SOW_Install_Snow_Equipment_20150910.pdf

PDF 127 KB Posted

Attached to
Purchase and Installation of Snow Plows
Solicitation number
FA4484-15-T-0061
Issued by

View the file

Other files

File Type Posted
FAR_52.212-3_Reps_and_Certs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

TO

PROVIDE AND INSTALL NEW SNOW PLOWS FOR SNOW EQUIPMENT AT

JOINT BASE MDL, NEW JERSEY

DESCRIPTION OF SERVICES: The contractor shall provide all personnel, equipment, tools, materials, supervision and other items necessary to provide and install six (6) Meyer snow removal plows on six (6) snow removal vehicles. The contractor will remove existing snow plow components, provide and install all new components. The snow plows will be yellow in color. Vehicles will be delivered to the contractor’s facility by the customer, and picked up upon completion. As a result, the contractor’s facility must be within a 50 mile radius of JB MDL (McGuire).

1. Snow Equipment Installation Breakdown

1.1. Provide Meyer Snow Plows (or equal) and install on 6 vehicles: One (1) 2008 FORD DUMP

TRUCK / model (F750); two (2) 2008 INTERNATIONAL DUMP TRUCKS / model (4300 SBA

4X2); one (1) 2010 INTERNATIONAL DUMP TRUCK / model (7400 6X4); one (1) 2012

FREIGHTLINER DUMP TRUCK / model (M2106). Requires removal of the existing snow plow frames and wiring. RP 10-36 Straight Blade 10’ Snow Plow (or equal).

Plow Part #s

09438 - RP10-36 MOLD BRD

16521 - PAFRDPROSULLTRP

16522 - MTGKITRPBUMP

15825 - HYDE70PA12V

07550 - LITE CARTON

22690 - PISTOL/CONTROL

1.1.1. One (1) 2014 FORD PICK-UP TRUCK / model (250) - requires removal of existing snow plow undercarriage and wiring. Install (1) new Meyers Plow LP8.0 8’ Full Trip Snow Plow.

Plow Parts #s

09401 - LOTPRO 8FT

41325 - PKG: LP7.5-9

22690 - PISTOL/CONTROL

17163 - FORD PLUS MNT

07417 - LITE ADPTR

POINTS OF CONTACT:

Primary: Marcus Hughes at 609-754-6754 located in Bldg 3104, Operations Support, JB-MDL

Alternate: Mr. Brad Warren at 609-754-5475 located in Bldg 3104, Operations Support, and JB-MDL

INSPECTION / ACCEPTANCE OF PROJECT COMPLETION: A final inspection will be scheduled upon completion of all work. Contact the POCs two (2) days prior to completion for a site visit.

File details come from the government source that posted it. Updated .