Attachment 4 AF Form 66 Submittal Register dated 28 October 2016 for solicitation FA4418-17-R-0016, Repair Aircraft Maintenance Facility, Bldg 543
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL REGISTER (AF Form 66)
100% SUBMITTAL
REPAIR AIRCRAFT
MAINTENANCE FACILITY,
BLDG 543
AT
JOINT BASE CHARLESTON
AIR BASE WING, SOUTH CAROLINA
PROJECT No.: DKFX 11-1166
SUBMITTAL DATE: 28 OCTOBER 2016
ARCHITECTURE / PLANNING / INTERIOR DESIGN
493 King Street, Suite 100 Charleston, South Carolina 29403
Telephone: 843.577.6377 / Fax: 843.722.1768 Internet: www.glickboehmarchitecture.com
GBA Project No.: 1509
Attachement 4 Repair Aircraft Maintenance Facility, Bldg 543 FA4418-17-R-0016
Project Design Team
Architect: Glick/Boehm & Associates, Inc.
493 King Street, Suite 100 Charleston, South Carolina 29403 (843)577.6377
Mechanical / Plumbing / DWG Consulting Engineers, Inc.
Electrical Consultant/ 1009 Anna Knapp Blvd., Suite 202 Fire Protection: Mt. Pleasant, South Carolina 29464 (843)849.1141
Environmental: S&ME, Inc.
620 Wando Park Blvd.
Mt. Pleasant, South Carolina 29464 843.884.0005
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 41 PAGES
Repair Aircraft Maintenance Facility Building 543
01 11 00 SD-01 Preconstruction Submittals GUtility Outage GRoad Closure Requests GAir Force Work Clearance Permit GContractor's Proposed Laydown
Area Plan 01 14 00 SD-01 Preconstruction Submittals
1.2.1.1 GList of Contact Personnel
01 30 00 SD-01 Preconstruction Submittals
1.3 GView Location Map
1.4 GProgress and Completion
Pictures GResume for Superintendent
SD-04 Samples
1.2 GColor Boards
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GQualifications
1.3.1 GBaseline Project Schedule
1.4.1 GInitial Contract Progress Report
(AF IMT 3065)
1.4.2 GInitial Contract Progress
Schedule (AF IMT 3064) SD-07 Certificates
GMonthly Project Schedule Update GBi-Weekly Contract Progress
Reports (AF IMT 3065)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 41 PAGES
01 32 16.00 20 1.4.2 GMonthly Contract Progress Schedule (AF IMT 3064)
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal register
01 35 26 SD-01 Preconstruction Submittals
1.6 GAccident Prevention Plan (APP)
1.7 GActivity Hazard Analysis (AHA)
1.6.1 GCrane Critical Lift Plan
1.5.1.2 GCrane Operators
SD-06 Test Reports 1.11Notifications and Reports
1.11.2 GAccident Reports
1.11.3Crane Reports
SD-07 Certificates
1.8 GConfined Space Entry Permit
1.8 GHot work permit
License Certificates 01 35 40.00 20 SD-01 Preconstruction Submittals
1.8 GEnvironmental Protection Plan
1.9.1Instructor Qualifications
SD-06 Test Reports 3.2Field Quality Control Reports
SD-07 Certificates 1.6Environmental Regulatory
Requirements SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 41 PAGES
01 35 40.00 20 1.7.1Material Safety Data Sheets SD-11 Closeout Submittals
1.9.3Training Program 3.1Protection of Natural Resources
01 45 00 SD-01 Preconstruction Submittals
1.6.1 GConstruction Quality Control (QC)
Plan 01 45 35 SD-01 Preconstruction Submittals
GSIOR Letter of Acceptance GProject Manual
Written Practices NDT Procedures and Equipment Calibration Records
SD-06 Test Reports 3.1.2Daily Reports 3.1.2Daily Reports 3.1.1Biweekly Reports
SD-07 Certificates Fabrication Plant Steel Truss Plant Wood Truss Plant AC472 Accreditation Steel Joist Institute Membership Certified Plant
2.1Certificate of Compliance GSpecial Inspector of Record
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 41 PAGES
01 45 35 1.5 GSpecial Inspector Qualification Records
SD-11 Closeout Submittals 3.1.2Interim Final Report
3.1.2 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
01 50 10 SD-01 Preconstruction Submittals
1.4.1 GMaterial Safety Data Sheet
(MSDS)
SD-06 Test Reports
1.8 GMonthly Green Procurement
Report
1.8 GAnnual Green Procurement
Report
1.3 GMonthly Recycling Report
GAnnual Recycling Report
01 54 00 SD-03 Product Data Affirmative Procurement Reporting Form
Proposed environmentally preferred products.
01 57 20 SD-01 Preconstruction Submittals GConstruction Waste Management
Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 41 PAGES
01 57 50 SD-01 Preconstruction Submittals
1.7.1 GPreconstruction Survey
1.7.6 GRegulatory Notifications
1.5 GEnvironmental Protection Plan
1.6 GDirt and Dust Control Plan
SD-06 Test Reports 3.9.2Disposal Requirements 1.7.7Erosion and Sediment Control
Inspection Reports 3.4Erosion and Sediment Control
Inspection Reports Storm Water Inspection Reports for General Permit
1.7.8 GSolid Waste Disposal Report
SD-07 Certificates
1.7.5 GContractor 40 CFR employee
training records
SD-11 Closeout Submittals
3.4.2 GStorm Water Pollution Prevention
Plan compliance notebook 1.7.3Waste Determination
Documentation 1.7.4Disposal Documentation for
Hazardous and Regulated Waste 1.7.5Contractor 40 CFR Employee
Training Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 41 PAGES
01 57 50 1.7.2Solid Waste Disposal Permit 1.7.8Solid Waste Disposal Report
Hazardous Waste/Debris Management
01 58 00 SD-02 Shop Drawings GPreliminary one line Gpreliminary drawing indicating layout and text content GSign Legend Orders
SD-04 Samples GFinal rendering GFinal framed rendering
01 78 00 SD-03 Product Data
1.4.1 GWarranty Management Plan
1.4.4Warranty Tags
1.3 GSpare Parts Data
SD-08 Manufacturer’s Instructions 1.4.1Instructions
SD-10 Operation and Maintenance Data
3.7 GOperation and Maintenance
Manuals
Condition Monitoring (Predictive Testing
Inspection Posted Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 41 PAGES
01 78 00 SD-11 Closeout Submittals
3.1 GAs-Built Drawings
GRecord Drawings As-Built Record of Equipment and Materials
Final Approved Shop Drawings Construction Contract Specifications
GInterim DD Form 1354 GChecklist for DD Form 1354
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
GDeconstruction Plan 1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals 3.2.4Receipts
06 41 16.00 10 SD-02 Shop Drawings 1.4.2Shop Drawings 2.10Shop Drawings
; G 3.1Installation
SD-03 Product Data 2.1Wood Materials
Wood Finishes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 41 PAGES
06 41 16.00 10 2.10.7.3Finish Schedule Certification
SD-04 Samples 2.3Plastic Laminates
; G 2.6Cabinet Hardware
SD-07 Certificates 1.4Quality Assurance 3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
1.4.2 GDetail Drawings
3.1 GInstallation
SD-03 Product Data 2.1Solid polymer material 1.4.1Qualifications 2.3Fabrications
SD-04 Samples
2.1 GMaterial
2.3.4 GCountertops
SD-06 Test Reports 2.1Solid polymer material
SD-07 Certificates 2.3Fabrications 1.4.1Qualifications
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 41 PAGES
06 61 16 3.2Clean-up SD-11 Closeout Submittals LEED Documentation
07 41 13 SD-02 Shop Drawings
1.4.5 GRoofing Panels
1.4.5 GFlashing and Accessories
1.4.5 GGutter/Downspout Assembly
SD-03 Product Data
2.1 GRoof panels
2.4 GAccessories
1.4.5 GFasteners
1.4.5 GPressure Sensitive Tape
2.6 GUnderlayments
2.7 GGaskets and Sealing/Insulating
Compounds
1.4.5 GAluminized Steel Repair Paint
1.4.5 GEnamel Repair Paint
SD-04 Samples
2.1 GRoof Panels
1.4.5 GFactory-applied Color Finish
2.4 GAccessories
1.4.5 GFasteners
1.4.5 GGaskets and Sealant/Insulating
Compounds SD-05 Design Data
1.2.1.2 GWind Uplift Resistance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 41 PAGES
07 41 13 SD-06 Test Reports
1.2.1.1 GLeakage Test Report
1.2.1.2 GWind Uplift Test Report
2.2 GFactory Finish and Color
Performance Requirements SD-07 Certificates
2.1 GRoof Panels
1.4.1 GQualification of Manufacturer
1.4.2 GQualification of Applicator
SD-08 Manufacturer’s Instructions
1.4.5 GINSTALLATION MANUAL
SD-09 Manufacturer’s Field Reports
3.9.1 GManufacturer's Field Inspection
Reports
SD-11 Closeout Submittals
1.8 GWarranties
3.10 GInformation Card
GDate Of Installation Wall-Mounted Placard
07 60 00 SD-02 Shop Drawings
3.1.25 GCovering on flat, sloped, or
curved surfaces
3.1.17 GGutters
3.1.18 GDownspouts
3.1.15 GGravel stops and fascias
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 41 PAGES
07 60 00 3.1.22 GSplash pans
3.1.11 GBase flashing
3.1.12 GCounterflashing
3.1.27 GFlashing at roof penetrations
3.1.13 GReglets
3.1.16 GDrip edge
3.1.24 GEave flashing
SD-11 Closeout Submittals 3.5Quality Control Plan
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates 3.3.6Sealant
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.4 GFrames
2.4 GFrames
2.2Accessories
SD-03 Product Data
2.1 GDoors
2.4 GFrames
2.2 GAccessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 41 PAGES
08 14 00 SD-02 Shop Drawings
2.2 GDoors
SD-03 Product Data
2.2 GDoors
2.3Accessories 2.4.6Water-resistant Sealer 1.5Warranty
SD-04 Samples 2.2Doors
2.4.5.2 GDoor Finish Colors
SD-06 Test Reports 2.5Cycle-Slam 2.5Hinge Loading Resistance
SD-07 Certificates Certificates of Grade
SD-11 Closeout Submittals 1.5Warranty
08 34 16.20 SD-01 Preconstruction Submittals
1.4.1 GManufacturer's Qualifications
1.4.2 GInstaller's Qualifications
SD-02 Shop Drawings
1.3.1 GDoor Design
SD-03 Product Data
2.3 GElectric Operator
2.3.5 GMotors
2.2 GDoors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 41 PAGES
08 34 16.20 2.3.6 GControls
2.1.7 GDoor Fabric
2.3.6.1 GSurge Protection Device (SPD)
SD-05 Design Data
1.3.2.1 GCalculations
1.3.4 GLoad Diagrams
SD-06 Test Reports
2.3.3 GSafety Arrester Operation Test
2.1.7 GDoor Fabric
2.1.7 GDoor Fabric
SD-07 Certificates
1.4.1 GManufacturer's Qualifications
1.4.2 GInstallers Qualifications
1.5 GWelding Procedures and
Qualifications SD-09 Manufacturer’s Field Reports
3.3 GAcceptance Testing Procedure
SD-10 Operation and Maintenance Data
2.8.1 GDoor Operation
1.4.3.1 GEmergency and Routine
Preventative Maintenance Plan SD-11 Closeout Submittals
3.3 GAcceptance Testing Procedure
1.4.3 GWarranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 41 PAGES
08 41 13 SD-01 Preconstruction Submittals
1.2.1 GSample Warranty
1.2.1 GListing of Product Installations
SD-02 Shop Drawings
1.2.1 GInstallation Drawings
1.2.1 GFabrication Drawings
SD-03 Product Data
1.2.1 GManufacturer's Catalog Data
SD-04 Samples
1.2.1 GFinish and Color Samples
SD-06 Test Reports
1.2.1 GCertified Test Reports
SD-07 Certificates
3.4 GManufacturer's Product Warranty
08 43 13 SD-01 Preconstruction Submittals
1.2.1 GSample Warranty
1.2.1 GListing of Product Installations
SD-02 Shop Drawings
1.2.1 GInstallation Drawings
1.2.1 GFabrication Drawings
SD-03 Product Data
1.2.1 GManufacturer's Catalog Data
SD-04 Samples
1.2.1 GFinish and Color Samples
SD-06 Test Reports
1.2.1 GCertified Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 41 PAGES
08 43 13 SD-07 Certificates
3.4 GManufacturer's Product Warranty
08 71 00 SD-02 Shop Drawings
1.3 GHardware schedule
2.3.5Keying system
SD-03 Product Data
2.3 GHardware items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.3 GHardware Schedule
SD-11 Closeout Submittals
1.4Key Bitting 08 81 00 SD-02 Shop Drawings
Installation SD-03 Product Data
1.6.1Insulating Glass 1.3Glazing Accessories
SD-04 Samples 1.6.1Insulating Glass
Impact Rated Glass Safety Glass Glazing Compound
2.3.3Tape 2.3.1.1Sealant
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 41 PAGES
08 81 00 SD-07 Certificates 1.6.1Insulating Glass
Impact Rated Glass Safety Glass Mirror
SD-08 Manufacturer’s Instructions 2.3Setting and sealing materials 3.2Glass setting
08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers
SD-03 Product Data 2.2Metal Wall Louvers
SD-04 Samples
1.4 GWall louvers
1.5 GWall louvers
09 22 00 SD-02 Shop Drawings
2.1 GMetal support systems
09 29 00 SD-03 Product Data 2.1.5Cementitious backer units 2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board 2.1.2Water-Resistant Gypsum
Backing Board 2.1.4Glass Mat Covered or Reinforced
Gypsum Sheathing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 41 PAGES
09 29 00 2.1.4.1Glass Mat Covered or Reinforced Gypsum Sheathing Sealant
Impact Resistant Gypsum Board 2.1.10Accessories
SD-07 Certificates
2.1 GAsbestos Free Materials
SD-08 Manufacturer’s Instructions Material Safety Data Sheets
SD-10 Operation and Maintenance Data Manufacturer maintenance instructions
3.7Waste Management 09 30 00 SD-02 Shop Drawings
1.3 GDetail Drawings
SD-03 Product Data
GTile
2.3 GSetting-Bed
2.5 GMortar, Grout, and Adhesive
SD-04 Samples GTile GAccessories
2.5 GGrout
SD-07 Certificates
GTile
2.5 GMortar, Grout, and Adhesive
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 41 PAGES
09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings
SD-03 Product Data Acoustical Ceiling Systems
SD-04 Samples 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
SD-07 Certificates 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
09 65 00 SD-02 Shop Drawings
2.8 GResilient Flooring and
Accessories SD-03 Product Data
2.8 GResilient Flooring and
Accessories
2.4Adhesives SD-04 Samples
2.8 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 41 PAGES
09 65 00 SD-10 Operation and Maintenance Data
2.8 GResilient Flooring and
Accessories
SD-11 Closeout Submittals LEED Documentation
09 68 00 SD-02 Shop Drawings
3.4 GInstallation
2.6 GMoldings
SD-03 Product Data
2.1 GCarpet
3.1 GSurface Preparation
3.4 GInstallation
SD-04 Samples
2.1 GCarpet
2.6 GMoldings
SD-06 Test Reports
3.2 GMoisture and Alkalinity Tests
SD-07 Certificates
2.1 GCarpet
1.4 GRegulatory Requirements
SD-10 Operation and Maintenance Data
2.1 GCarpet
3.5 GCleaning and Protection
Maintenance Service
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 41 PAGES
09 90 00 SD-02 Shop Drawings 3.10Piping identification 3.10stencil
SD-03 Product Data
2.1 GCoating
2.1Manufacturer's Technical Data
Sheets Sealant
SD-04 Samples
1.9 GColor
SD-07 Certificates 1.3Applicator's qualifications
1.4.1.2 GQualification Testing
SD-08 Manufacturer’s Instructions Application instructions
3.6.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1 GCoatings:
10 21 13 SD-02 Shop Drawings
1.2Fabrication Drawings
3.1 GInstallation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 41 PAGES
10 21 13 1.2Cleaning and Maintenance Instructions
2.1.1Anchoring Devices and Fasteners
2.1.3Hardware and Fittings Brackets
2.1.4Door Hardware 2.4Pilaster Shoes
SD-04 Samples
2.6 GColors and Finishes
2.1.3Hardware and Fittings 2.1.1Anchoring Devices and
Fasteners SD-07 Certificates
1.6Warranty 10 28 13 SD-03 Product Data
2.1.2 GFinishes
2.2 GAccessory Items
SD-04 Samples
2.1.2 GFinishes
2.2 GAccessory Items
SD-07 Certificates 2.2Accessory Items
12 21 00 SD-02 Shop Drawings 3.3Installation
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 41 PAGES
12 21 00 2.1 GWindow Blinds 3.3Installation
SD-04 Samples
2.1 GWindow Blinds
SD-06 Test Reports 2.1Window Blinds
SD-08 Manufacturer’s Instructions
2.1 GWindow Blinds
SD-10 Operation and Maintenance Data
2.1 GWindow Blinds
21 13 00.00 40 SD-01 Preconstruction Submittals
1.2 GRecord of Existing Conditions
SD-02 Shop Drawings
2.2.3 GSupporting Elements
2.2.4 GFire-Department Connections
2.2.7.1 GFire Alarm System
2.2.6 GSprinkler Heads
2.2.7 GValves
SD-03 Product Data
2.2.1 GUnderground Piping Materials
2.2.2 GAboveground Piping Materials
2.2.7 GValves
2.2.4 GFire-Department Connections
2.2.5 GRiser Alarm Equipment
2.2.6 GSprinkler Heads
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 41 PAGES
21 13 00.00 40 2.3 GMaterials
2.2.3 GSupporting Elements
2.1 GEquipment and Performance
Data SD-05 Design Data
Part 2 GDesign Analysis and Calculations SD-06 Test Reports
3.3.6 GPressure Tests
3.3.3 GSystem Operating Tests
3.3.3 GAir Tests
3.3.3 GValve-Operating Tests
3.3.3 GDrainage Tests
22 00 00 SD-03 Product Data
2.4 GFixtures
2.4.1 GFlush Valve Water Closets
2.4.2 GFlush Valve Urinals
2.4.3 GFlush Valve Urinals
2.4.4 GWall Hung Lavatories
2.4.5 GCountertop Lavatories
2.4.6 GKitchen Sinks
2.4.7 GService Sinks
2.4.8 GDrinking-Water Coolers
2.4.9 GDrinking-Water Coolers
GPlastic Shower Stalls
2.5 GFloor and Shower Drains
2.6 GWater Heaters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 41 PAGES
22 00 00 GShower Faucets
3.4 GVibration-Absorbing Features
2.7.1 GAir Compressors
2.8 GWater Service Meter
SD-06 Test Reports
3.9 GTests, Flushing And Disinfection
SD-07 Certificates 1.3Materials and Equipment
SD-10 Operation and Maintenance Data
3.9.1 GPlumbing System
23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data
2.10 GSteam-Generating Units
2.9.1.3Insulated Nonmetallic Flexible
Duct Runouts 2.9.1.3Duct Connectors
2.9.2 GDuct Access Doors
2.9.3 GFire Dampers
2.9.4 GManual Balancing Dampers
2.9.10Air Vents, Penthouses, and
Goosenecks
2.11.1.1 GCentrifugal Fans
2.11.1.2 GIn-Line Centrifugal Fans
2.11.1.4 GCeiling Exhaust Fans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 41 PAGES
23 00 00 2.12Air Handling Units G Double Wall Ductwork Bi-Polar Ionization Generator
2.13.1.1 GVariable Volume, Single Duct
Terminal Units
2.13.1.2 GReheat Units
1.4.6Test Procedures
1.2.1.2 GDiagrams
2.9.8.1 GDiffusers
2.9.8.2 GRegisters And Grilles
2.9.9 GLouvers
SD-06 Test Reports
3.13 GPerformance Tests
3.11 GDamper Acceptance Test
SD-08 Manufacturer’s Instructions 3.3Manufacturer's Installation
Instructions 3.15.2Operation and Maintenance
Training SD-10 Operation and Maintenance Data
3.15.1 GOperation and Maintenance
Manuals
2.9.3 GFire Dampers
2.11.1.1 GCentrifugal Fans
2.11.1.2 GIn-Line Centrifugal Fans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 41 PAGES
23 00 00 2.11.1.4 GCeiling Exhaust Fans
2.12 GAir Handling Units
2.13.1.1 GVariable Volume, Single Duct
Terminal Units
2.13.1.2 GReheat Units
23 05 15 SD-01 Preconstruction Submittals
1.2 GMaterial, Equipment, and Fixture
Lists SD-02 Shop Drawings
1.2 GRecord Drawings
1.2 GCoordination Drawings
SD-03 Product Data
2.2 GPipe and Fittings
2.3 GPiping Specialties
2.4 GValves
2.5 GMiscellaneous Materials
2.6 GSupporting Elements
1.2 GEquipment Foundation Data
SD-04 Samples
1.2 GManufacturer's Standard Color
Charts SD-05 Design Data
2.2 GPipe and Fittings
2.3 GPiping Specialties
2.4 GValves
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 41 PAGES
23 05 15 3.1 GHydrostatic Tests
3.1 GAir Tests
3.1 GValve-Operating Tests
3.1 GSystem Operation Tests
SD-07 Certificates
1.4.2 GRecord of Satisfactory Field
Operation
1.2 GRecords of Existing Conditions
SD-10 Operation and Maintenance Data
3.12 GOperation and Maintenance
Manuals
23 05 48.00 40 SD-02 Shop Drawings
1.2 GInstallation Drawings
1.2 GOutline Drawings
SD-03 Product Data
1.2 GEquipment and Performance
Data
2.2.7 GIsolators
SD-06 Test Reports
2.4 GType of Isolator
2.4 GType of Base
2.4 GAllowable Deflection
2.4 GMeasured Deflection
23 05 93 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 41 PAGES
23 05 93 1.3.3 GTAB Schematic Drawings and Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data GTAB Related HVAC Submittals
SD-06 Test Reports
3.3.5 GCompleted Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications GDALT and TAB Submittal and
Work Schedule GTAB Pre-Field Engineering
Report 23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 41 PAGES
23 07 00 3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-04 Samples
2.2.1.3 GThermal Insulation
3.1.1 GDisplay Samples
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
23 11 25 SD-02 Shop Drawings
1.5.2 GGas Piping System
2.2 GGas Piping System
3.2 GGas Piping System
SD-03 Product Data
1.6.1 GPipe and Fittings
1.5.2 GGas Equipment Connectors
1.5.2 GGas Piping System
2.2 GGas Piping System
3.2 GGas Piping System
2.1 GPipe Coating Materials
2.5 GPressure Regulators
GRisers GTransition Fittings
2.3 GValves
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 41 PAGES
23 11 25 3.16 GTesting
3.16.1 GPressure Tests
SD-07 Certificates
1.5.1 GWelders Procedures and
Qualifications SD-10 Operation and Maintenance Data
1.3.1 GGas Facility System and
Equipment Operation
1.3.2 GGas Facility System Maintenance
1.3.3 GGas Facility Equipment
Maintenance 23 64 10 SD-03 Product Data
GWater Chiller 3.7Posted Instructions 1.5.1Verification of Dimensions 1.7Manufacturer's Multi-Year
Compressor Warranty 2.8Factory Tests 3.6System Performance Tests 3.7Demonstrations
SD-06 Test Reports 3.5Field Acceptance Testing
Water Chiller 2.8Factory Tests 3.6System Performance Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 41 PAGES
23 64 10 SD-07 Certificates
3.2.2 GRefrigeration System
SD-08 Manufacturer’s Instructions GWater Chiller
SD-10 Operation and Maintenance Data
3.7 GOperation and Maintenance
Manuals
23 64 26 SD-03 Product Data
2.2.2.4 GGrooved Mechanical
Connections For Steel
2.3.3 GGrooved Mechanical
Connections For Copper
2.4.5 GCalibrated Balancing Valves
GAutomatic Flow Control Valves 2.4.6Pump Discharge Valve
GWater Temperature Regulating Valves
Water Pressure Reducing Valve 2.4.7Pressure Relief Valve 2.4.8Combination Pressure and
Temperature Relief Valves
2.5.9 GExpansion Joints
2.6 GPumps
2.9 GWater Treatment Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 41 PAGES
23 64 26 2.5.3 GCombination Strainer And Pump Suction Diffuser
2.7 GExpansion Tanks
2.8 GAir Separator Tanks
SD-06 Test Reports 3.1.1.3Piping Welds NDE Report
3.4.2 GPressure Tests Reports
GCondenser Water Quality Test Reports
GOne-Year Inspection Report For Cooling Water
SD-07 Certificates 3.1.1.1Employer's Record Documents
(For Welding) 3.1.1.2Welding Procedures and
Qualifications Piping for High-Pressure Compressed-Air Systems
Fittings Unions Flanges Gaskets Bolting
SD-08 Manufacturer’s Instructions
3.5 GLesson plan for the Instruction
Course
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 41 PAGES
23 64 26 SD-10 Operation and Maintenance Data
2.9 GWater Treatment Systems
2.4.5 GCalibrated Balancing Valves
GAutomatic Flow Control Valves
2.4.6 GPump Discharge Valve
GWater Temperature Regulating Valves
GWater Pressure Reducing Valve
2.4.7 GPressure Relief Valve
2.4.8 GCombination Pressure and
Temperature Relief Valves
2.5.9 GExpansion Joints
2.6 GPumps
2.5.3 GCombination Strainer and Pump
Suction Diffuser
2.7 GExpansion Tanks
2.8 GAir Separator Tanks
23 82 00.00 20 SD-03 Product Data 2.1Unit Heaters 2.2Infrared Heaters
SD-10 Operation and Maintenance Data
2.1Unit Heaters 2.2Infrared Heaters
26 05 00.00 40 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 41 PAGES
26 05 00.00 40 2.1 GMaterial, Equipment, and Fixture Lists
SD-03 Product Data
2.1.1 GConduits and Raceways
2.1.2 GWire and Cable
3.2.1.8 GSplices and Connectors
2.1.3 GSwitches
2.1.4 GReceptacles
2.1.5 GOutlets, Outlet Boxes, and Pull
Boxes
2.1.6 GCircuit Breakers
2.1.7 GLamps and Lighting Fixtures
SD-06 Test Reports 3.3Continuity Test 3.3Phase-Rotation Tests 3.3Insulation Resistance Test
SD-07 Certificates
1.4 GCertification
SD-08 Manufacturer’s Instructions Part 2Manufacturer's Instructions
26 05 48.00 10 SD-02 Shop Drawings 3.2Lighting Fixtures in Buildings 1.3Equipment Requirements
SD-03 Product Data
3.2 GLighting Fixtures in Buildings
1.3 GEquipment Requirements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 41 PAGES
26 05 48.00 10 1.2.4 GContractor Designed Bracing 26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure 26 09 23.00 40 SD-03 Product Data
3.1 GInstallation Drawings
GDimmer Switch
2.2.2 GLighting Contactor
GPhotocell Switch
2.2.3 GOccupancy Sensors
SD-06 Test Reports
3.2System Operation Tests SD-10 Operation and Maintenance Data
3.3Lighting Control System, Data Package 5
26 20 00 SD-02 Shop Drawings
2.13 GPanelboards
2.20 GWireways
SD-03 Product Data
2.12 GReceptacles
2.13.1 GCircuit breakers
2.10 GSwitches
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 41 PAGES
26 20 00 2.14 GEnclosed circuit breakers GMotor controllers GCATV outlets GGrounding Busbar GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.3 GGrounding system test
SD-07 Certificates
2.11 GFuses
SD-10 Operation and Maintenance Data
1.5.1 GElectrical Systems
26 24 16.00 40 SD-02 Shop Drawings
GDetail Drawings GOutline Drawings
SD-03 Product Data
1.3 GPanelboards
2.1.2Directory Card and Holder
Filtered Panelboards SD-06 Test Reports
3.2Continuity Tests
3.2 GInsulation Tests
SD-07 Certificates
1.4 GStatements
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 41 PAGES
26 24 16.00 40 1.3 GPanelboards 26 29 23 SD-02 Shop Drawings
1.5.1 GSchematic diagrams
1.5.2 GInterconnecting diagrams
1.5.3 GInstallation drawings
SD-03 Product Data
2.1 GVariable frequency drives
2.3Wires and cables 1.5.4Equipment schedule
SD-06 Test Reports 3.2.1VFD Test 3.2.2Performance Verification Tests 3.2.3Endurance Test
SD-08 Manufacturer’s Instructions 1.5.5Installation instructions
SD-09 Manufacturer’s Field Reports
2.5.1 GVFD Factory Test Plan
1.5.6Factory test results
SD-10 Operation and Maintenance Data
2.1Variable frequency drives 26 51 00 SD-03 Product Data
GLED lighting fixtures GDimmer switch GLighting contactor
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 41 PAGES
26 51 00 GTime switch
2.4 GPhotocell switch
2.5 GPower hook fixture hangers
2.6 GExit signs
2.7 GEmergency lighting equipment
GCentral emergency system
2.8 GOccupancy sensors
GElectronic dimming ballast GDimming ballast controls GLight Level Sensor
1.6.3.3Energy Efficiency SD-04 Samples
1.6.1 GLighting fixtures
SD-06 Test Reports
3.3Operating test SD-10 Operation and Maintenance Data
1.4.1 GLighting Control System
1.8Operational Service
27 10 00 SD-02 Shop Drawings
1.6.1.1 GTelecommunications drawings
1.6.1.2 GTelecommunications Space
Drawings SD-03 Product Data
2.3 GTelecommunications cabling
GPatch panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 41 PAGES
27 10 00 2.5 GTelecommunications outlet/connector assemblies
GEquipment support frame GConnector blocks
1.10.3 GSpare Parts
SD-06 Test Reports
3.5.1 GTelecommunications cabling
testing
SD-07 Certificates
1.6.2.1 GTelecommunications Contractor
1.6.2.2 GKey Personnel
1.6.2.3 GManufacturer Qualifications
1.6.3 GTest plan
SD-09 Manufacturer’s Field Reports
2.9.1 GFactory reel tests
SD-10 Operation and Maintenance Data
1.10.1 GTelecommunications cabling and
pathway system
SD-11 Closeout Submittals
1.10.2 GRecord Documentation
28 05 26.00 40 SD-01 Preconstruction Submittals 3.7.2Grounding Systems
SD-02 Shop Drawings 1.4Record Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 41 PAGES
28 05 26.00 40 SD-03 Product Data 2.1Ground Rods 2.2Ground Wires 2.3Connectors and Fasteners 3.6Bonding
SD-06 Test Reports 3.7.1Bond Resistance Test 3.7.2Ground Resistance Tests
Ground Isolation Test 3.7.3Continuity Isolation Test
SD-08 Manufacturer’s Instructions 3.7.2Grounding Systems
28 31 76 SD-02 Shop Drawings Detail Drawings; G
SD-03 Product Data Storage Batteries; G Low Battery Voltage; G Special Tools and Spare Parts; G
GTechnical Data and Computer Software
Training Testing
SD-06 Test Reports Testing; G
SD-07 Certificates Equipment; G
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 41 PAGES
28 31 76 Qualifications; G SD-10 Operation and Maintenance Data
GOperating and Maintenance Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS