FA4460-16-B-0003_Questions_and_Answers.docx

DOCX document 17 KB Posted

Attached to
Design/Build Repair B-362 Roof
Solicitation number
FA4460-16-B-0003
Issued by

About this file

Question and answer document.

View the file

Other files

File Type Posted
FA4460-16-B-0003-0001.doc DOC document
Attachment_8_-_Roof_Survey.pdf PDF
Attachment_9_-_NKAK_13-1042_As-Builts.pdf PDF
Attachment_7_-_NKAK_13-1042_SOW.pdf PDF
Attachment_2_-_C D_Report.doc DOC document
Attachment_1_-_Environmental_MOA.doc DOC document
Attachment_3_-_Material_Submittal.pdf PDF
Attachment_4_-_EMIS_Instruction_Guide.doc DOC document
Attachment_5_-Wage_Determination_AR150132.docx DOCX document
FA4460-16-B-0003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4460-16-B-0003

REPAIR (R&M) 19 MXS HQ ROOF

BLDG 362

NKAK 13-1042

PRE-DESIGN QUESTIONS

13 May 2016

1. Is fire sprinkling required in the new attic required?

Fire sprinklers are required – See UFC 3-600-01, paragraph 4-2.3.6. If so, does the existing building have a fire sprinkler system and will a fire protection engineer be required to design the attic system? Yes to both.

2. Can the R-38 insulation be placed on top of the existing roof deck?

This is a design issue and should be worked out during design. The purpose for the R-38 insulation is to insulate the building. If the building envelope can be extended up to include the insulation, if it can be protected, and if it doesn’t add a flammable substance to the attic space, then it could be considered. The D/B Contractor will have to ensure that all codes are met regardless of the location of the insulation.

3. There are three louvers on the west side of the second floor mechanical room that is the outside air intake for the three air handlers inside the mechanical room. Is it acceptable to extend ductwork from these louver locations into the new attic and through the roof to maintain the air flow for the units?

This is a design issue and should be worked out during design. If the louvers are rerouted thru the roof, they will have to be warranted as part of the roof system. Sizing of extensions will have to be sized according so that intakes will not be limited.

4. Can access into the new attic be thru the existing second floor mechanical room?

This is a design issue and should be worked out during design. Not sure if there is enough room available in the MECH room to provide access to the attic area. Regardless of location the D/B Firm shall supply secure, lockable, and permanent access to all attic areas.

5. Are entrance roofs included in the scope and/or are new entrances to be constructed?

I am not sure what you mean by “Entrance roofs”. If you are referring to the canopies then no, they are not in the SOW.

6. Which units on the roof are operable/to remain?

I am not sure what “units” you are referring too. There are not any roof top HVAC units on the roof. There are however, several ventilators, plumbing stacks, and motorized ventilators that may or not need to be relocated. These will have to be determined during the design process.

Attachment 10
Page 1 of 1