Attachment_5-Material_Submittal_Schedule_Templete.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Design/Build Rpr/Sus Emergency Generators Federal contract opportunity
Solicitation number
FA4460-16-B-0007
Issued by
Department of the Air Force Air Mobility Command

About this file

Material Submittal - FA4460-16-B-0007

View the file

Other files for this federal contract opportunity

Other files attached to Design/Build Rpr/Sus Emergency Generators, newest first.
File Type Posted
Generator_Questions Answers.docx DOCX document
FA4460-16-B-0007_Amendment__2.pdf PDF
FA4460-16-B-0007-0001.docx DOCX document
Site_Visit_-_Sign-In_Sheets.pdf PDF
SOW_4-14.docx DOCX document
Attachment_6_-_LRAFB_Information.docx DOCX document
FA4460-16-B-0007.pdf PDF
Attachment_2-EMIS_Instruction_Guide.doc DOC document
Attachment_7-SoW_NKAK_17-1003.docx DOCX document
Attachment_3-Environmental_MOA.doc DOC document
Attachment_1-Wage_Determination_-_AR132.pdf PDF
Attachment_4-C D_Report.doc DOC document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS ACES Project Title

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

fergusog: Enter any comments pertaining to the submittal

101 14 19 Coordination 1.15 Radioactive MaterialXXX
201 45 00 Quality Control 1.04 Cultural Resource ManagementX
301 45 00 1.05 Temporary Erosion Control MeasuresXXX
401 57 23 Storm Water Pollution Prevention Plan 1.03XXX
5GeneratorsXXX
6Electrical GearXXX
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Schedule of Material Submittals Template, Feb 2010 (SAF/AQCP) AF FROM 66