Attch 2 - Quality Assurance Surveillance Plan 1.doc

DOC document 138 KB Posted

Attached to
JBMDL Base Telecommunications Systems Services Federal contract opportunity
Solicitation number
FA448421R0004
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to JBMDL Base Telecommunications Systems Services, newest first.
File Type Posted
Attch 12 - DBA NJ20200001 Burlington - Ocean County NJ.pdf PDF
Questions and Answers BTS FA448421R0004.pdf PDF
Solicitation Amendment FA448421R00040001 SF 30.pdf PDF
Attch 5 - Labor Worksheet 1.xlsx XLSX spreadsheet
Attch 3 - Past Performance Questionnaire.docx DOCX document
Attch 4 - List of Provisions.docx DOCX document
Attch 5 - Labor Worksheet.xlsx XLSX spreadsheet
Attch 6 - Fillable Pricing Table.xls XLS spreadsheet
Attch 8 - Anti-Terrorism Guide.pdf PDF
Attch 1 - Performance Work Statement 26 Jun 20.docx DOCX document
Attch 7 - Security Forces Appendix.pdf PDF
Solicitation - FA448421R0004.pdf PDF
Attch 10 - WD Burlington County 2015-4191 Rev 12 dated 21 April 2020.pdf PDF
Attch 11 - WD Ocean County 2015-4195 Rev 12 dated 21 April 2020.pdf PDF
Attch 2 - Quality Assurance Surveillance Plan.doc DOC document
Attch 9 - EIPS.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

FOR

BASE TELECOMMUNICATION SERVICE

AT

JOINT BASE MCGUIRE-DIX-LAKEHURST

Joint Base McGuire-Dix-Lakehurst

26 June 2020 Quality Assurance Surveillance Plan (QASP)

1. Purpose

This Quality Assurance Surveillance Plan is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:

· What will be monitored

· How monitoring will take place

· Who will conduct the monitoring

· How monitoring efforts and results will be documented

The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government’s surveillance of the contractor’s performance to assure that it meets contract standards. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.

The QASP is not part of the contract nor is it intended to duplicate the contractor’s quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.

This QASP is based on the premise that the government requires a quality standard in the base telecommunication service. This QASP is the best means of achieving that objective.

The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.

Bottom line, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.

2. Authority

Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provides for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.

3. Roles and Responsibilities

The following personnel shall oversee and coordinate surveillance activities.

Government Personnel

Contracting Officer (CO)

The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.

Assigned CO: James Kelly

Organization or Agency: 87th Contracting Squadron Telephone: (609) 754-2976 Email: james.kelly.13@us.af.mil Contracting Officer’s Representative (COR)

The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR will use the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the CO. The COR is required to provide an annual performance assessment to the CO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.

Assigned COR: Adam McGeer

Organization or Agency: 87th Communications Squadron Telephone: (609) 754-5454 Email: adam.mcgeer@us.af.mil Contracting Officer’s Representatives Supervisor

Nominates Contracting Officer’s Representatives (CORs) in writing and sends nomination and COR nominee qualification documentation to the CO, ensures the COR is trained before performing any COR duties and supports the COR’s performance assessment activities, reviews COR documentation on a regular basis, evaluates performance of COR duties as part of performance assessment throughout the period of the contract.

COR Supervisor: Leroy Grice

Organization or Agency: 87th Communications Squadron Telephone: (609) 754-4815 Email: leroy.grice@us.af.mil Contractor Representatives The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract.

Program Manager:

Telephone:

Email:

4. Performance Requirements and Method of Surveillance

4.1 Contract Surveillance

The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR’s contribution is their professional, non-adversarial relationships with the contracting officer, contracting specialist and the contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor’s performance. Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.

4.2 Surveillance Matrix (Services Summary)

The Surveillance Matrix (Attachment 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.

Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The Performance Requirement Summary (PRS) should be used to form the foundation of the COR’s inspection checklist.

4.3 Performance Rating Definitions

In evaluating the quality of contractor’s performance, the following performance ratings may be used.

Performance

Rating Criteria

Excellent / Outstanding
Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.
Very Good
Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.
Good
Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Performance Reporting

Remedies for Non-Conformance

If inspections indicate unacceptable performance, the COR will notify the contractor’s POC of the deficiencies for correction. Use the remedy the government is going to use per what is stated in the Services Summary (SS). If deficiencies are not corrected within the required time frame, the COR should notify the CO for action. If the contractor disagrees with the noted discrepancy and an agreement cannot be reached, the CO shall be notified for a final decision

Performance Assessment Report (PAR)

PARs will be used to report ALL minor discrepancies and will be generated by the COR and sent to the contractor for corrective action. Contractors will be given 10 days to correct PARs unless they have requested an extension. If 3 minor discrepancies are found, combine them and process a CAR.

Customer Complaint Form

The COR must furnish instructions to the customer receiving the contractor’s service. The customer must retain supporting evidence of complaint or feedback. After the COR validates feedback or complaint demonstrating contractor noncompliance, the COR processes a Performance Assessment Report (PAR) or Corrective Action Report (CAR) to the CO. ALL Customer Complaint forms WILL be validated by the COR prior to notifying the contractor.

Corrective Action Report (CAR)

The CAR will be forwarded to the Chief COR for review. The COR will forward the CAR to the CO for action. A copy will be provided to the contractor’s representative by the CO. Most CARs will be corrected within 30 calendar days depending on the complexity of the finding, the contractor may be allowed up to six months (maximum) correcting a CAR. The contractor will be asked the status of the CAR on a monthly basis. The COR will keep an electronic log of all CARs and will keep a hard copy of CARs in the contract oversight file.

Contract Performance Assessment Reporting System (CPARS)

CPARS will be initiated annually, documenting contractor performance for this specific contract. More frequent updates may be made as required to document a significant improvement or degradation of the level of contract performance. (CPARS are required for Services. The threshold is over $1M aggregate (total) per task order or contract. Put N/A if you requirement does not meet this threshold).

Disputes

Every attempt will be made to resolve all disputes arising under this contact/plan using the Alternate Dispute Resolution (ADR) as outlined in FAR 33.214. If no resolution can be made under ADR, the CO will render a Contracting Officer’s final decision.

Attachments:

1. APPENDIX 1 – SURVEILLANCE MATRIX (SERVICE SUMMARY)

2. CORRECTIVE ACTION REPORT (CAR)

3. CUSTOMER COMPLAINT RECORD

4. PERFORMANCE ASSESSMENT REPORT (PAR)

Appendix 1 – Surveillance Matrix (Service Summary)

SDS #
Performance Requirement
PWS Paragraph
Performance Standard
Method of Assessment
1
Provide sufficient and qualified personnel to perform the requirements
1.2.5
No more than one instance of insufficient or unqualified personnel.
Periodic surveillance/records review
2
Operate and maintain minimum switching system(s)
1.3.1
A period of five minutes downtime shall not be exceeded.
Periodic surveillance/records review
3
Perform PMI Switch Power Tests
1.3.3.1
No more than one instance of failure to test IAW OEM specifications or document results.
Periodic surveillance/records review
4
Perform PMI tests of spare conductors
1.3.3.2
No more than one instance of failure to test & document IAW PWS each quarter.
Periodic surveillance/records review
5
Perform PMI of Manholes and Handholes, Perform PMI of poles and aerial cable
1.3.3.3
No more than one instance of failure to perform PMIs IAW PWS.
Periodic surveillance/records review
6
Perform PMI of Terminals
1.3.3.4
No more than one instance of failure to perform PMIs IAW PWS.
Periodic surveillance/records review
7
Perform PMI of Distribution Pedestal Terminals
1.3.3.5
No more than one instance of failure to perform PMIs IAW PWS.
Periodic surveillance/records review
8
Respond to and restore all system and service outages and trouble calls/tickets within the required time constraints specified in the PWS
1.3.4
Emergency – Zero instances exceeding response/restoration times.

Priority – One instance exceeding response/restoration times.

Routine – One instance exceeding response/restoration times.

100% Inspection for all Emergency;

Random sampling for Non-emergency, records review

9
Provide location, staking, and marking services
1.3.6
Emergency – Zero instances exceeding completion time.

Routine – One instance exceeding completion time.

100% Inspection for all Emergency;

Periodic Records Review for Non-emergency

10
Provide Contractor support services IAW the PWS
1.3.12
No more than one instance of failure to provide support/interface.

No more than one unexcused meeting absence Periodic surveillance/records review

11
Technical Solutions IAW PWS
1.3.13
No more than one instance of failure to provide an implementable technical solution within specified time frame.

100% Inspection

12
Update work center records
1.3.14
No more than two instances exceeding timeframe specified within PWS.

No more than one work-center records update error.

100% Inspection

13
Comply with established procedures for completion of work orders & MACs
1.4.1
Emergency – Zero instances exceeding PWS timeframes.

Priority – Zero instances exceeding PWS timeframes.

Routine – No more than two instances exceeding PWS time frame.

Random Sampling, review of records. Periodic surveillance, and customer complaint

14
Comply with established procedures for completion of Special Projects
1.4.6
No more than one instance of exceeding negotiated timeframes.
Random Sampling
15
Perform Utility Pole MX , Aerial cable inspections, Aerial cable services
1.3.3.7, 1.3.10
No more than one instance of failure to perform PMIs or services IAW PWS.
Periodic surveillance/records review
16
CFD Collections
1.3.7
No more than two instance of failure to correct errors or update records within the specified timeframe per month.
Periodic surveillance/records review

Inspection Metrologies:

M1: Periodic. Periodic surveillance/inspection is the type of surveillance that is based upon selecting samples for evaluation on other than 100% inspection or on a statistically random basis. Periodic surveillance can be accomplished, weekly, monthly or quarterly using a checklist method.

(100% performance standard should be reserved for certifications requirement, medical items, Public Health inspections, EPA, safety, health standards, etc. The standards should be compared to what is performed within the industry.)

M2: Inspection of Reports. All reports shall be reviewed upon receipt. The reviewer will report any flaws in the document and categorize the flaws (Editorial, Format, and/or Substance).

M3: Technical Inspection: Surveillance/inspection is the type of surveillance that will be performed as specified on the project schedule by actually looking at the work being done.

CORRECTIVE ACTION REPORT (CAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. DEFICIENCY FORMCHECKBOX

MAJOR FORMCHECKBOX

MINOR

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.

8. QUALITY ASSURANCE PERSONNEL (COR)

TYPED NAME AND GRADE

SIGNATURE AND DATE

9. ISSUING AUTHORITY

TYPED NAME AND GRADE

SIGNATURE AND DATE

10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE

11. COR DETERMINATION

FORMCHECKBOX

ACCEPTED FORMCHECKBOX

REJECTED

12. CLOSE DATE

CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT

SOURCE OF COMPLAINT

ORGANIZATION

BUILDING NUMBER

INDIVIDUAL

PHONE NUMBER

NATURE OF COMPLAINT

CONTRACT REFERENCE

VALIDATION

DATE/TIME CONTRACTOR INFORMED OF COMPLAINT

ACTION TAKEN BY CONTRACTOR

RECEIVED/VALIDATED BY

PERFORMANCE ASSESSMENT REPORT (PAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACT/TASK ORDER NUMBER
2. CONTRACTOR
3. TYPE OF SERVICES

4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE

5. COR PHONE
6. SUSPENSE DATE

I. PERFORMANCE

7. FORMCHECKBOX

DEFICIENCY (CHECK ALL BOXES THAT APPLY)

FORMCHECKBOX

NEW

FORMCHECKBOX

REPEAT

FORMCHECKBOX

NO DEFICIENCY NOTED

8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED

9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT

II. CONTRACTOR VALIDATION

11. CONTRACTOR REPRESENTATIVE FORMCHECKBOX

CONCUR FORMCHECKBOX

NON-CONCUR

12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE

13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY

III. ACTION CORRECTED

14. FORMCHECKBOX

CONCUR FORMCHECKBOX

NON-CONCUR COR SIGNATURE AND DATE

15. COR REMARKS (REQUIRED)

16. CONTRACTOR REPRESENTATIVE REMARKS

File details come from the government source that posted it. Updated .