Questions_and_Answers_Nov_14.pdf
PDF 73 KB Posted
- Attached to
- C-5M Fleet Restoration Federal contract opportunity
- Solicitation number
- FA4452-14-R-0007
About this file
Q A_Nov14
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0001.doc | DOC document | |
| Solicitation_Q_and_A_7_Feb_14.docx | DOCX document | |
| Solicitation_Q_and_A_3_Feb_14.docx | DOCX document | |
| Past_Performance_Questionnaire_C5.docx | DOCX document | |
| REFURB_BINDER_(B-Model_Ed)-Reduced.pdf | ||
| C-5M_Fleet_Restoration_RFP.pdf | ||
| C-5M_SOW_8_Jan_14.pdf | ||
| JEDMICS_C-5B_TO_C-5M.docx | DOCX document | |
| JEDMICS_C-5C_TO_C-5M.docx | DOCX document | |
| REFURB_BINDER_(C-Model_Ed)_Reduced.pdf | ||
| JEDMICS_C-5C_TO_C-5M.docx | DOCX document | |
| JEDMICS_C-5B_TO_C-5M.docx | DOCX document | |
| Questions_and_Answers_9_Jan_14.pdf | ||
| REFURB_BINDER_(B-Model_Ed)-Reduced.pdf | ||
| REFURB_BINDER_(C-Model_Ed)_Reduced.pdf | ||
| C-5M_SOW_Draft.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers For
C-5M Fleet Restoration
November 14, 2013
Q: Will there be any pre-bid visits allowed?
A: No pre-bid visits will occur.
Q: Will photos be provided?
A: No photos will be provided, but blueprints (or equivalent) will be made available.
Q: If work is to be conducted at two of the four locations, does that mean simultaneously (such that the contractor would have to deploy two teams) or will it be on a one at a time basis?
A: In some instances, work may need to be accomplished at two locations simultaneously. In other instances, work may be accomplished at one location.
However, in no instance will work be accomplished at more than two places simultaneously. Each situation depends on Phase I, which involves another contractor's unpredictable schedule.
Q: Can you clarify the time frame? How long to complete the project for all 37 aircraft?
A: C-5M aircraft availability for restorations is dependent on another contractors unpredictable schedule. Given this, the time to complete all remaining aircraft is unknown. However, this will be a five-year contract (1 base year and four optional years). Therefore, the awardee will have up to five years to complete the project.
Q: Can Government provide Dover’s Aqua Miser?
A: No, Government cannot provide an Aqua Miser, as the Dover Aqua Miser is not complete and is not usable yet.