SOW_FOR_NKAK_15-1063.docx
DOCX document 1 MB Posted
- Attached to
- Asbestos Abatement VQ1020 Federal contract opportunity
- Solicitation number
- FA4460-15-T-0010
About this file
Statement of Work has been uploaded.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Asbestos_Abatement_Info.docx | DOCX document | |
| Drawing_A-1.pdf | ||
| Solicitation_FA4460-15-T-0010.pdf | ||
| Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION SPECIFICATIONS FOR:
RPR (SUS) VQ 1020
ASBESTOS ABATEMENT
NKAK 15 1063
Air Mobility Command
LITTLE ROCK AIR FORCE BASE
ARKANSAS
Prepared By
19TH CIVIL ENGINEER SQUADRON
04 February 15
TABLE OF CONTENTS 2
TABLE OF CONTENTS
| TABLE OF CONTENTS | 3 |
| DIVISION 1 – GENERAL REQUIREMENTS | 4 |
| SECTION 01 11 00 – SUMMARY OF WORK | 4 |
| SECTION 01 14 16 – OCCUPANCY | 6 |
| SECTION 01 14 19 - COORDINATION | 6 |
| SECTION 01 33 00 - SUBMITTAL PROCEDURES | 9 |
| SECTION 01 45 00 - QUALITY CONTROL | 11 |
| SECTION 01 50 00 - CONSTRUCTION FACILITIES & TEMPORARY CONTROLS | 13 |
| SECTION 01 63 00 - SUBSTITUTIONS AND PRODUCT OPTIONS | 17 |
| SECTION 01 63 50 - MATERIAL SHIPMENTS | 18 |
| SECTION 01 69 99 - REAL PROPERTY RECORDS | 19 |
1 – GENERAL REQUIREMENTS
01 11 00 – SUMMARY OF WORK
GENERAL
PROJECT SERVICES
Contractor shall provide all design, plant, labor, materials and equipment necessary to fully meet all requirements of this Summary of Work, Construction Specifications, Construction Drawings and all other Contract Documents related to and/or titled: “RPR (SUS) VQ 1020 ASBESTOS ABATEMENT, NKAK 15-1063” at Little Rock AFB, Arkansas.
PRINCIPAL FEATURES
Principle features of the work consist of but are not limited to the following:
Containment of asbestos Abatement of all asbestos in rooms Removal
PHASING
As required for the uninterrupted operations of the facility and in coordination with the operating manager of the facility. Contact person is Gerald McCray, Lodging Manager 731-3067.
The above general outline of the principal features does not in any way limit the responsibility of the Contractor to perform all work required by the plans and specifications.
PROJECT AREA LIMITATIONS
A. All work shall be performed in the immediate project area. Refer to the drawing A-1.
DOCUMENTS
The Contractor shall:
Check all Government furnished construction drawings immediately upon receipt;
Compare all Government furnished construction drawings and verify the figures before laying out the work;
Promptly notify the Contracting Officer of any discrepancies Be responsible for any errors which might have been avoided by complying with this paragraph (1.04 A).
Large scale drawings shall, in general, govern over small scale drawings. Figures marked on drawings shall, in general, be followed in preference to scale measurements.
Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work, but shall be performed as if fully and correctly set forth and described in the drawings and specifications.
The Contractor shall maintain a complete set construction specifications, project related sketches, pictures, approved Contract modifications (if any) and all approved submittals on the job site at all times. One set of such construction drawings shall be designated the "Record Drawings" upon which as-built data shall be neatly recorded and dated in red ink by the Contractor. Contemporaneous annotation of accurate As-Built data on the Record Drawings is to be verified by the Contracting Officer and the Contracting Officer’s Representative, as a prerequisite to the Contractor receiving progress payments. Upon completion of construction, the Contractor shall submit a copy of record drawings and update The Contractor shall perform an as-built drawings to provide this information to the Government as specified in Section 01 33 00 SUBMITTAL PROCEDURES.
Where conflicts between the drawings and specifications occur, whether Contractor produced or Government provided, the more stringent, requirement shall be followed.
EXISTING WORK
Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work, which remain.
Repair or replace portions of existing work, which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
Contractor shall protect all Government property against damage, to include but not limited to dust, fumes, impact, scratching, water, paint, joint compound, power failure, power surges, weather, heavy equipment, et cetera. All damages caused by the Contractor, whether to equipment, furniture, roads, landscaping, building components or any other type of Government property encountered at or near the project site shall be repaired or replaced to match existing and to the satisfaction of the Contracting Officer at no cost to the Government.
PRODUCTS (Not Used) EXECUTION (Not Used)
END OF SECTION – SUMMARY OF WORK
SUMMARY OF WORK 01 11 00 - 4
01 14 16 – OCCUPANCY
GENERAL
OCCUPANCY
The area of work designated for asbestos abatement under this contract will be unoccupied during construction. Any abatement work performed along corridors must be coordinated with the Project Manager and Lodging Manager to insure life safety exit egress provisions from the premises are adequately maintained.
Contractor shall not be required to relocate occupant’s furniture and equipment to temporary location prior to beginning work. After completion of project the contractor shall not relocate the furniture and equipment back to the permanent facility.
PRODUCTS (Not Used) EXECUTION (Not Used)
END OF SECTION – OCCUPANCY
01 14 19 COORDINATION
GENERAL
TERMS
The initials “CO” shall mean the Contracting Officer. The initials “COR” refer to the Contracting Officer’s Representative. The Contracting Officer’s Representative will be the Base Civil Engineer’s Project Manager assigned from the 19th Civil Engineer Squadron to monitor this contract. This is applicable to all specification sections.
WORK SCHEDULE
Little Rock Air Force Base work hours are 7:30 a.m. to 4:30 p.m. all days of the week except Saturday, Sunday and Federal Holidays. Contractor shall not perform any work outside of these work hours without obtaining written approval from the Contracting Officer. If weekend or evening work is required due to utility outages or other requirements, such work shall not be performed without prior written approval of the Contracting Officer and such work shall be accomplished at no additional cost to the Government. The Contracting Officer requires at least seven (7) calendar days notice, in writing, from the Contractor to provide written approval or disapproval.
(Note to Project Manager: include section 1.02.B if project includes airfield work at the base itself, All American Landing Zone or Black Jack Drop Zone. All airfield projects that penetrate any of the imaginary surfaces identified in UFC 3-260-01, Airfield and Heliport Planning and Design must have a temporary airfield construction waiver (approved by installation commander) prior to work start. See the CE Community Planner for a determination on this waiver.)
PROTECTION OF EXISTING FACILITIES
The Contractor shall conduct and schedule all work in a manner to cause as little disruption as possible to the existing facilities and operation. Phase work shall be required in hallways and corridors to maintain life safety and exit egress without unnecessary interruptions.
The Contractor shall ensure that the existing building is maintained weatherproof at all times. The buildings HVAC system shall also be maintained in full operating order by the Contractor. The Contractor shall provide and install seals at the HVAC system to provide full containment and prevent contamination of the asbestos material into the HVAC system during the abatement and removal process.
SITE VISITATION
The Contractor shall be responsible to visit the project site prior to, and during, the course of construction to verify existing conditions, actual sizes, and other requirements outlined in the other sections of the specifications.
Existing Facilities/Job Site Verification.
Record drawings, showing existing facilities and underground utilities, are available to the Contractor through the Base Civil Engineer office. The Government does not guarantee the accuracy, availability or adequacy of existing as-built/record drawings. The Contractor is responsible to verify all dimensions and actual conditions when developing individual delivery order proposals. Failure to verify the dimensions and locations will be at the Contractor’s risk and shall not relieve the Contractor from accomplishing the work required by the contract at the price awarded by the Government. The Contractor shall immediately repair any utility line shown on a record drawing (or made known to the Contractor) and damaged during construction work, at no cost to the Government.
BASE REGULATIONS
The Contractor shall conform to all base regulations and directives pertaining to security, safety, debris removal, fire, traffic and personnel clearances, insofar as they pertain to the Contractor's activities on Little Rock Air Force Base. Contractor shall ensure conformance by all employees and Sub-Contractors.
FIRE PROTECTION
The Contractor shall be responsible for conformance with base fire regulations and NFPA 241, including Appendix A. These regulations are available for review during duty hours at the Base Fire Station located in Building 239. Fire extinguishers required during the construction period shall be furnished and maintained by the Contractor and removed by the Contractor upon acceptance of the facility by the Contracting Officer. No welding/cutting and open flame operation shall be allowed in facilities when automatic fire detection and suppression systems are out of service unless the Contractor posts a fire guard for 24 hours after welding/cutting and open flame operation or certifies the facility fire safe.
WELDING PERMIT
Prior to performing any welding, cutting or brazing, the Contractor shall obtain a properly completed AF Form 592 (Burning Permit) from the Base Fire Department. A permit is required per job, per day. Contractor shall return all welding, cutting, or brazing permits to the 19 CES Fire Department at the end of each week, at a minimum. The Contractor shall maintain a fully charged fire extinguisher on site at all times regardless as to whether or not welding, cutting, or brazing is being performed.
Hot Welding (delete paragraph if no JP8 pipeline welding, UST/AST work, or other fuels work is being done): A step by step plan shall be submitted 15 days prior to hot welding to the Contracting Officer and accepted by AMC. The plan shall cover the location of the weld, material to be used, size of the line, material in the line, safety precautions, welding procedures, etc. The Contractor shall comply with 29 CFR 1917.152 welding, cutting, heating (Hot work) and 29 CFR 1926 subpart J welding, cutting Fire prevention. The Contractor shall be responsible to verify a vapor free environment as defined by 29 CFR 1917 with a Backarach 514M meter. The Government will not supply the meter. The plan shall also contain the dates of the proposed welds and the estimated time the fuel lines will be down. A Command Certified Liquid Fuels Manager (LFM) shall be on site during all hot work. NO WORK SHALL PROCEED UNTIL THIS PLAN IS APPROVED.
OCCUPANCY OF GOVERNMENT FACILITIES
When the Contractor has complete or partial occupancy of any building or facility, the Contractor shall be responsible for properly informing the Contracting Officer’s Representative of any condition which would jeopardize the building or its contents, such as loss of heat, air conditioning, danger of pipes freezing, loss of electric power, water, sewer or gas services or loss of building security. Contractor shall call telephone number 987-6434 and inform the Contracting Officer’s Representative or, if after duty hours, call 987-6553, CE Service Call. Contractor is responsible for correcting all situations under the scope of this contract or caused by the Contractor, and shall notify the Contracting Officer’s Representative and/or CE Service Call immediately for situations not covered by this contract, or emergency situations beyond the Contractor’s control.
ASBESTOS:
Removal of asbestos materials shall be accomplished by this Contract. Asbestos identified shall be removed as a part of lump sum cost for this contract. The Contractor shall be responsible for notifying the Contracting Officer and Contracting Officer’s Representative of any additional asbestos discovered during construction. The Contracting Officer will obtain testing of the material in question and instruct the Contractor accordingly.
PRODUCTS (Not Used) EXECUTION (Not Used)
END OF SECTION – COORDINATION
COORDINATION 01 14 19 - 8
01 33 00 - SUBMITTAL PROCEDURES
GENERAL
SUBMITTALS
Catalog cut sheets, brochures, shop drawings and/or samples shall be clearly marked/indicated by the Contractor and submitted to the Contracting Officer for the items on the schedule, drawings and other sections of the specifications. All salient features of materials required to be submitted shall be easily found in the submittal package for each item and not require research on the part of the Government to determine compliance with Contract requirements Four (4) copies of AF Form 3000 shall be utilized for each numbered submittal. Different categories of submittal items are not to be grouped on the same AF Form 3000.
All items shall be approved by the Contracting Officer prior to purchase, delivery or installation.
All items shall be submitted in four (4) copies not more than twenty (20) calendar days after Contractor's receipt of Notice to Proceed. Operations and Maintenance (O&M) manuals shall be submitted for approval by the Contracting Officer, prior to final inspection.
Not less than ten (10) business days shall be allowed for review of submittals by the Government.
Two copies of submittals will be returned to the Contractor unless otherwise specified. A sample of all items requiring color selection will be retained by the Contacting Officer for reference.
Refer to Section 01 63 00 - Substitutions and Product Options.
Contractor shall be responsible for complying with the EPA’s buy recycled program. See Section 01 62 35 RECYCLED/RECOVERED MATERIALS.
MATERIAL SAFETY DATA SHEET (MSDS) SUBMITTALS
All submittals for products shall include the MSDS when an MSDS is required by law for that product.
MSDS’s shall also be submitted on AF Form 3000 for all products to be used during the course of the project, not otherwise requiring a submittal, but which may be of a toxic, hazardous, flammable or otherwise dangerous nature.
Approval by the Hazardous Materials Office (HAZMO), Building 1575, 987-5247, is required before bringing the materials on base. Little Rock AFB AF-EESOH-MIS Contractor Worksheet and an MSDS must accompany the submitted material. This Contractor worksheet will be furnished by the Government along with an instruction guide. Additionally, the Contractor shall submit a Government supplied Contractor Hazardous Material Usage Data sheet to the Government once a month for contracts lasting longer than 60 days once the materials are brought on base and until the materials are used or removed from the base. For projects lasting less than 60 days, the Contractor Hazardous Material Usage Data sheet shall be submitted to the Government after construction is complete. The form shall list the amount of materials used and shall also list any materials which are considered a hazardous waste when the Contractor can no longer use the material for its intended form or reuse as a virgin product at a later date. All hazardous waste shall be turned in to the base Centralized Accumulation Point (CAP), 987-8073.
All HAZMAT that is not used on the project but is still in usable condition must be removed from the base by the Contractor upon completion of the project. CAP will not accept unused HAZMAT such as paint, thinners etc. that are still usable as they belong to the Contractor.
The contractor shall have a maximum 30 day supply of hazardous materials for use on the contract stored on Little Rock AFB. All containers over five gallons shall be labeled with the contract number.
PRODUCTS (Not Used) EXECUTION (Not Used)
END OF SECTION – SUBMITTAL PROCEDURES
SUBMITTAL PROCEDURES 01 33 00 - 10
01 45 00 - QUALITY CONTROL
GENERAL
WORKMANSHIP
All materials and equipment shall be installed in a manner accepted by standard trade practice. Workmen skilled in the type of work required shall accomplish the installation.
TRAFFIC SAFETY
Special efforts shall be made not to interfere with traffic flow or create safety hazards to traffic.
DEBRIS DISPOSAL
Debris shall be removed from the Base promptly, and as feasible, all equipment and materials shall be removed or secured at the end of each day. The Contractor is responsible for the daily cleanup of all construction areas and construction debris that has escaped from the construction site.
The Contractor shall exercise caution in not disturbing adjacent facilities, finishes, materials, grounds and other items not a part of this project. The Contractor shall clean daily all areas outside the project area of dirt, dust, and debris generated by this contract.
The Contractor shall use designated haul routes for both delivery and removals. Haul routes are noted on the drawings.
All debris generated by the contract shall be properly disposed of by the Contractor off the base. Removal of debris and other material shall be handled, transported, stored, and disposed of by the Contractor and his Subcontractors in accordance with all applicable federal, state or local laws, ordinances, regulations, court orders or other types of rules or rulings having the effect of laws. These restrictions shall apply both on and off base.
The Contractor shall submit with the regular progress reports a Government supplied Contractor Construction and Demolition Debris Report. This form lists the amount of materials disposed at a landfill, recycled or otherwise reused. This submittal is required before progress payments can be made and also applies to any debris by subcontractors.
The Contractor shall take all precautions to prevent spillage of materials from Contractor vehicles on base pavements. The Contractor shall provide adequate labor and equipment to keep paved areas free of debris, and to contain loose materials at all times.
RECYCLING MATERIALS
The Contractor shall notify the Contracting Officer’s Representative a minimum of two weeks prior to removing recyclable materials identified to be turned in to the Government. The Contracting Officer’s Representative will arrange with the Recycling Center for Government furnished dumpsters to be placed near the construction site. Each type of material will be placed in separate dumpsters. The following recyclable materials are to be turned in to the Government.
Electrical wire, conduit, junction boxes, etc.
Metal pipe and plumbing fixtures Sheet metal, such as in ductwork and flashing Metal HVAC equipment (air handlers, chillers, pumps, condensers, etc.)
Metal components from roofs, framing, siding, doors and windows and ceiling grids Window glass, except for wire reinforced safety glass.
Cardboard All plastic that has the recycle emblem arrows (1, 2, 3, 4, etc.). This includes empty plastic pails, drums and shrink wrap.
No removed carpet from the asbestos abatement process shall be recycled. Contaminated carpeting, floor tiles, ceiling tiles shall be properly disposed in accordance to local, state and federal requirements.
Only removed carpet free of asbestos trace amounts shall be recycled and the Contractor shall provide written certification that the carpet was not placed in a landfill. Contractor certification shall indicate how the material was recycled and provide the address where it was delivered.
Only removed ceiling tile free of asbestos trace amounts shall be recycled and the Contractor shall provide written certification that the ceiling was not placed in a landfill. Contractor certification shall indicate how the material was recycled and provide the address where it was delivered.
FINAL INSPECTION AND ACCEPTANCE OF WORK
As construction nears completion, the Contracting Officer’s Representative and the Contractor's Quality Control representative and Superintendent shall thoroughly inspect the work and generate a deficiency (punch) list. When this list has been cleared, the Contracting Officer’s Representative will schedule a preliminary inspection, using organization and Government specialists of the systems installed under the Contract. When all deficiencies are corrected, the Contractor shall request a final inspection, to be conducted by the Contracting Officer and Contracting Officer’s Representative. For phased work, this process may be repeated for each phase.
PRODUCTS (NOT USED)
EXECUTION (NOT USED)
END OF SECTION – QUALITY CONTROL
QUALITY CONTROL 01 45 00 - 12
01 50 00 - CONSTRUCTION FACILITIES & TEMPORARY CONTROLS
GENERAL
GOVERNMENT FURNISHED UTILITIES
All reasonable quantities of utilities required in performance of this contract will be furnished by the Government at no cost to the Contractor. The Contractor shall make such temporary connections from existing points of supply as required. Such temporary connections shall be removed by the Contractor at the completion of work and prior to final inspection. All temporary connections and subsequent removal shall be at Contractor expense.
USE OF POTABLE WATER.
All Contractors shall obtain water from a designated Base water fill stand(s). A fill stand is located at 472 4TH Street.
If the Contractor has a justifiable need to obtain water at the project site, the Contractor shall request permission in writing to the Contracting Officer to construct an onsite fill stand. The request shall include plans and specifications for the construction of an on site water fill stand. The Construction Manager will coordinate the request with CE Operations and Environmental Flights and Security Forces for approval/disapproval of the request. The Contractor shall receive approval from the Government prior to construction and use of an on-site fill stand and then have the installation tested and inspected.
The plans and specifications shall include the following features:
A Reduced Pressure Zone Type (RPZ) backflow prevention check valve on the water outlet, fire plug, etc.
A system capable of locking out or securing the water release valve when the system is unattended.
Insulation and freeze protection if the system is operated during cold weather.
0. The Contractor shall have the RPZ backflow preventer tested and certified by a State of Arkansas licensed Assembly Testing Technician. The test results shall be documented on a CE provided report form and submitted for final coordination.
Within 3 working days of receipt of the certified test form, the system shall be inspected by a CE Operations Utilities Shop licensed plumber. The system shall not be used until approved by the CE plumber.
If, after certification of the onsite fill stand, the Contractor removes the device for any reason or moves the location of the on-site fill stand during the project, the Contractor shall repeat steps b and c.
For all irrigation projects the Contractor shall install a vacuum breaker on outside faucet hose bibs prior to connecting any garden hose or soaker hose.
No Contractor, Contractor employee, or sub-contractor(s) shall obtain water by a direct connection between a potable water outlet and a water tank or vessel without prior written approval as described in paragraph 1.01 A. 2. If it is discovered that a Contractor, Contractor employee, or sub-contractor is/has obtaining water from an unauthorized source, the Contractor will be directed to take the following actions at no additional cost to the Government:
The Contracting Officer shall issue a stop work order and the water tank or vessel will be impounded by the Government for sampling/analyses.
The Government or designated testing laboratory shall take water samples from the water tank or vessel, the water main outlet, and from no less than three other ancillary water outlet sources. The samples will be sent to an independent testing laboratory to be analyzed, on an expedited schedule, for the presence of the USEPA National Primary Drinking Water Contaminant Standard (NPDWCS) parameters (101 total contaminants). All costs related to sampling and testing shall be at the Contractor’s expense.
If the samples reveal an action level of any of the NPDWCS parameters, the entire water distribution system shall be disinfected IAW the Arkansas Department of Health (ADH) and EPA standards. The disinfection shall be at the Contractors expense.
HEATING OF FACILITIES
The Contractor shall provide temporary heat at least 65 degrees F but not to exceed 70 degrees F between November 1st and April 1st, unless the heating system is fully operational. The proposed method and temporary heating appliances shall be submitted to, and approved by, the Contracting Officer prior to November 1st. Only UL Approved appliances will be considered.
STORAGE
Enclosed storage space shall be provided by the Contractor at no cost to the Government. The Contractor shall remove all storage enclosures prior to the final inspection.
As feasible, all equipment and materials shall be removed or secured at the end of each day. Storage, protection and security of material and equipment when not in use shall be the responsibility of the Contractor.
A material storage/staging area will be made available to the Contractor, but close proximity to the project site may not be possible. All fenced areas, portable buildings, house trailers, semi-trailers, or other temporary constructions by the Contractor shall be in good condition and bear a sign showing the name and address of the Contractor and a day and night local telephone number where the Contractor can be reached. Construction debris, salvaged materials, and/or trash shall not be stored in staging area. Grass inside and adjacent to the fenced area shall be neatly mowed regularly by the Contractor during the period of usage by the Contractor.
CONSTRUCTION SIGN
A construction sign is required for each abatement area unless otherwise noted. Sign shall be 2 foot by 2 foot, 15/32” plywood mounted at the work site to clearly indicate the work area and containment area. Provide any other signage as required by local, state and federal regulations pertaining to work areas where asbestos abatement is in progress.
TEMPORARY AND PERMANENT TRAFFIC CONTROL
Contractor shall provide and install all required temporary traffic control signs or device, as applicable for this contract. The traffic signs or devices shall conform with the Manual on Uniform Traffic Control Devices for streets and highways, U.S. Department of Transportation, Federal Highway Administration, latest edition. Provide amber flashing lights to protect the construction area from intrusion by traffic. Location of lights shall be approved by the Contracting Officer. Lights shall be weighted and made secure from possible movement until the area is open to traffic.
CONTRACTOR'S USAGE OF FACILITIES:
The Contractor shall provide a properly and regularly maintained portable toilet for use by workers.
Contractor shall not enter the occupied portion of the building to use restrooms, telephones, or other facilities.
Smoking is prohibited in all Government facilities under this contract.
WORK SEQUENCE
In addition to Progress Schedule, the Contractor shall submit for approval by the Contracting Officer four copies of a work sequence schedule showing the sequence of work by area including estimated dates for beginning work in each area. No work shall commence until approval of the work sequence schedule.
POLICE PROTECTION
19th Security Forces Squadron (SFS) is responsible for overall base security and traffic control of vehicles entering or leaving Little Rock Air Force Base. The Contractor is required to conform to all appropriate Air Force Security Regulations and shall not interfere with the performance of Security Forces duties and responsibilities. The Contractor shall be responsible for obtaining all necessary security passes for personnel, Sub-Contractor’s personnel and all vehicles.
STREET CLOSINGS
Street closings will be limited to partial, one lane closings whenever possible. Any partial or full street closing shall be requested in writing at least one (1) week prior to the desired date. The Contractor shall provide Road Closed or Detour signs in accordance with paragraph 1.05 of this section. (as applicable)
SAFETY
Contractor shall conform to all applicable portions of the latest Corps of Engineers Safety and Health Requirements Manual EM 385-1-1.
CONTRACTOR FURNISHED COMMUNICATIONS
Contractor’s Superintendent shall be equipped with a cellular telephone and be reachable by telephone at any time during the normal workday. The cellular phone number shall be a local call from Little Rock AFB.
Contractor’s Superintendent shall be reachable, by telephone and/or cellular phone, 24 hours a day, seven days a week. (We need this for emergencies particularly on re-roofing of occupied buildings, airfield lighting work and airfield paving work.)
CLEANUP
Construction debris, waste materials, packaging material and the like shall be removed from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways shall be cleaned away. Materials resulting from demolition activities which are salvageable shall be stored within the fenced area described above or at the supplemental storage area. Stored material not in trailers, whether new or salvaged, shall be neatly stacked when stored.
PRODUCTS (Not Used) EXECUTION (Not Used)
END OF SECTION – CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 01 50 00-16
01 63 00 - SUBSTITUTIONS AND PRODUCT OPTIONS
0. GENERAL
BRAND NAMES
"Brand Names" are specified in several places throughout the specifications. The use of specific "names" is intended only to define type, quality, size, and other salient features required. Therefore, all brand name items listed are to be interpreted as "or approved equal" unless specifically noted otherwise.
PROPOSED SUBSTITUTIONS
The burden of ascertaining product/performance equality of proposed substitutions from those items specified is to be borne by the Contractor. Product substitutions will be accepted for review, and potential acceptance, by the Contracting Officer. If data provided by the Contractor is deemed inadequate to make a determination as to the equality of the proposed substitute, without additional research by the Government, it will be rejected. Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions, nor from responsibility for complying with the requirements of this contract, except with respect to variations described and approved by the Contracting Officer.
EXACT PRODUCT SPECIFIED
If exact products are specified in the construction drawings or construction specifications, and the Contractor intends to use those same products in the construction work, submittal requirements in Schedule of Material Submittals and the technical specifications for catalog cuts, manufacturer's literature, and samples are waived. The Contractor shall provide a list of products that fall into this "intended use of exact product specified" category along with the manufacturer's installation/application instruction, for each product on the list. This list and manufacturer's installation application instructions shall be provided within twenty (20) days after the Notice-to-Proceed for review and approval by the Contracting Officer. Note that this will not take the place or affect the requirement for operations and maintenance (O&M) manuals.
PRODUCTS (Not Used) EXECUTION (Not Used)
END OF SECTION – SUBSTITUTIONS AND PRODUCT OPTIONS
SUBSTITUTIONS AND PRODUCT OPTIONS 01 63 00 - 17
01 63 50 - MATERIAL SHIPMENTS
GENERAL
MATERIAL SHIPMENTS
The Government will not receive material shipments for construction projects and the Contractor shall not ship materials to himself addressed in care of Base Civil Engineer, Squadron or the Base Contracting Office. Receiving and storage of all construction shipments is entirely the responsibility of the Contractor.
SHIPMENT AND PROTECTION OF MATERIAL AND EQUIPMENT
Shipments shall be addressed to the Contractor who shall be responsible for their receipt, unloading, handling, and storage at the site. Government will not accept deliveries on behalf of the Contractor or his subcontractors or assume responsibility for security of materials, equipment, or supplies delivered to the site. Contractor shall protect and preserve materials, supplies, and equipment of every description (including property which may be Government furnished or owned) and work performed.
PRODUCTS (Not Used) EXECUTION (Not Used)
END OF SECTION - MATERIAL SHIPMENTS
MATERIAL SHIPMENTS 01 63 50 - 18
01 69 99 - REAL PROPERTY RECORDS
GENERAL
REAL PROPERTY CHECKLIST
The Contractor shall complete and submit Real Property Checklist (DD Form 1354) 30 days before pre-final inspection for acceptance at the final inspection. The checklist will be provided to the Contractor prior to pre-final inspection and will be annotated as to what portions shall be required to be completed.
The checklist contains items of construction for Real Property records. Examples are: square footage of facility/additions, linear feet of utility lines, sizes and cost of HVAC systems, etc.
PRODUCTS (Not Used) EXECUTION (Not Used)
END OF SECTION – REAL PROPERTY RECORDS