Modification_Doc.doc
DOC document 112 KB Posted
- Attached to
- AFICA MPN-25 & FPN-68 Radar Support Federal contract opportunity
- Solicitation number
- FA4452-15-R-0010
About this file
Modification Document - This copy details on the Amendment 1 changes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Redacted_JA_-_MPN25__FPN68.pdf | ||
| Modification_Doc_Amend_2.pdf | ||
| Conformed_Copy_Amend_2.pdf | ||
| Conformed_Copy.doc | DOC document | |
| Attachment_3_-_CDRLS.pdf | ||
| Released_Solicitation.pdf | ||
| Attachment_1_-_SGFP.pdf | ||
| Attachment_4_-_QASP.pdf | ||
| Attachment_1_-_GFP_Listing.pdf | ||
| Draft_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 13-Jul-2015 02:00 PM to 23-Jul-2015 02:00 PM.
The depository location Buld P40 Rm W202, Scott AFB has been added.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0019
The CLIN type priced has been deleted.
The CLIN description has changed from Firm FPN-68 Spares Requirement to Data Deliverables - NSP.
The CLIN extended description has changed from This is a one time purchase of spare parts for the FPN-68 Radar System. As referenced in Attachment 2, List 2: Parts Procurement for FPN-68 in Section J of this solicitation, the listing of spare parts to be procured has been incorporated into this solicitation. Spares shall be delivered by 12 July 2016.The packaging. handling, transportation and shipment of the spares shall be handled by industry best commercial practices. All shipments shall be traceable during transportation/shipment. The contractor shall provide tracking information within one business day from each shipment of the spares shipped commercially. Containers for shipped items shall be labeled with the nomenclature, part number, serial number, national stock number (if available), quantity and contract number. Additionally, the contractor shall ensure that all components, devices, and modules sensitive to electrostatic discharge are handled, packaged, and properly labeled to prevent damage. to Data Deliverables as outlined by the Contract Data Requirements List (CDRL) are not seperately priced (NSP). Period of Performance 13 September 2015 to 12 September 2016..
The pricing detail quantity 1.00 has been deleted.
The cost constraint NSP has been added.
The FOB Destination has been deleted.
CLIN 0020 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Firm FPN-68 Spares Requirement
FFP
This is a one time purchase of spare parts for the FPN-68 Radar System. As referenced in Attachment 2, List 2: Parts Procurement for FPN-68 in Section J of this solicitation, the listing of spare parts to be procured has been incorporated into this solicitation. Spares shall be delivered by 12 July 2016.
The packaging. handling, transportation and shipment of the spares shall be handled by industry best commercial practices. All shipments shall be traceable during transportation/shipment. The contractor shall provide tracking information within one business day from each shipment of the spares shipped commercially. Containers for shipped items shall be labeled with the nomenclature, part number, serial number, national stock number (if available), quantity and contract number. Additionally, the contractor shall ensure that all components, devices, and modules sensitive to electrostatic discharge are handled, packaged, and properly labeled to prevent damage.
FOB: Destination
SIGNAL CODE: A
NET AMT
CLIN 1019 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Data Deliverables - NSP |
FFP
Data Deliverables as outlined by the Contract Data Requirements List (CDRL) are not seperately priced (NSP). Period of Performance 13 September 2016 to 12 September 2017.
NET AMT
CLIN 2019 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Data Deliverables - NSP |
FFP
Data Deliverables, as outlined by the Contract Data Requirements List (CDRL), are not seperately priced (NSP). Period of Performance 13 September 2017 to 12 September 2018.
NET AMT
CLIN 3019 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Data Deliverables - NSP |
FFP
Data Deliverables, as outlined by the Contract Data Requirements List (CDRL), are not seperately priced (NSP). Period of Performance 13 September 2018 to 12 September 2019.
NET AMT
CLIN 4019 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Data Deliverables - NSP |
FFP
Data Deliverables, as outlined by the Contract Data Requirements List (CDRL), are not seperately priced (NSP). Period of Performance 13 September 2019 to 12 September 2020.
NET AMT
SECTION E - INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0020:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| Destination |
| Government |
| Destination |
| Government |
The following Acceptance/Inspection Schedule was added for CLIN 1019:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| Destination |
| Government |
| Destination |
| Government |
The following Acceptance/Inspection Schedule was added for CLIN 2019:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| Destination |
| Government |
| Destination |
| Government |
The following Acceptance/Inspection Schedule was added for CLIN 3019:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| Destination |
| Government |
| Destination |
| Government |
The following Acceptance/Inspection Schedule was added for CLIN 4019:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| Destination |
| Government |
| Destination |
| Government |
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule Item has been deleted from CLIN 0006:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2015 TO
12-SEP-2016
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 0007:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2015 TO
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 0008:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2015 TO
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 0019:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2015 TO
12-JUL-2016
| N/A |
| HQ AMC/A3AR |
TIGUE, JOHN
402 SCOTT DRIVE
SCOTT AFB IL 62225
618-229-3325
F3SF38
The following Delivery Schedule item has been added to CLIN 0020:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2015 TO
12-JUL-2016
| N/A |
| HQ AMC/A3AR |
TIGUE, JOHN
402 SCOTT DRIVE
SCOTT AFB IL 62225
618-229-3325
F3SF38
The following Delivery Schedule Item has been deleted from CLIN 1006:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2016 TO
12-SEP-2017
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 1007:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2016 TO
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 1008:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2016 TO
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 2006:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2017 TO
12-SEP-2018
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 2007:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2017 TO
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 2008:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2017 TO
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 3006:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2018 TO
12-SEP-2019
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 3007:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2018 TO
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 3008:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2018 TO
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 4006:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2019 TO
12-SEP-2020
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 4007:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2019 TO
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 4008:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 13-SEP-2019 TO
| N/A |
| N/A |
(End of Summary of Changes)
File details come from the government source that posted it. Updated .