Solicitation_Amendment_FA449719RA0250002_SF_30.pdf

PDF 541 KB Posted

Attached to
Repair B262 Innovation Lab Federal contract opportunity
Solicitation number
FA449719RA025
Issued by
Department of the Air Force Air Mobility Command

About this file

Solicitation 0002 SF 30

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) were modified:

0001 - Project 1076957 -- Repair B262 Flooring (G&A Funded):

The Contractor shall provide all design, labor, materials, tools, and equipment to apply a new fluid epoxy floor coating as identified in the Statement of Work (SOW), revision 6 dated 14 June 2019.

INFORMATION FROM TO

Description Project 1076957 -- Repair B262

Flooring (G&A Funded):

The Contractor shall provide all design, labor, materials, tools, and equipment to apply a new fluid epoxy floor coating as identified in the Statement of Work (SOW), revision 5 dated 31 May 2019.

Project 1076957 -- Repair B262 Flooring (G&A Funded):

The Contractor shall provide all design, labor, materials, tools, and equipment to apply a new fluid epoxy floor coating as identified in the Statement of Work (SOW), revision 6 dated 14 June 2019.

0002 - Project 1076957 -- Repair B262 Innovation Lab and Heating, Ventilation, and Air Conditioning (HVAC) (FSRM HVAC Repair):

The Contractor shall provide all design, labor, materials, tools, and equipment to renovate the 1st floor of building 262, to include the installation of a HVAC system as identified in the Statement of Work (SOW), revision 6 dated 14 June 2019.

INFORMATION FROM TO

Description Project 1076957 -- Repair B262

Innovation Lab and Heating, Ventilation, and Air Conditioning (HVAC) (FSRM HVAC Repair):

The Contractor shall provide all design, labor, materials, tools, and equipment to renovate the 1st floor of building 262, to include the installation of a HVAC system as identified in the Statement of Work (SOW), revision 5 dated 31 May 2019.

Project 1076957 -- Repair B262 Innovation Lab and Heating, Ventilation, and Air Conditioning (HVAC) (FSRM HVAC Repair):

The Contractor shall provide all design, labor, materials, tools, and equipment to renovate the 1st floor of building 262, to include the installation of a HVAC system as identified in the Statement of Work (SOW), revision 6 dated 14 June 2019.

Section C - Specification/SOW/SOO/ORD

The Requirements text has been modified to:

AFIMSC 436MSG CES FSRM-FY19-18NB-1076957 Repair B262 Innovation Lab and HVAC

FA449719RA0250002

The Contractor shall provide all design, labor, materials, tools, and equipment to renovate the 1st floor of building 262 (B262) as necessary to comply with specified design standards and with the Statement of Work, revision 6 dated 14 June 2019. The work shall consist of, but is not limited to, architectural/structural, plumbing, electrical, and heating, ventilation, and air conditioning (HVAC) modifications. Alterations to the fire protection and communication systems are not anticipated.

Section I - Contract Clauses

Additional Information/Notes

The following clauses were modified:

252.236-7001 - Contract Drawings and Specifications. Aug 2000 hereby reads as follows:

As prescribed in 236.570(a), use the following clause: CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000) (a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer. (b) The Contractor shall (1) Check all drawings furnished immediately upon receipt; (2) Compare all drawings and verify the figures before laying out the work; (3) Promptly notify the Contracting Officer of any discrepancies; (4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and (5) Reproduce and print contract drawings and specifications as needed.

(c) In general-- (1) Large-scale drawings shall govern small-scale drawings; and (2) The Contractor shall follow figures marked on drawings in preference to scale measurements. (d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications. (e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings: | Title || __Repair B262 Innovation Lab__ || File || __Project 1076957__ || Drawing No. || __Statement of Work, revision 6 dated 14 June 2019__ | (End of clause)

Section J - List of Attachments

The following attachments were added:

Statement of Work, Revision 6

The following attachments were deleted:

Statement of Work, Revision 5

FA449719RA0250002

IDCode:
Page: 1
Pages: 3
AmendNo: 0002
EffDate: 6/18/2019
ReqNo: F1Q3FQ9074A002
ProjNo: 1076957
IssCode: FA4497
AdmCode:
IssuedBy: FA4497 436 CONS PKA

639 ATLANTIC ST BLDG 639

DOVER AFB, DE 19902-5639

United States Dustin Herridge, Email: dustin.herridge@us.af.mil Telephone: 3026775210

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA449719RA025
SolDate: 5/3/2019
AwardChg:
AwardNo:
AwardDate:
Amended: 1
OffrExt:
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd:
ChgeOrder:
Modify:
SuppAgre:
SuppAuth:
ModOthr:
OthrSpec:
NoReq: 1
Require:
Copies:
Descript: The purpose of this amendment is to incorporate revision 6 of the Statement of Work, dated 14 June 2019.
ContNameTitle:
CoNameTitle: John Orban

Email: john.orban.1@us.af.mil Telephone: 3026773577

ContDate:
CODate:

File details come from the government source that posted it.