2._Project_Drawings.pdf
PDF 5 MB Posted
- Attached to
- Demo T-717 and Construct T-715 Parking Lot Federal contract opportunity
- Solicitation number
- FA448619RA006
About this file
2. Project Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tab_1_-_Statement_of_Work_Rev_1(SOW).pdf | ||
| Questions_&_Answers.pdf | ||
| Solicitation_-_FA448619RA006.pdf | ||
| Exhibit_B_Past_Performance_Questionnaire_PPQ.pdf | ||
| 1._Statement_of_Work_(SOW),_Jan_2019.pdf | ||
| 3._Submittal_Register.pdf | ||
| Exhibit_A_Performance_relevancy_Questionnaire_PRQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Air Forces in Europe
LAJES FIELD, AZORES, PORTUGAL
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Projecto
Drawing #
N° Desenho
Date / Data
Scale / Escala
Designed by / Projectista
Facility #
N°Edificio
Drawn by / Desenhou
Location Map and List of Drawings
Project Locations
J. Silva
N/A
J. Silva
Demolish T-717 and Construct T-715 Parking Lot (EFFICIENCY)
MQNA 13-1020A T-715
Jan 2019
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Projecto
Drawing #
N° Desenho
Date / Data
Designed by / Projectista
Facility #
N°Edificio
Drawn by / Desenhou
Site Plan and Working Area
N/A
Scale / Escala
J. Silva
N/A
J. Silva
N
Asphalted area to be demolished
WORKING AREA
Demolish T-717 and Construct T-715 Parking Lot (EFFICIENCY)
MQNA 13-1020A
Concreted area to be demolished
ECP walls to be demolished
T-715
Jan 2019
Notes:
Detailed Demo Areas on Drawing 03
Demo Building T-717
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Projecto
Drawing #
N° Desenho
Date / Data
Designed by / Projectista
Facility #
N°Edificio
Drawn by / Desenhou
Demolition Plan
N/A
Scale / Escala
J. Silva
N/A
J. Silva
N
Demolish T-717 and Construct T-715 Parking Lot (EFFICIENCY)
MQNA 13-1020A
LEGEND FOR DEMOLITION
Concrete
Asphalt
Rock Walls
Building, Fire Hydrant, Dumpsture Enclosure
Dumpster Enclosure to be relocated
ECP to be relocated
Fire hydrant to be removed
Fire hydrant to be relocated
Fire hydrant new location
T-715
Jan 2019 Remove 2 Existing Trees
Building T-717
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Projecto
Drawing #
N° Desenho
Date / Data
Designed by / Projectista
Facility #
N°Edificio
Drawn by / Desenhou
Parking Plan
N/A
Scale / Escala
J. Silva
N/A
J. Silva
N
Demolish T-717 and Construct T-715 Parking Lot (EFFICIENCY)
MQNA 13-1020A
New dumpster location
New fire hydrant location
New wall with fence
New wall with fence
(New FOE Crates)
T-715
Jan 2019
Notes:
1 - Perform all pavement markings as displayed, with thermoplastic paint;
2 - GOV Parking Lot and ECP shall be performed in asphalt, 6 inch thick finish;
3 - POV Parking Lot shall be performed in asphalt, 6 inch thick finish;
4 - Contractor shall add/remove all necessary quantities of base material in order to achieve pavement topography pending towards drains.
Crash Arm
New curb on both sides Ficus Variagata
Ficus Variagata
Ficus Variagata
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Projecto
Drawing #
N° Desenho
Date / Data
Designed by / Projectista
Facility #
N°Edificio
Drawn by / Desenhou
POV's Stall Dimensions
N/A
Scale / Escala
J. Silva
N/A
J. Silva
Demolish T-717 and Construct T-715 Parking Lot (EFFICIENCY)
MQNA 13-1020A
POV's PARKING LOT (76 Stalls)
T -7
Light Pole (single head)
Light Pole (double head)
T-715
Jan 2019
Notes:
1 - Lamps shall be 4000K, LED, "M4 classified roads" Voltana 3, or equivalent.
2 - Aluminum conical pole, length above ground of 6.0 meters, base diameter 120mm, top diameter 76/60mm, with welded aluminum base plate (270mmx270mm, holes at 200x200mm), with double bracket lenght 700mm, surface brush finish, powdercoated in RAL 7038.
3 - Poles shall be Voltana 3 or equivalent.
4 - Contractor shall provide an photocell activating system.
5 - Power supply shall be provided from the T-715 building's Mechanical Room. All materials including, piping, wiring and electrical panel board, among others, shall be provided and assembled. Wiring and piping shall be assembled appropriately over the ceiling tiles (inside T-715), embedded in the concrete walls (facade of T-715) and in trench (outside T-715). Contractor shall re-establish all T-715 conditions as initially existing.
New 1 X 4'' concrete encase PVC, Schedule 40, Power Conduits, approximate total 1910 meters.
NEW CONCRETE SIDEWALK & CURBING
Junction Box (Wall Encased)
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Projecto
Drawing #
N° Desenho
Date / Data
Designed by / Projectista
Facility #
N°Edificio
Drawn by / Desenhou
GOV's Stall Dimensions
N/A
Scale / Escala
J. Silva
N/A
J. Silva
Demolish T-717 and Construct T-715 Parking Lot (EFFICIENCY)
MQNA 13-1020AGOV's PARKING LOT (64 Stalls) Light Pole (single head)
Light Pole (double head) T-715
Jan 2019
Notes:
1 - Lamps shall be 4000K, LED, "M4 classified roads" Voltana 3, or equivalent.
2 - Aluminum conical pole, length above ground of 6.0 meters, base diameter 120mm, top diameter 76/60mm, with welded aluminum base plate (270mmx270mm, holes at 200x200mm), with double bracket lenght 700mm, surface brush finish, powdercoated in RAL 7038.
3 - Poles shall be Voltana 3 or equivalent.
4 - Contractor shall provide an photocell activating system.
5 - Power supply shall be provided from the T-715 building's Mechanical Room. All materials including, piping, wiring and electrical panel board, among others, shall be provided and assembled. Wiring and piping shall be assembled appropriately over the ceiling tiles (inside T-715), embedded in the concrete walls (facade of T-715) and in trench (outside T-715). Contractor shall re-establish all T-715 conditions as initially existing.
New 1 X 4'' concrete encase PVC, Schedule 40, Power Conduits, approximate total of 1910 meters.
Safety Bollards
Safety Bollards
NEW CONCRETE SIDEWALK & CURBING
Junction Box (Wall Encased)
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Projecto
Drawing #
N° Desenho
Date / Data
Designed by / Projectista
Facility #
N°Edificio
Drawn by / Desenhou
Drainage Plan
N/A
Scale / Escala
J. Silva
N/A
J. Silva
Demolish T-717 and Construct T-715 Parking Lot (EFFICIENCY)
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Projecto
Drawing #
N° Desenho
Date / Data
Designed by / Projectista
Facility #
N°Edificio
Drawn by / Desenhou
Rock Walls and Traffic Signs
N/A
Scale / Escala
J. Silva
N/A
J. Silva
Demolish T-717 and Construct T-715 Parking Lot (EFFICIENCY)
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Projecto
Drawing #
N° Desenho
Date / Data
Designed by / Projectista
Facility #
N°Edificio
Drawn by / Desenhou
Project Details
N/A
Scale / Escala
J. Silva
N/A
J. Silva
Demolish T-717 and Construct T-715 Parking Lot (EFFICIENCY)
MQNA 13-1020A T-715
Jan 2019
Notes:
1 - Sidewalks, ramps, bollards, dumpster screens and landscaping shall comply to LFFES;
2 - ECP entry shall be equipped with an Anti-Ram crash arm, provided by a DoD certified manufacturer rated for a PU-50 Criteria with a P-2 Penetration Rating (ASTM 2656-07) 3 - Crash Arm shall open vertically, electrically operated, as per recommendation of manufacturer, and equipped with keypad.
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Projecto
Drawing #
N° Desenho
Date / Data
Designed by / Projectista
Facility #
N°Edificio
Drawn by / Desenhou
Existing Conditions
N/A
Scale / Escala
J. Silva
N/A
J. Silva
Demolish T-717 and Construct T-715 Parking Lot (EFFICIENCY)
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
File details come from the government source that posted it.