Attachment_1_-_Performance_Work_Statement_-_25_Jan_2019.pdf

PDF 64 KB Posted

Attached to
UPS Maintenance Federal contract opportunity
Solicitation number
FA448619Q0001
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Attachment 1 - PWS, 25 Jan 2019

View the file

Other files for this federal contract opportunity

Other files attached to UPS Maintenance, newest first.
File Type Posted
Questions_and_Answers_12_Feb_2019.pdf PDF
PWS,_REVISION_1,_11_Feb_2019.pdf PDF
Amendment_1,_12_Feb_2019.pdf PDF
Attachment_2_-_Price_Schedule.pdf PDF
RFQ_FA448619Q0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE

WORK

STATEMENT

FOR

UPS Maintenance Lajes Field, Azores, Portugal

25 January 2019

TABLE OF CONTENTS

SECTION TITLE PAGE

1. DESCRIPTION OF SERVICES 3

1.1. INITIAL PHASE 3

1.2. PREVENTIVE MAINTENANCE SERVICE 3

1.3. EMERGENCY SERVICE CALL 4

1.4. REPLACEMENT OF PARTS 4

1.5. REPORTS 4

2. GENERAL INFORMATION 4

2.1. QUALITY INSPECTION 4

2.2. CORRECTIVE ACTIONS 4

2.3. GOVERNMENT REMEDIES 5

2.4. HOURS OF OPERATION 5

2.5. SAFETY REQUIREMENTS 5

2.6. PERFORMANCE OF SERVICES DURING CRISIS 5

2.7. UTILITIES 5

3. APPENDIXES

1. DESCRIPTION OF SERVICES: The Contractor shall inspect and repair, if needed, during initial phase, to bring all Uninterruptable Power Supply (UPS) listed in Appendix C in manufacture operating conditions. After the initial phase, the contract shall provide preventive and remedial maintenance services on all UPS units listed in Appendix C. The equipment and associated batteries shall be kept in manufacturing operating condition and shall be maintained in accordance with the Original Equipment Manufacturers (OEM) maintenance specifications and schedules.

1.1. INITIAL PHASE: During the initial phase, the contractor shall provide supplies, repair parts, and services necessary to bring all UPS within manufacturers operating specifications.

1.1.1. The contractor shall provide a detailed report describing the current condition of all UPS system and provide the recommendations regarding repair or replacement of faulty batteries no later than 30 days after contract award.

1.1.2. Any repair during the initial phase shall not be performed without prior approval of the

Contracting Officer. Only new standard parts and parts of equal quality shall be used in repairs.

1.2. PREVENTIVE MAINTENANCE SERVICE: The contractor shall perform periodic routine inspection and testing of all UPS every three (3) months.

1.2.1. At the beginning of the base year and of each option year, the contractor shall provide a schedule for the upcoming maintenance, by building, so that the Government can plan accordingly to the following organizational email address: 65CS.SCXDMS@us.af.mil.

1.2.2. The contractor shall perform preventive maintenance during each periodical inspection to ensure reliable and continuous safe operation. The maintenance work shall be in accordance with commercial practices or manufacturer’s specifications, if available, and shall be intended to maintain the UPS in safe and reliable operating condition until the next scheduled maintenance.

1.2.3. If at any time, during the term of the contract, the prime contractor changes or acquires a subcontractor different than the one(s) submitted in their original quote, the Government shall be informed immediately and provided with the adequate certifications of that subcontractor.

1.2.4. Details of Preventive Service: The contractor shall perform, but is not limited to, the following for the preventive service:

• Cleaning UPS System

• Calibration Verification

• Battery inspection, charge and discharge

• Bypass verifications

• Cleaning and inspection of the battery terminals

• Mechanical adjustments and inspection

• Ventilators status verifications

• Rectifier bridge status

• Wave form status

• Circuit Breakers conditions

• Verification of calibrations for the readings:

o o Voltage o o Current o o Input Frequency o o Output Frequency o o Batteries

• Parameters registration

• UPS Control Test Function, Local or remote readings

• Simulate power failure

1.3. EMERGENCY SERVICE CALL: The contractor shall report to the work location within two (2) hours of emergency call, and commence work to repair UPS for reliable and continuous safe operation. Downtime to the users in the effected building will be kept to an absolute minimum.

The contractor must notify the Government personnel issuing the service call of all projected downtime, estimated time for repair, and completed time.

1.4. REPLACEMENT OF PARTS: The cost of consumable materials normally used during preventive maintenance, to include but not limited to air filters, link grease, distilled water, etc. shall be included in the preventive maintenance unit price. Only new standard parts and parts of equal quality to or better than shall be used in repairs. The contractor’s liability for replacement parts shall be limited to not more than 300.00€ for each item. A Government representative shall examine the parts to determine if the items can be repaired instead of replaced. If it is determined that the item can be repaired, the contractor shall make the appropriate repairs, at no cost to the Government. For any new parts required costing over 300.00€, the Government will be liable and bear the expenses. In this case, the contractor must provide the Government with a quote for the item required; no parts shall be purchased by the contractor until the Government has approved.

1.5. REPORTS: The contractor shall prepare and submit an inspection/maintenance report to the Point of Contact/Liaison (POC) assigned to this requirement within two (2) business days after completion of each job. The report shall include:

a. Date of scheduled maintenance

b. Date and time of arrival

c. Hours performing maintenance,

d. The name of the technician performing the inspection and maintenance

e. Listing of parts replaced or repaired.

f. Document battery system condition and further service needs.

g. Recommendations regarding replacement of faulty batteries or battery capacity under 60%

2. GENERAL INFORMATION

2.1. QUALITY INSPECTION: The contractor shall accomplish all inspection and testing needed to ensure that services conform to the requirements stated in this PWS and contract.

2.2. CORRECTIVE ACTIONS: The government has the right to inspect and test all services called for by contract, to the extent practicable at all places and times during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

2.3. GOVERNMENT CORRECTIVE ACTIONS: If unacceptable performance was identified in services, the POC shall promptly notify the contractor of the deficiencies for correction. The contractor shall take corrective action in a timely manner at no increase in the contract price, and submit the probable cause, corrective action taken, and preventive action of the deficiencies to the personnel upon completion of correction. If deficiencies are not corrected in a timely manner or repeated, the POC should notify the Contracting Officer (CO).

2.4. HOURS OF OPERATION

2.4.1. Normal Hours of Operation: The contractor will be allowed to work from 0800 to 1700 Monday through Friday, except for U.S. legal holidays.

2.4.2. Emergency or Special Event Services: The contractor shall provide emergency service during and after regular working hours, seven (7) days a week, including holidays. The contractor shall furnish to the CO, telephone numbers and names of qualified maintenance personnel and company officials who can be contacted to respond to an emergency after regular working hours.

2.5. SAFETY REQUIREMENTS

2.5.1. The contractor shall maintain work environments, which safeguard the public and government personnel exposed to contractors operations and activities, by providing safe barricades and signs.

2.5.2. The contractor shall be liable for any damage caused to Government property by them of any of their subcontractors. At the end of each work period, all government facilities, equipment and materials shall be secured.

2.5.3. Security Requirements: Contractor service personnel must comply with the base security requirements. Some of the UPS units to be maintained under this contract are located in areas that require escort to access.

2.5.4. Ensure that personnel comply with AFI 32-1064, Electrical Safe Practices, Air Force Occupational Safety and Health Standard (AFOSHSTD) 91-501, Air Force Consolidated Occupational Safety Standard, and UFC 3-560-01, Electrical Safety O&M.

2.6. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE

NATIONAL COMMAND AUTHORITY OR OVERSEAS COMBATANT COMMANDER:

During crisis declared, the contractor is not required to perform periodical routine maintenance.

Those tasks was not accomplished will be performed as soon as crisis is terminated. However, the contractor is required to accomplish emergency repair service within a reasonable time frame for the situation related to the crisis.

2.7. UTILITIES: The Government will provide utilities as required by the contractor.

APPENDIX A

DEFINITIONS

1.1. GENERAL DEFINITIONS:

1.1.1. Defective Service: A service output that does not meet the standard of performance specified in the contract for that service.

1.1.2. Quality Assurance: A planned and systematic pattern of all actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. For purposes of this manual, quality assurance refers to actions by the government.

1.1.3. QA Personnel: A functionally qualified person who performs quality assurance functions for contracted services.

1.1.4. Quality Control: Those actions taken by a contractor to control the production of outputs to ensure that they conform to the contract requirements.

1.2 TECHNICAL DEFINITIONS

1.2.1. Serviceable Condition: Refers to the functional operating characteristics of a particular UPS system wherein it performs its intended purpose in a manner equal or superior to the manufacturer’s standard of performance on the date of its manufacture.

1.2.2.1. Preventive Maintenance of UPS is the routine recurring inspection and work required to keep it in such condition that it may be utilized at the original capacity and efficiency, for its intended purpose. Parts and equipment specified by the UPS manufacturer or items of equal or better quality shall be used in accordance with the manufacturer’s specifications or commercial practices.

1.2.2.2. Repair is the restoration of equipment to a condition substantially equivalent to its original or designed capacity and efficiency by replacement, overhaul, or reprocessing of constituent parts or material. Parts and equipment specified by the UPS manufacturer or items of equal or better quality shall be used in accordance with the manufacturer’s specifications or commercial practices.

1.2.2.3. Inspection is the testing for proper operation of each UPS. If the test reveals a defect that makes operation of the UPS dangerous, the UPS shall be taken out of service immediately.

1.2.3.2. Emergency Service: Repair of any unsafe or inoperable conditions of all elevators for continuous and safe operations requested by the service call, 24 hours and 7 days a week.

APPENDIX B

LIST OF APPLICABLE PUBLICATIONS AND FORMS

Government applicable documents and standards: The following documents are hereby incorporated by reference. The contractor shall comply with these documents during the performance of this Task Order

NFPA 70B, Recommended Practice for Electrical Equipment Maintenance, http://www.nfpa.org/

NFPA 70E, Standard for Electrical Safety in the Workplace, http://www.nfpa.org/

UFC 3-520-01, Interior Electrical Systems, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4

UFC 3-560-01, Electrical Safety O&M, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4

UFC 3-600-02, O&M: Inspection, Testing, and Maintenance of Fire Protection Systems, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4

RUS Bulletin 1751F-801, Electrical Protection Fundamentals

RUS Bulletin 1751F-805, Electrical Protection at Customer Locations

Conditioning and Continuation Interfacing Equipment (PCCIE). PCCIE is classified as equipment.

For guidance on acquisition and maintenance of this equipment, contact the PCCIE Product Group Manager, 500 CBSS/GBLD, Building 1207-N, 6029 Wardleigh Road, Hill AFB, UT 84056-5838.

DISA Circular 350-195-2, Auxiliary Electric Power

Systems ETL 04-15, Electrical Safety Guidance

IEEE C2, National Electrical Safety Code (NESC), http://www.ieee.org/

The contractor shall obtain and comply with any other applicable manuals not identified above that would be required to meet industry standards.

http://www.nfpa.org/ http://www.nfpa.org/ http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 http://www.ieee.org/

APPENDIX C

EQUIPMENT TO BE MAINTAINED

The following UPS equipment and associated batteries shall be covered by the maintenance contract.

TABLE 1 - 65 Communication Squadron Buildings - Operations

Building Number

Equipment Supported Manufacturer Model Quantity Power (kVA)

T-100 INFORMATION

TRANSFER NODE

APC Smart

UPS RT

1 6

T-205 TELEPHONE

SWITCH

BENNING MCU

1 25

T-205 INFORMATION

1 6

T-570 INFORMATION

1 6

T-714 NETWORK

CONTROL

RIELLO UPS MP

1 160

T-810 ITN/DISA MPLS EATON 9355 1 40

T-817 MARK IVB EATON 9155-8 1 8

TABLE 2 - 65 Communication Squadron Buildings – HFGCS (High Frequency Global Communication System)

Equipment Supported Manufacturer Model Quantity Power (kVA)

T-714 GLOBAL CONTROL EATON 9155-8 1 8

T-1112 GLOBAL TRANSMIT

SITE

EATON 9155-8 1 8

T-1015 GLOBAL RECEIVE

SITE

EATON 9330-40 3 40

TABLE 3 - 65 Operational Support Squadron Buildings

Equipment Supported Manufacturer Model Quantity Power (kVA)

T-923 TERMINAL (TRM)

TACAN

EATON 9335-30 1 30

T-248 GATR – GROUND

AIR TRANSMIT

EATON 9335-30 1 30

T-1250 DASR EATON 9390-80 1 80

T-134 CONTROL TOWER RIELLO ND 2 NA

TABLE 4 - 65 Civil Engineering Squadron Buildings

Equipment Supported Manufacturer Model Quantity Power (kVA)

T-624 SWITCH GEAR GNB ABSOLYTE

IIP 90A-11 1 1.08

T-624 SWITCH GEAR GNB ABSOLYTE

IIP 90A-11 1 1.08

TABLE OF CONTENTS
2. GENERAL INFORMATION
2.4. HOURS OF OPERATION
2.5. SAFETY REQUIREMENTS
APPENDIX A DEFINITIONS
1.2 TECHNICAL DEFINITIONS
APPENDIX B
APPENDIX C EQUIPMENT TO BE MAINTAINED