AFFF 2011 PWS.pdf
PDF 205 KB Posted
- Solicitation number
- FA4460-11-T-0017
About this file
AFFF Performance Work Statement (PWS)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA4460-11-T-0017.pdf | ||
| WD 05-2033 22 JUN 2010.pdf | ||
| FA4460-11-T-0017-P0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFFF PWS
16 FEB 2011
PERFORMANCE WORK
STATEMENT
FOR
HANGAR FIRE SUPPRESSION SYSTEM
AFFF AND FLUSH WATER
TRANSPORT, DISPOSAL & AFFF SAMPLE
LAB TESTING SERVICES
LITTLE ROCK AFB, AR
1.0 SCOPE OF WORK:
The contractor shall furnish all labor, materials, tools, equipment, transportation, supervision, and other items and/or services necessary to perform Aqueous Film Forming Foam (AFFF) sample testing, transport, and disposal services of AFFF and flush water from multiple hangar fire suppression systems on Little Rock Air Force Base (LRAFB), Arkansas.
LRAFB is required to inspect and flow test each fire suppression system annually. Most hangars have a 3% AFFF/water system. The AFFF is a non-RCRA material that must be disposed of in a landfill meeting State and Federal regulations for non-RCRA material disposal. The AFFF and flush water is collected by LRAFB personnel in the collection tank, or tanker truck provided by the contractor as the tests are conducted. After each hangar is serviced or when the collection tank is full, LRAFB will call the contractor to pick up the tank and deliver an empty tank.
Attachment 1 depicts the hangars to be serviced and the associated quantities. Depending on the systems being tested the tank or tanker truck may be partially full when the testing is complete.
It takes approximately one month to repair and test the fire suppression system in each hangar.
The contractor shall ensure that all materials and equipment shall be installed in a manner accepted by standard trade practice. The installation shall be accomplished by workmen skilled in the type of work required.
1.1 TRANSPORT & DISPOSAL OF AFFF & FLUSH WATER:
The contractor shall provide a roll-off collection tank with a minimum capacity of 2,500 gallons for use by LRAFB to collect AFFF and flush water from fire suppression system piping. An estimated 12,500 gallons of AFFF and flush water is collected annually.
When required, the contractor shall provide up to six (6) 800 gallon collection tanks for AFFF and flush water collection by LRAFB personnel during inspection and flow testing of the hangar fire suppression systems. The contractor shall also load/off-load these tanks.
The contractor shall transport/dispose of the collected AFFF and flush water to/at a facility meeting applicable state and federal regulations. Upon completion, the contractor shall provide a certificate, or receipt from the disposal facility showing actual quantity of AFFF and flush water collected, transported, and disposed of for each manifest.
The contractor shall provide a manifest and destruction certificate to the government each time they provide collection, transport, and disposal services. A copy of the completed manifest(s) shall be provided to the Contracting Officer and documented in the contract file.
The contractor shall calculate the volume of AFFF/flush water in each tank or tanker trailer and note the quantity on the manifest. The manifest shall show the actual quantity of AFFF and flush water collected, transported, and disposed of at an approved facility. The contractor shall notify the Contracting Officer when at least 75 % of the estimated quantity has been disposed of.
The contractor shall use the quantity specified on each manifest when billing LRAFB for the transport and disposal of the AFFF/flush water. If the measured quantity is less than 800 gallons, a minimum quantity of 800 gallons shall be charged. When billing for services, the contractor shall identify the cost of pick-up/disposal, tank rental and installation.
The contractor shall respond to a request for pick up/delivery of a roll off tank within 24 hours.
The Contractor shall call the 19 CES Project Manager for escort to the hangar to drop off / pick up of roll off tanks.
1.2 AFFF SAMPLE LAB TESTING:
The contractor shall provide up to 30 sample containers with spill-proof lids, labels and pre-paid/pre-addressed shipping containers semi-annually. The containers shall be shipped to Little
Rock AFB in November and May. The exact number of containers will be provided to the contractor at least 2 weeks prior to the required delivery date.
The contractor shall perform the following laboratory tests on each of the estimated thirty (30) samples of three percent (3%) low expansion AFFF. The exact number of samples to be tested shall be provided to the contractor when the sample containers are requested.
TEST SPECIFICATION
a. Appearance Clear to Straw colored liquid
b. Refractive Index 1.3580 Minimum
c. Specific Gravity 1.020 – 1.040
d. pH 6.0 Minimum
e. Foam Expansion cc/g 6.0 Minimum
f. 25% Drain Time, min:sec 2:30 Minimum
g. Film Formation, secs 30 Maximum
h. Overall Result Pass or Fail
The contractor shall perform the following laboratory tests semi-annually on each of the estimated three (3) samples of one percent (1%) high expansion AFFF. The exact number of samples to be tested shall be provided to the contractor when the sample containers are requested.
TEST SPECIFICATION
a. Appearance Clear to Straw colored liquid
b. Refractive Index 1.3580 Minimum
c. Specific Gravity 1.020 – 1.040
d. pH 6.0 Minimum
e. Foam Expansion 200:1 Minimum
f. 20 Minute Drain Volume 50% Maximum
g. Overall Result Pass or Fail
The contractor shall provide the 19 CES Project Manager with a written report of all the test results for each sample submitted. The report shall be transmitted via email and postal service mail.
2.0 INSTALLATION SECURITY & PROTECTION OF GOVERNMENT PROPERTY
The contractor shall abide by all Air Force and installation security regulations.
The contractor shall schedule and conduct work in a manner that minimizes disruption to facility operations.
The contractor shall minimize interference with flow of traffic.
The contractor shall not create safety or traffic hazards.
2.1 CONTRACTOR USE OF INSTALLATION FACILITIES:
The contractor shall not enter the occupied portion of the building to use restrooms, telephones, or other facilities without government personnel escort.
Smoking is prohibited in all government facilities.
3.0 HOURS OF OPERATION:
NORMAL WORK WEEK:
The contractor may make delivery/pick-up between 7:30 a.m. and 4:30 p.m. central standard time during the work week. The work week is from Monday through Friday exclusive of weekends and recognized federal holidays. The contractor shall coordinate with the 19 CES Project
Manager regarding scheduled deliveries and pick-ups. No work will be performed at any time other than the normal work week without obtaining prior written approval from the Contracting
Officer. The contractor shall submit a written request to work weekends or holidays at least seven
(7) days before the work is to be accomplished.
RECOGNIZED FEDERAL HOLIDAYS:
The following is a list of recognized federal holidays: New Year’s Day, Martin Luther King’s
Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day.
5.0 POINTS OF CONTACT
th
CIVIL ENGINEERING SQUADRON
19 CES Project Manager: C. Richard Palmer Jr.
19 CES/CEPMD Phone: (501) 987-7678
528 Thomas Ave Fax: (501) 987-3826
Little Rock AFB, AR 72099 Email: chester.palmer@us.af.mil
TH
CONTRACTING SQUADRON
Contracting Officer: Maritza Wine
19 CONS/LGCA Phone: (501) 987-8113
642 Thomas Ave Fax: (501) 987-8119
Little Rock AFB, AR 72099 Email: maritza.wine@us.af.mil
Contract Administrator: SrA Lucy Ngiraswei
19 CONS/LGCA Phone: (501) 987-7115
642 Thomas Ave Fax: (501) 987-8119
Little Rock AFB, AR 72099 Email: lucille.ngiraswei@us.af.mil
Only a warranted Contracting Officer has the legal authority to award/extend/terminate a government contract. Work performed other than the work contracted for or expressly authorized by a warranted
Contracting Officer shall be considered an “Unauthorized Commitment”. Government employees who knowingly allow service to continue/be performed in the absence of a contract may be in violation of the
Anti-Deficiency Act and may be subject to disciplinary action. Contractors who knowingly perform services in the absence of a contract or without the express authorization of a warranted Contracting
Officer run the risk of non-payment for non-contracted services provided.
All inquiries / clarifications regarding the terms & conditions of this requirement and that of the resulting contract shall be addressed by the Contracting Squadron Contracting Officer. Only a warranted
Contracting Officer has the legal authority to bind the government.
LIST OF ATTACHMENTS:
ATTACHMENT 1 AFFF ROLL-OFF TANK DELIVERY LOCATIONS
ATTACHMENT 2 AFFF SAMPLE COLLECTION POINTS FOR LAB TESTING
mailto:chester.palmer@us.af.mil mailto:maritza.wine@us.af.mil mailto:lucille.ngiraswei@us.af.mil
ATTACHMENT 1
AFFF ROLL-OFF TANK DELIVERY LOCATIONS
ST
ROUND OF BUILDINGS NUMBER OF TANKS
B-126 0
B-255N 2
B-255S 2
B-276 0
B-280 2
B-282 2 nd
ROUND OF BUILDINGS NUMBER OF TANKS
B-207 0
B-222N 2
B-222S 2
B-228 2
B-233 0
B-245 2
Note: Buildings serviced will be alternating annually.
ATTACHMENT 2
AFFF SAMPLE COLLECTION POINTS FOR LAB TESTING
BUILDING NUMBER OF SAMPLES
B-126 1
*B-207 1
B-222 6
B-228 3
*B-233 1
B-245 3
B-255 6
*B-276 1
B-280 3
B-282 5
TOTAL 30
Note: Buildings with asterisk (*) are also sampled semi-annually for 1% high expansion foam lab testing.
File details come from the government source that posted it. Updated .