Attachment_5-Material_Submittal_Schedule_Templete.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Design/Build Rpr/Sus Emergency Generators Federal contract opportunity
- Solicitation number
- FA4460-16-B-0007
About this file
Material Submittal - FA4460-16-B-0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Generator_Questions Answers.docx | DOCX document | |
| FA4460-16-B-0007_Amendment__2.pdf | ||
| FA4460-16-B-0007-0001.docx | DOCX document | |
| Site_Visit_-_Sign-In_Sheets.pdf | ||
| SOW_4-14.docx | DOCX document | |
| Attachment_6_-_LRAFB_Information.docx | DOCX document | |
| FA4460-16-B-0007.pdf | ||
| Attachment_2-EMIS_Instruction_Guide.doc | DOC document | |
| Attachment_7-SoW_NKAK_17-1003.docx | DOCX document | |
| Attachment_3-Environmental_MOA.doc | DOC document | |
| Attachment_1-Wage_Determination_-_AR132.pdf | ||
| Attachment_4-C D_Report.doc | DOC document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS ACES Project Title
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
fergusog: Enter any comments pertaining to the submittal
| 1 | 01 14 19 Coordination 1.15 Radioactive Material | X | X | X | |
| 2 | 01 45 00 Quality Control 1.04 Cultural Resource Management | X | |||
| 3 | 01 45 00 1.05 Temporary Erosion Control Measures | X | X | X | |
| 4 | 01 57 23 Storm Water Pollution Prevention Plan 1.03 | X | X | X | |
| 5 | Generators | X | X | X | |
| 6 | Electrical Gear | X | X | X | |
| 7 | |||||
| 8 | |||||
| 9 | |||||
| 10 | |||||
| 11 | |||||
| 12 | |||||
| 13 | |||||
| 14 | |||||
| 15 | |||||
| 16 | |||||
| 17 | |||||
| 18 | |||||
| 19 | |||||
| 20 | |||||
| 21 | |||||
| 22 | |||||
| 23 | |||||
| 24 |
Schedule of Material Submittals Template, Feb 2010 (SAF/AQCP) AF FROM 66