Bldg. 730 Floor Plan.pdf

PDF 1 MB Posted

Attached to
Carpet Removal/Replacement Federal contract opportunity
Solicitation number
FA445223Q0008
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to Carpet Removal/Replacement, newest first.
File Type Posted
FA445223Q0008 - QnR (rev 4-21-2023).pdf PDF
Amendment 02.pdf PDF
Statement of Work - Carpet Remove-Replace (rev 4-18-2023).pdf PDF
FA445223Q0008 - QnR (rev 4-18-2023).pdf PDF
Bldg. 501 Floor Plan.pdf PDF
FA445223Q0008 - QnR (4-11-23).pdf PDF
Carpet.docx DOCX document
FA445223Q0008 - QnR.pdf PDF
Amendment 01.pdf PDF
Combined Synopsis Solicitation-Carpet Project (rev 4-7-2023).pdf PDF
Statement of Work - Carpet Remove-Replace (4-7-2023).pdf PDF
Furniture Pics.docx DOCX document
Statement of Work - Carpet Remove-Replace (4-4-2023).pdf PDF
Combined Synopsis Solicitation-Carpet Project.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 4

A-402

A-401

TYP.

9'-0"

28'-0"

RVV

W/D

W/D

W/D

W/D

V

5 5

EXAM

EXAM

FLT CMDR

EXAM

MECHANICAL

PHYSICAL THERAPY

FLT CMDR

FLT CMDR

A FLIGHT CHIEF

LOCKERS

C FLIGHT CHIEF

WEAPONS SPECIALISTS

COMM. ROOM

CONFERENCE

PROD SUPR

TECH. ADMIN.

DISPATCH

D FLIGHT CHIEF

B FLIGHT CHIEF

CLASSROOM

FLT CMDR

MAINT. SUPR.

MAINT. OIC.

MA OFC.

SQUAD HISTORY

WOMENS

INTEL

CORRIDOR

COMPOSITE

BRIEFING

STAN EVAL/SAFETY

MENS

OPS OFC.

VAULT

COMM.

ASST. OPS

RECEPTION

BRIEFING

STORAGE

FLT MGMT/

OPS ADMIN

FLT PLAN

ACPT SUPR

DEBRIEF

STORAGE

MOBIL

JANITOR

MENS

READY ROOM

SUPPORT/STORAGE

NCO SUPER OFC

VAULT

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

1ST SGT

SCREENING

EXAM

ELECTRICAL

CORRIDOR

CCQ ADJ

EXAM

EXAM

FLT CMDR

EXAM

MECHANICAL

PHYSICAL THERAPY

FLT CMDR

FLT CMDR

A FLIGHT CHIEF

LOCKERS

C FLIGHT CHIEF

WEAPONS SPECIALISTS

COMM. ROOM

CONFERENCE

PROD SUPR

TECH. ADMIN.

DISPATCH

D FLIGHT CHIEF

B FLIGHT CHIEF

CLASSROOM

FLT CMDR

MAINT. SUPR.

MAINT. OIC.

MA OFC.

SQUAD HISTORY

WOMENS

INTEL

CORRIDOR

COMPOSITE

BRIEFING

STAN EVAL/SAFETY

WAITING

MENS

OPS OFC.

VAULT

COMM.

ASST. OPS

RECEPTION

BRIEFING

STORAGE

FLT MGMT/

OPS ADMIN

FLT PLAN

ACPT SUPR

DEBRIEF

STORAGE

MOBIL

LAUNDRY

JANITOR

MENS

READY ROOM

SUPPORT/STORAGE

NCO SUPER OFC

VAULT

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

1ST SGT

SCREENING

EXAM

ELECTRICAL

CORRIDOR

CCQ ADJ

ORDERLY

D

C

A

B

S O

L I C

I T

A T

I O

N

N

O

F I L E

N

M

E

D R

A W

N

B

Y

C H

E C

K E

D

B

Y

D E

S I G

N

B

Y

M A

R K

SHEET ID

US ARMY CORPS

OF ENGINEERS

I S

S U

E

D

A T

E

S I Z

E

S U

B M

I T

T E

D

B

Y

D E

S C

R I P

T I O

N D

A T

E

C O

N T

R A

C T

A N

S I

D

W H

N D

W H

N F

C A

T E

G O

R Y

D

E

U S

A

R M

Y

C

O R

P

F

E

N G

I N

E E

R S

W I L M

I N

G T

D

I S

T R

I C

T

D

A R

L I N

G T

V E

W I L M

I N

G T

O N

N

C

35% DESIGN SUBMITTAL (NOT FOR CONSTRUCTION)

R E

N O

V A

E

U I L D

I N

G

P

A A

F

F O

A

G G

N

O R

H

R

O L I N

A

Z A

P A

T A

N

T R

A C

T O

R S

L L C

L Y

R

E E

T

N O

T A

S U

L G

A

A

L

A

F

L O

P

L A

N D

G N

F L

O O

R

P

L A

N

A-101

B F

K F

W S

GRAPHIC SCALE

1/8" = 1'-0"

8'4'0 16'

PLAN

NORTH

TRUE

NORTH

GENERAL CONSTRUCTION NOTES

CONVERT ROOMS 158 AND 159 INTO OPEN

AREA AS A PART OF PHYSICAL THERAPY 160.

INSTALL RUBBER FLOORING TO MATCH

PHYSICAL THERAPY 160 (G.F.C.I.)

WAITING ROOM FURNITURE IS N.I.C.

INSTALL UTILITY SINK (GFE). SEE PLUMBING

INSTALL ICE MACHINE (GFE). SEE PLUMBING

PROVIDE RESILIENT SHEET VINYL FLOORING IN

ROOMS 103, 122, 124, 129, 130, 131, 132, 133,

AND 157. CONTINUE RESILIENT SHEET VINYL

MATERIAL VERTICAL UP THE WALL AS A 4" WALL

BASE. PROVIDE A METAL CAP/SEAL TRIM TOP

OF THE WALL BASE. ARMSTRONG FLOORING,

COLOR ART MEDINTECH DIAMOND 10

TECHNOLOGY OR APPROVED EQUAL.

PROVIDE METAL TRANSITION STRIP WHERE

INDICATED.

ROOM NUMBER

KEY NOTE1

XXX

XXX

KEY NOTES LEGEND

CERAMIC TILE FLOORING

1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS BEFORE

BEGINNING WORK. ANY DISCREPANCY OR VARIATION WITH EXISTING

CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S

REPRESENTATIVE BEFORE CONTINUING WORK OR ORDERING MATERIALS.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL FROM THE SITE AND

PROPER DISPOSAL OF ANY DEBRIS ACCUMULATED DURING DEMOLITION

AND CONSTRUCTION ON A DAILY BASIS.

3. CONTRACTOR SHALL PROTECT ADJACENT AREAS OUTSIDE OF AREA OF

WORK FROM DEMOLITION AND CONSTRUCTION ACTIVITIES.

4. PROVIDE METAL TRANSITION STRIPS AT ALL DOOR THRESHOLDS WHERE

NEW FLOORING MEETS EXISTING AND DOES NOT RECEIVE A DOOR

THRESHOLD.

5. STORED MATERIALS SHALL BE KEPT DRY AND KEPT IN AN ORDERLY

FASHION IN AN AREA DESIGNATED BY THE OWNER'S REPRESENTATIVE.

6. REFER TO PLUMBING, MECHANICAL, AND ELECTRICAL DRAWINGS AND

NARRATIVES FOR ADDITIONAL SCOPE.

SEALED CONCRETE

Scale: 1/8" = 1'-0"

FLOOR PLAN

PROVIDE WALL-MOUNTED FRAMELESS MIRROR

(1/4" TEMPERED GLASS). THE MIRROR SHALL BE

MOUNTED 20" AFF (ABOVE FINISH FLOOR) AND

EXTEND 8'-0" AFF.

PROVIDE 2-COAT EPOXY SEAL OVER CLEAN,

SMOOTH CONCRETE SLAB. TINTED, COLOR

TBD.

PROVIDE CERAMIC FLOOR (FIELD) TILE AND

GROUT TO MATCH EXISTING TILE IN SIZE, TYPE,

PROFILE, SERIES, THICKNESS, MODEL, AND

COLOR WHERE LOGO WAS REMOVED.

PROVIDE NEW 2-1/2” FURRING ON PLAN EAST

WALL IN EXAM ROOM 129, 130, 131, AND 132.

FURRING WALL TO INCLUDE BLOCKING AS

REQUIRED FOR CASEWORK, DIAGNOSTIC WALL

UNIT, PLUMBING FIXTURES, ACCESSORIES, AND

SHALL PROVIDE POWER/DATA CONNECTIONS

AS INDICATED. PREPARE WALLS FOR NEW

FINISH, INCLUDING TAPE/MUD OF EXISTING

WALLPAPER SEAMS AND DAMAGED AREAS,

PROVIDE NEW PAINT AS INDICATED.

CONTRACTOR SHALL PROVIDE BASE CABINET,

WALL CABINET, SINK, AND ACCESSORIES

INCLUDING PAPER TOWEL DISPENSER, LIQUID

SOAP DISPENSER, HAND SANITIZER

DISPENSER, AND SHARPS CONTAINER.

CASEWORK SHALL BE PROVIDED AS A

COMPLETE PRE-MANUFACTURED UNIT, MODEL

NUMBER TBD BY GOVERNMENT. INSTALL GFE

DIAGNOSTIC WALL UNIT IN EXAM ROOM 129,

130, 131, AND 132.

PROVIDE NEW S.S. PAPER TOWEL/WASTE

RECEPTACLE COMBO UNIT, BOBRICK OR

APPROVED EQUAL, TO MATCH SIZE OF

EXISTING HOLE IN CMU WALL IN LAUNDRY 154.

PROVIDE NEW 18-INCH DOUBLE DOOR

LOCKERS WITH SHELF ON TOP, BENCH

SEAT, AND DRAWER UNDER BENCH. BASIS OF

DESIGN SHALL BE SPACESAVER FREESTYLE

PERSONAL STORAGE

LOCKER, 36”WX36”DX84”H, DOUBLE DOOR PLAIN

FINISH, NO LOCK, WITH FULL-WIDTH SHELVES

AND HOOK BRACKET HANGER ASSEMBLY KIT.

(18) TOTAL.

LAUNDRY ROOM 154: PROVIDE PLUMBING,

DRYER VENTS, AND ELECTRICAL POWER FOR

(4) FOUR STACKED WASHER AND DRYERS

(GFE). SEE PLUMBING, MECHANICAL, AND

ELECTRICAL DRAWINGS.

PROVIDE NEW DOOR, DOOR FRAME, AND

HARDWARE. SEE SCHEDULES

RESILIENT SHEET VINYL

FLOORING

File details come from the government source that posted it. Updated .