Bldg. 730 Floor Plan.pdf
PDF 1 MB Posted
- Attached to
- Carpet Removal/Replacement Federal contract opportunity
- Solicitation number
- FA445223Q0008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA445223Q0008 - QnR (rev 4-21-2023).pdf | ||
| Amendment 02.pdf | ||
| Statement of Work - Carpet Remove-Replace (rev 4-18-2023).pdf | ||
| FA445223Q0008 - QnR (rev 4-18-2023).pdf | ||
| Bldg. 501 Floor Plan.pdf | ||
| FA445223Q0008 - QnR (4-11-23).pdf | ||
| Carpet.docx | DOCX document | |
| FA445223Q0008 - QnR.pdf | ||
| Amendment 01.pdf | ||
| Combined Synopsis Solicitation-Carpet Project (rev 4-7-2023).pdf | ||
| Statement of Work - Carpet Remove-Replace (4-7-2023).pdf | ||
| Furniture Pics.docx | DOCX document | |
| Statement of Work - Carpet Remove-Replace (4-4-2023).pdf | ||
| Combined Synopsis Solicitation-Carpet Project.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3 4
A-402
A-401
TYP.
9'-0"
28'-0"
RVV
W/D
W/D
W/D
W/D
V
5 5
EXAM
EXAM
FLT CMDR
EXAM
MECHANICAL
PHYSICAL THERAPY
FLT CMDR
FLT CMDR
A FLIGHT CHIEF
LOCKERS
C FLIGHT CHIEF
WEAPONS SPECIALISTS
COMM. ROOM
CONFERENCE
PROD SUPR
TECH. ADMIN.
DISPATCH
D FLIGHT CHIEF
B FLIGHT CHIEF
CLASSROOM
FLT CMDR
MAINT. SUPR.
MAINT. OIC.
MA OFC.
SQUAD HISTORY
WOMENS
INTEL
CORRIDOR
COMPOSITE
BRIEFING
STAN EVAL/SAFETY
MENS
OPS OFC.
VAULT
COMM.
ASST. OPS
RECEPTION
BRIEFING
STORAGE
FLT MGMT/
OPS ADMIN
FLT PLAN
ACPT SUPR
DEBRIEF
STORAGE
MOBIL
JANITOR
MENS
READY ROOM
SUPPORT/STORAGE
NCO SUPER OFC
VAULT
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
1ST SGT
SCREENING
EXAM
ELECTRICAL
CORRIDOR
CCQ ADJ
EXAM
EXAM
FLT CMDR
EXAM
MECHANICAL
PHYSICAL THERAPY
FLT CMDR
FLT CMDR
A FLIGHT CHIEF
LOCKERS
C FLIGHT CHIEF
WEAPONS SPECIALISTS
COMM. ROOM
CONFERENCE
PROD SUPR
TECH. ADMIN.
DISPATCH
D FLIGHT CHIEF
B FLIGHT CHIEF
CLASSROOM
FLT CMDR
MAINT. SUPR.
MAINT. OIC.
MA OFC.
SQUAD HISTORY
WOMENS
INTEL
CORRIDOR
COMPOSITE
BRIEFING
STAN EVAL/SAFETY
WAITING
MENS
OPS OFC.
VAULT
COMM.
ASST. OPS
RECEPTION
BRIEFING
STORAGE
FLT MGMT/
OPS ADMIN
FLT PLAN
ACPT SUPR
DEBRIEF
STORAGE
MOBIL
LAUNDRY
JANITOR
MENS
READY ROOM
SUPPORT/STORAGE
NCO SUPER OFC
VAULT
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
1ST SGT
SCREENING
EXAM
ELECTRICAL
CORRIDOR
CCQ ADJ
ORDERLY
D
C
A
B
S O
L I C
I T
A T
I O
N
N
O
F I L E
N
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
B
Y
M A
R K
SHEET ID
US ARMY CORPS
OF ENGINEERS
I S
S U
E
D
A T
E
S I Z
E
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E
C O
N T
R A
C T
A N
S I
D
W H
N D
W H
N F
C A
T E
G O
R Y
D
E
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
W I L M
I N
G T
D
I S
T R
I C
T
D
A R
L I N
G T
V E
W I L M
I N
G T
O N
N
C
35% DESIGN SUBMITTAL (NOT FOR CONSTRUCTION)
R E
N O
V A
E
U I L D
I N
G
P
A A
F
F O
A
G G
N
O R
H
R
O L I N
A
Z A
P A
T A
N
T R
A C
T O
R S
L L C
L Y
R
E E
T
N O
T A
S U
L G
A
A
L
A
F
L O
P
L A
N D
G N
F L
O O
R
P
L A
N
A-101
B F
K F
W S
GRAPHIC SCALE
1/8" = 1'-0"
8'4'0 16'
PLAN
NORTH
TRUE
NORTH
GENERAL CONSTRUCTION NOTES
CONVERT ROOMS 158 AND 159 INTO OPEN
AREA AS A PART OF PHYSICAL THERAPY 160.
INSTALL RUBBER FLOORING TO MATCH
PHYSICAL THERAPY 160 (G.F.C.I.)
WAITING ROOM FURNITURE IS N.I.C.
INSTALL UTILITY SINK (GFE). SEE PLUMBING
INSTALL ICE MACHINE (GFE). SEE PLUMBING
PROVIDE RESILIENT SHEET VINYL FLOORING IN
ROOMS 103, 122, 124, 129, 130, 131, 132, 133,
AND 157. CONTINUE RESILIENT SHEET VINYL
MATERIAL VERTICAL UP THE WALL AS A 4" WALL
BASE. PROVIDE A METAL CAP/SEAL TRIM TOP
OF THE WALL BASE. ARMSTRONG FLOORING,
COLOR ART MEDINTECH DIAMOND 10
TECHNOLOGY OR APPROVED EQUAL.
PROVIDE METAL TRANSITION STRIP WHERE
INDICATED.
ROOM NUMBER
KEY NOTE1
XXX
XXX
KEY NOTES LEGEND
CERAMIC TILE FLOORING
1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS BEFORE
BEGINNING WORK. ANY DISCREPANCY OR VARIATION WITH EXISTING
CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S
REPRESENTATIVE BEFORE CONTINUING WORK OR ORDERING MATERIALS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL FROM THE SITE AND
PROPER DISPOSAL OF ANY DEBRIS ACCUMULATED DURING DEMOLITION
AND CONSTRUCTION ON A DAILY BASIS.
3. CONTRACTOR SHALL PROTECT ADJACENT AREAS OUTSIDE OF AREA OF
WORK FROM DEMOLITION AND CONSTRUCTION ACTIVITIES.
4. PROVIDE METAL TRANSITION STRIPS AT ALL DOOR THRESHOLDS WHERE
NEW FLOORING MEETS EXISTING AND DOES NOT RECEIVE A DOOR
THRESHOLD.
5. STORED MATERIALS SHALL BE KEPT DRY AND KEPT IN AN ORDERLY
FASHION IN AN AREA DESIGNATED BY THE OWNER'S REPRESENTATIVE.
6. REFER TO PLUMBING, MECHANICAL, AND ELECTRICAL DRAWINGS AND
NARRATIVES FOR ADDITIONAL SCOPE.
SEALED CONCRETE
Scale: 1/8" = 1'-0"
FLOOR PLAN
PROVIDE WALL-MOUNTED FRAMELESS MIRROR
(1/4" TEMPERED GLASS). THE MIRROR SHALL BE
MOUNTED 20" AFF (ABOVE FINISH FLOOR) AND
EXTEND 8'-0" AFF.
PROVIDE 2-COAT EPOXY SEAL OVER CLEAN,
SMOOTH CONCRETE SLAB. TINTED, COLOR
TBD.
PROVIDE CERAMIC FLOOR (FIELD) TILE AND
GROUT TO MATCH EXISTING TILE IN SIZE, TYPE,
PROFILE, SERIES, THICKNESS, MODEL, AND
COLOR WHERE LOGO WAS REMOVED.
PROVIDE NEW 2-1/2” FURRING ON PLAN EAST
WALL IN EXAM ROOM 129, 130, 131, AND 132.
FURRING WALL TO INCLUDE BLOCKING AS
REQUIRED FOR CASEWORK, DIAGNOSTIC WALL
UNIT, PLUMBING FIXTURES, ACCESSORIES, AND
SHALL PROVIDE POWER/DATA CONNECTIONS
AS INDICATED. PREPARE WALLS FOR NEW
FINISH, INCLUDING TAPE/MUD OF EXISTING
WALLPAPER SEAMS AND DAMAGED AREAS,
PROVIDE NEW PAINT AS INDICATED.
CONTRACTOR SHALL PROVIDE BASE CABINET,
WALL CABINET, SINK, AND ACCESSORIES
INCLUDING PAPER TOWEL DISPENSER, LIQUID
SOAP DISPENSER, HAND SANITIZER
DISPENSER, AND SHARPS CONTAINER.
CASEWORK SHALL BE PROVIDED AS A
COMPLETE PRE-MANUFACTURED UNIT, MODEL
NUMBER TBD BY GOVERNMENT. INSTALL GFE
DIAGNOSTIC WALL UNIT IN EXAM ROOM 129,
130, 131, AND 132.
PROVIDE NEW S.S. PAPER TOWEL/WASTE
RECEPTACLE COMBO UNIT, BOBRICK OR
APPROVED EQUAL, TO MATCH SIZE OF
EXISTING HOLE IN CMU WALL IN LAUNDRY 154.
PROVIDE NEW 18-INCH DOUBLE DOOR
LOCKERS WITH SHELF ON TOP, BENCH
SEAT, AND DRAWER UNDER BENCH. BASIS OF
DESIGN SHALL BE SPACESAVER FREESTYLE
PERSONAL STORAGE
LOCKER, 36”WX36”DX84”H, DOUBLE DOOR PLAIN
FINISH, NO LOCK, WITH FULL-WIDTH SHELVES
AND HOOK BRACKET HANGER ASSEMBLY KIT.
(18) TOTAL.
LAUNDRY ROOM 154: PROVIDE PLUMBING,
DRYER VENTS, AND ELECTRICAL POWER FOR
(4) FOUR STACKED WASHER AND DRYERS
(GFE). SEE PLUMBING, MECHANICAL, AND
ELECTRICAL DRAWINGS.
PROVIDE NEW DOOR, DOOR FRAME, AND
HARDWARE. SEE SCHEDULES
RESILIENT SHEET VINYL
FLOORING
File details come from the government source that posted it. Updated .