES………………………….. 6
6.0 PERFORMANCE MANAGEMENT…………….…………………………….…. 6
7.0 CONTRACTOR’S QUALITY CONTROL PLAN……………………………
8.0 KEYS……………………………………………………………………………….. 8
9.0 COMBAT TRAFFICKING IN PERSONS……………………………………….9
MULTI-FUNCTIONAL TEAM SIGNATURE PAGE
1.0 PURPOSE
1.1 This Quality Assurance Surveillance Plan (QASP) has been developed to provide an effective and systematic method to evaluate contractor provided services as required by the terms and conditions of the contract. This QASP implements the requirements of Mandatory Procedures MP5301.602-2(d) and MP5346.103 with respect to the
Government’s quality assurance requirements.
1.2 This QASP is based on the premise that the Contractor is responsible for contract management and quality control actions necessary to meet the terms of the contract, not the Government. The Government’s objective in having the service provided is to survey activities to provide sufficient assurance to justify acceptance/rejection of the Contractor’s Transient Aircraft Services. Based on quality data trends, the frequency and methods of
Government surveillance may be changed. Failure to provide quality services could result in termination of the contract and other monetary repercussions. Results that the Multi-Functional Team (MFT) is striving to achieve in managing the acquisition is to assure the Contractor obtains an acceptable level of performance, meets the stated qualifications, and are available to provide services according to Air Force needs. A contract to provide the service is the best means of achieving this objective and results.
1.3 The Contractor is encouraged to manage costs and resources effectively while meeting government expectations. The Contracting Officer Representative (COR) shall inspect by watching actual task performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in the Performance Work Statement (PWS). The COR will use the contractor’s work schedule or modified version thereof, to record surveillance results. This QASP provides the Government with an objective and recordable means for reducing the Contractor’s profits for repeated non-performance. Conversely, Contractors have an incentive to utilize their resources in a cost effective manner to increase profit.
1.4 This QASP describes the method(s) used to evaluate contractor provided services in meeting performance objectives and performance thresholds. The COR will use periodic inspection assessment methods to evaluate the
Contractor’s performance. The assessment procedures identified in this QASP, with active application of the
Contractor’s quality control procedures are intended to ensure acceptable contractor performance.
1.5 The role of Government quality assurance is to ensure contract standards are achieved. In conducting assessments, CORs are to be objective, fair, and consistent in evaluating contractor performance against the performance standards.
1.6 This QASP is a living document and shall be revised or modified by members of the MFT as circumstances warrant, throughout the life of the contract, to ensure adequate oversight of contractor performance is maintained.
1.7. The COR shall input the appropriate information into the Contracting Officer Representative Tracking (CORT)
Tool for this contract.
2.0 MULTI-FUNCTIONAL TEAM MEMBERS AND RESPONSIBILITES
(Reference AFI 63-101, Ch. 4, Para. 4.11.3)
Contracting Officer (CO)
Contract Administrator (CA)
Quality Assurance Program Coordinator (QAPC)
Contracting Officer Representative (COR)
COR Supervisor
Contractor (For partnering purposes only, the contractor has a limited role.)
2.1 Initial Contract Performance Review – The Multi-Functional Team (MFT) will meet to determine that the
Contractor has successfully started performance, completed transition, is fully operational, is within the Firm Fixed
Price (FFP) schedule, and performance parameters of the contract per AFI 63-101, Chapter 4, Section 4.9. This item may be waived by the Contracting Services Designated Official (SDO) for Contractors that have continued performance under a successor contract as the incumbent and have otherwise demonstrated full compliance with contract start-up.
3.0 Service Summary (SS): The contract service requirements are summarized in performance objectives that relate directly to the mission. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The SS and the contractor’s Quality Control Plan (QCP) provide information on contract requirements, the expected level of Contractor performance and the expected method of Government surveillance and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies.
The SS cites the key performance objectives and the associated thresholds that must be attained, over which the
Government shall exercise surveillance. The absence of any contract requirement from the SS shall not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract.
Performance Objective PWS Para Performance
Threshold
Remedy Method of
Assessment
SS-1
Perform Transient Aircraft
Management Duties
1.2, inclusive
One defect per aircraft inspection
Re-performance immediately upon notification
Periodic
Surveillance
SS-2
FOD
1.2.8, inclusive
No more than 1 error monthly
Re-performance immediately upon notification
Periodic
Surveillance
SS-3
Tool Control Program
1.2.9, inclusive
No more than 1 error monthly
Re-performance within 1 day or a mutually acceptable timeframe to the COR and Contractor
Periodic
Surveillance
SS-4
Technical Orders
1.2.12, inclusive
No more than 3 errors annually
Re-performance within 1 day or a mutually acceptable timeframe to the COR and Contractor
Periodic
Surveillance
SS-5
Perform Arrival Services
1.3, inclusive
One defect per aircraft inspection
Re-performance immediately upon notification
Periodic
Surveillance
SS-6
Perform Processing Services
1.4, inclusive
One defect per aircraft inspection
Re-performance immediately upon notification
Periodic
Surveillance
SS-7
Perform De-icing Services
1.4.11, 1.16, inclusive
One defect per aircraft inspection
Re-performance immediately upon notification
Periodic
Surveillance
SS-8
Perform Departure Services
1.5, inclusive
One defect per aircraft inspection
Re-performance immediately upon notification
Periodic
Surveillance
SS-9
Facilities Maintenance
1.12 No more than 1
error monthly
Re-performance within 1 day or a mutually acceptable timeframe to the COR and Contractor
Periodic
Surveillance
3.1 Assessment Schedule.
3.1.1 The COR will develop a Monthly Surveillance Schedule based on this QASP’s requirements. A locally devised form may be used. The schedule shall be completed no later than 7 calendar days before the beginning of the period it covers. Copies of the Surveillance Schedule shall be provided to the COR Supervisor and the CO, and uploaded into the Contracting Officer Representative Tracking (CORT) Tool before the start of the surveillance period. Surveillance Schedules, when completed, shall be marked “For Official Use Only”, and shall not be shown to the Contractor.
3.1.2 Changes to the Surveillance Schedule shall be posted promptly. Copies of the changed schedule shall be sent to the COR Supervisor and the CO and uploaded into CORT Tool. The COR shall document the reason(s) for changes of the surveillance schedule, and maintain the documentation in the COR files with the corresponding changed surveillance schedule.
3.2 Assessment of Service Delivery Summary (SS) Items.
3.2.1 It is essential for the CORs to conduct surveillances in accordance with (IAW) the projected Surveillance
Schedule for an effective Quality Assurance Program. Mission requirements may require deviations from the surveillance schedule. Surveillances should be performed as close to the schedule as is practicable. The COR shall document the surveillance as it is conducted and upload in the CORT Tool monthly.
3.2.2 The COR shall conduct surveillances of the Contractor’s performance by determining whether or not the performance meets the standards contained in the contract, the PWS, and the SS items. The COR is required to notify the CA each month regarding the acceptability of service. The CA will review Monthly Assessment Reports
(AR) initiated by the COR to ensure the COR is documenting the number of acceptable/unacceptable observations/non-performance of PWS requirements. The AR will be in the form of a letter signed by the COR.
Any Customer Complaints and/or Corrective Action Reports will be attached to the AR by the COR. If the
Contractor exceeds the performance threshold for any of the SS items in any one month period the CO may take action.
3.2.2.1 Quality Assurance. The Government shall inspect and evaluate the Contractor’s performance to ensure services are received IAW requirements set forth in this contract. The COR shall inspect by watching actual task performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in the PWS. The COR will use the
Contractor’s work schedule or modified version thereof, to record surveillance results. Results of the surveillance then become the official Air Force record of the Contractor’s performance. When a performance threshold has not been met or Contractor performance has not been accomplished, the COR will initiate and provide the CO a
Contract Discrepancy Report (CDR) for issuance to the Contractor. The Contractor shall respond to the CDR IAW instructions provided and return it to the CO within 10 calendar days of receipt.
3.3 Surveillance Methods.
3.3.1 Periodic Surveillances. This method requires the COR to employ a “spot check” style of evaluation based on the Contractor’s schedule. Periodic surveillances will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends.
Any unsatisfactory inspection (defect) result shall be recorded, and the Contractor shall re-perform the service within 2 hours after notification by the COR.
Failing to meet the performance threshold as outlined in the SS for any of these performance objectives in any one month period shall result in a warning or letter of concern from the CO.
Failing to meet the performance threshold as outlined in the SS of these performance objectives in any combination for any two, or more consecutive or non-consecutive months during a contract period shall constitute an immediate
Progress Meeting with the MFT. All remedies shall be IAW FAR 52.212-4 (a), Contract Terms and Conditions -
Commercial Items, Inspection/Acceptance.
3.3.2 Customer Complaint. The COR will receive and investigate complaints. The COR shall be responsible for initially validating Customer Complaints. The CO shall make final determination of the Customer Complaint(s) in cases of disagreement with the COR and the Contractor.
Exceeding the performance threshold for performance objective of the Performance Objectives in any one month period the CO may take action.
3.3.3 One Hundred Percent Inspection (If applicable to the Service Summary). This method requires the COR to review every occurrence. If the performance threshold is not attained for the performance objective the CO may take action.
3.4 Periodic Progress Meetings. The CO, COR Supervisor, COR, other Government personnel from the MFT, and the Contractor shall periodically, but not less than annually, meet to discuss the Contractor’s performance. The following issues shall be discussed; opportunities to improve the contract, any modifications required of the contract, unsatisfactory inspections against each performance objective observed and steps taken by the Contractor to prevent occurrences in the future. The Contractor shall provide a summation of unsatisfactory inspections and provide insight into any identified trends.
At these meetings the CO will inform the Contractor of how the Government views the Contractor’s performance and the Contractor will inform the Government of problems, if any, being experienced. The Contractor will also notify the CO, in writing, of any work being performed, if any, that the Contractor considers over and above the requirements of the contract. Appropriate action shall be taken to resolve any outstanding issues.
The minutes of these meetings will be reduced to writing, signed by the CO and any other signatures as deemed appropriate, distributed to the functional area and the Contractor. Should the Contractor not concur with the minutes, the Contractor will provide a written notification to the Contracting Office identifying areas of non-concurrence for resolution.
4.0 Remedies for Unacceptable Performance.
4.1.1 IAW the contract Inspection of Services clause, if any of the services do not conform to contract requirements;
the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. This includes but is not limited to termination of Contractor personnel and recruitment of substitute personnel that are equally qualified within established timeframes. When the defects in services cannot be corrected by re-performance, the Government may:
4.1.1.1 Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
4.1.1.2 Reduce the contract price to reflect the reduced value of the services performed. This may include a reduction in the number of paid hours to reflect the total non-performance period.
4.1.2 If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance is in conformity with contract requirements, the Government may:
4.1.2.1 By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the
Government that is directly related to the performance of such service; or
4.1.2.2 Decrease the invoice as stated in the PWS related to performance; or
4.1.2.3 Terminate the contract.
5.0 CERTIFICATION/ACCEPTANCE OF SERVICES
5.1 The Customer (COR or RA) will certify receipt of contractor services via the Wide Area Workflow (WAWF) website. Certification of services shall be accomplished on the WAWF website on the first workday following the submission of the invoice by the Contractor, to avoid payment of interest penalties.
6.0 PERFORMANCE MANAGEMENT: This section identifies the use of performance measurement information to effectively obtain a positive change in organizational culture, systems, and processes, by helping to set agreed upon performance goals and sharing results of performance in pursuing those goals.
6.1 Market Research. On-going market research is conducted to ensure the contract requirements remain current with commercial standards, practices and industry performance evaluation methods.
6.2 COR Records Review. The CA will review the CORs files periodically, but no less than semi-annually to ensure completeness and to ensure surveillance is properly conducted and documented, and contractor performance is within acceptable levels. This review will be documented and acknowledged by the CO. As a minimum, the file will contain the following:
(a) Contractor Quality Control Plan (QCP)
(b) Quality Assurance Surveillance Plan (QASP)
(c) Performance Work Statement (PWS)
(d) Request for CORs, COR Nomination Letters, COR Designation Letters, & COR Termination Letters
(e) COR training certificates, refresher certificates, & COR Supervisor Certificates for each COR {group by
COR}
(f) Correspondence between COR and Contractor & Correspondence to or from the CO/CA
(g) COR Monthly Schedules
(h) Records of Inspections, Surveillances, Schedules and the results
(i) Progress Meeting Minutes – to include other meetings
(j) Contract and all Modifications (in sequence, with most current mod on top)
(k) My Invoice & WAWF Documentation (if required)
(l) All other documentation of actions taken by COR (PARs, CARs, Safety Issues, etc.)
(m) Customer Complaints
(n) Letters of Concern from CO (when applicable)
(o) Contractor Performance Assessment and Reporting System (CPARS)
(p) Past Documentation (use a Cross Reference Form or MFR when it’s maintained in a separate binder)
6.3 Performance Feedback: The COR is advised to maintain/track a narrative summary of contractor performance throughout the contract and retain it in their files. The COR will also keep the COR Supervisor informed of all performance assessments. This information is strictly a tool to support annual Contractor ratings in CPARS and provide a snapshot view of contractor’s performance.
Performance
Element
Description
Quality of Service
Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., commonly accepted technical, professional, environments, or safety health standards).
Assess the timeliness of the contractor against the completion of the contract, task
Schedule orders, milestones, delivery schedule, administrative requirements (e.g., efforts that contribute to or effect the schedule variance).
Business Relations
Assess the integration and coordination of all activities needed to execute the contract, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history or reasonable and cooperative behavior, customer satisfaction, timely award and management of subcontracts, and whether the contractor met small/small disadvantaged and woman owned business participation goals.
Management of Key
Personnel
Assess the contractor’s performance in selecting, retaining, supporting, and replacing
(when necessary) key personnel.
6.3.1 Performance Ratings. Contractor ratings and criteria are described below:
Performance
Rating
Criteria
Exceptional
Performance meets contractual requirements and exceeds many of the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good
Performance meets contractual requirements and exceeds some of the government benefits. The contractual performance element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were highly effective.
Satisfactory
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
7.0 CONTRACTOR QUALITY CONTROL PLAN (QCP). The Contractor shall develop and maintain a QCP to ensure Transient Aircraft Services are performed in accordance with commonly accepted commercial practices and services identified in this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-performance and continual repeat of defective service does not occur. The plan shall specifically address the contractor’s strategy to provide quality workmanship, continual process improvement and for correcting deficiencies as required.
8.0 KEYS. The Contractor shall establish and implement methods of making sure all keys/combinations issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The
Contractor shall not duplicate any keys issued by the Government. The Contractor shall immediately report to the
COR or CO any occurrences of lost or duplicated keys. In the event keys, other than master keys, are lost or duplicated, the Contractor may be required, upon written direction of the CO, to re-key or replace the affected lock or locks without cost to the Government. Reimbursement shall be accomplished by deducting the cost of such from the monthly payment due the Contractor. In the event a master key is lost or duplicated, the Government shall replace all locks and keys for that system, and the total cost will be deducted from the monthly payment due the
Contractor.
9.0 COMBAT TRAFFICKING IN PERSONS. The COR will verify and monitor that the Contractor has policies and procedures in place to prohibit any activities on the part of contractor employees that support or promote trafficking in persons as part of ongoing surveillance of performance of contract services. The Contractor or the
COR shall immediately bring to the attention of the CO any non-compliance with contract clause FAR 52.222-50, Combating Trafficking in Persons. Additional information on DoD’s efforts to combat trafficking in persons can be found at the following website: http://www.dodig.mil/Inspections/IPO/combatinghuman.htm and the DFARS
Procedures, Guidance, and Information 222.17.
http://www.dodig.mil/Inspections/IPO/combatinghuman.htm
MULTI-FUNCTIONAL TEAM
SIGNATURE PAGE
Contracting Officer
Contract Administrator
Quality Assurance Program Coordinator (QAPC)
COR Supervisor
Contracting Officer Representative
File details come from the government source that posted it. Updated .