FA4418-15-R-0019_Attachment__3_Material_Submittal_(AF_Form_66)_dated_5_May_2014.pdf

PDF 78 KB Posted

Attached to
Repair Fire Protection System, Short Stay Federal contract opportunity
Solicitation number
FA4418-15-R-0019
Issued by
Department of the Air Force Air Mobility Command

About this file

FA4418-15-R-0019 Attachment 3 Material Submittal (AF Form 66) dated 5 May 2014

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

DKGV 11-2406

ECT TITLE Repair Fire Protection stem-Short Stay (SS)

SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

N

E N

U M

B E

R

ITEM OR DESCRIPTION OF

ITEM. CONTRACT REFERENCE,

TYPE OF SUBMITTAL

NO. OF COPIES REQUIRED

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPEN

SE DATE

FOLLOW-

UP

DATE

CONTRACT

OR

NOTIFIED P

R E

-C O

N S

TR

U

C

TI

O N

C

R

TI

FI

C

A

TE

O F

C O

M P

LI

A

N

S H

O P

D R

A W

IN

G

A

M P

LE

LO

R

S E

LE

C

TI

M

FG

'S I

N S

TR

U

C

TI

O

FG

'S W

A R

R A

TY

P

O D

U C

T D

TA

D

S

IG

N D

TA

P

E R

A

TI

IO

IN

TE

N A

N C

E C

LO

S

E O

U T

D O

C U

M E

N

TS

R E

P O

TS

APPROVE

DIS-

APPROVE

1 01 30 00 1.2 Admin Req'ts 5

2 01 32 17.00 20 1.2 Network Analysis Sched. 5 5 2

3 01 33 00 1.2 Submittal Procedures 5

4 01 35 26 1.3 Govt. Safety Req. 5 5 5

5 01 45 00 1.2 Construction Quality Control 5 5

6 01 50 00 1.3 Temp. Const. Fac. & Con. 5 5 5 5

7 01 50 10 1.3 Environmental (JBC-ABW) 5 5

8 01 54 00 1.3 Green Procurement (JBC-ABW) 5

9 01 57 19.00.25 1.3 Temp. Environmental Controls 5 2 5

10 0174 19.00.25 1.3 Construction and Demolition Waste Management 5 2

11 01 75 00 1.2 Starting and Adjusting 5 5 5 5 5 5 5 5

12 01 78 003 1.1 Closeout Submittals 5 5 5 2

13 01 78 02.00.20 1.1 Project Record Documents 3

14 02 41 00 1.5 Demolition and Deconstruction 5 5 2

15 03 30 53 1.4 Misc. Cast-in-Place Concrete 5 5 5

16 05 50 13 1.2 Metal Fabrications 5

17 09 90 00 1.2 Paints & Coatings 5 5 5

18 31 00 00 1.5 Earthwork 5 5 5 5

19 32 84 00 1.3 Water Lines - PVC Pipe 5 5

20 33 11 00 1.3 Water Lines 5 5 5 2 5

AF Form 66

FA4418-15-R-0019 Attachment #3 Material Submittal (AF Form 66) dated 5 May 2014

File details come from the government source that posted it. Updated .