FA445223Q0008 - QnR.pdf
PDF 53 KB Posted
- Attached to
- Carpet Removal/Replacement Federal contract opportunity
- Solicitation number
- FA445223Q0008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA445223Q0008 - QnR (rev 4-21-2023).pdf | ||
| Amendment 02.pdf | ||
| Statement of Work - Carpet Remove-Replace (rev 4-18-2023).pdf | ||
| FA445223Q0008 - QnR (rev 4-18-2023).pdf | ||
| Bldg. 730 Floor Plan.pdf | ||
| FA445223Q0008 - QnR (4-11-23).pdf | ||
| Bldg. 501 Floor Plan.pdf | ||
| Carpet.docx | DOCX document | |
| Amendment 01.pdf | ||
| Combined Synopsis Solicitation-Carpet Project (rev 4-7-2023).pdf | ||
| Statement of Work - Carpet Remove-Replace (4-7-2023).pdf | ||
| Furniture Pics.docx | DOCX document | |
| Statement of Work - Carpet Remove-Replace (4-4-2023).pdf | ||
| Combined Synopsis Solicitation-Carpet Project.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA445223Q0008
Carpet Removal and Replacement Services
Questions and Responses (4-7-2023)
Q1) What are the minimum carpet specifications? Does this fall under the Tier 1 vendor Air Force Contract ordering requirements?
R1) This RFQ carpet requirement is not utilizing the Air Force Carpet II Tier 1 or Tier 2 processes.
Although the Air Force occupies the buildings, they are actually Army/Fort Bragg owned property, subject to their procedures. The carpet tile requirement is now provided in more detail in paragraph 5 of the SOW (rev 4-7-2023). Also refer to the Carpet.docx added to the RFQ file.
Q2) The SOW states to “Replace base boards as required.” Will all cove base not be replaced? If it is to be replaced, what size cove base is required? Also, vinyl or rubber? What is the total linear footage of cove base?
R2) The base board requirement is now provided in more detail in paragraph 5 of the SOW (rev 4-7- 2023).
Q3) Will there be an area to store materials?
R3) Yes.
Q4) Will there be an area to place a dumpster for waste?
R4) Yes.
Q5) Will weekend or after-hours work be allowed?
R5) Weekend and after-hours work is not allowable.
Q6) Are there any pictures of the existing furniture that can be provided?
R6) A sample of the types of furniture that will be required to be removed/replaced for the carpet requirement is provided, refer to Furniture Pics.docx. added in the RFQ file.
Q7) On the furniture moving, can you confirm that electronics and personal items will not be required to be moved by the contractor as is typical?
R7) Confirmed, it will not be required.
Q8) Do we have to conduct a site visit to get measurements, or do you guys have those?
R8) Square footage of the carpet requirement is provided as an approximate number in the SOW for both buildings. The areas have been measured a couple of times so the estimate provided is an average of those measurements. The site visit is highly encouraged to attend so that interested contractors can take their own measurements if they wish to, as well as to see first-hand the other requirements of the SOW such as furniture removal/replacement requirements, base boards, etc.
Q9) The SOW does not describe the carpet or material in detail. If you could detail the grade, padding,
wt. amount, and color that would be helpful.
R9) Refer to R1) above.
Q10) Does this project need any bonding prior to submit this project?
R10) No.
Q11) Does site visit need to submit prior attending?
R11) Advance notification is not required to attend the site visit. However, you may contact the POC in the Combined Synopsis/Solicitation document to provide notification of attendance, and/or ask any questions specific to the site visit event.
End of Questions and Responses