Submittal_Register_attachment_3_(2).pdf
PDF 38 KB Posted
- Attached to
- Repair Erosion at Grace Hopper Bridge Federal contract opportunity
- Solicitation number
- FA4418-15-R-0014
About this file
Submittal Register Repair Erosion on East Embankment of Grace Hopper Bridge
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4418-15-R-0014-0001.pdf | ||
| Wage_Determination.docx | DOCX document | |
| Specifications.pdf | ||
| Green_Procurement_Form_B302_attachment_4_(2).pdf | ||
| Drawings.pdf | ||
| FA4418-15-R-0014.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES
DKGV 11-2024
ReDesign of Erosion Control Grace Hopper Bridge
01 11 00 SD-01 Preconstruction Submittals 1.9.1Utility Outage Requests
01 14 00 SD-01 Preconstruction Submittals
1.4.1.1 GList of Contact Personnel
1.5.2 GPersonnel List
1.5.3 GVehicle List
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GConstruction schedule
01 33 00 SD-01 Preconstruction Submittals
1.9 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
1.8 GActivity Hazard Analysis (AHA)
1.7.1 GCrane Critical Lift Plan
1.6.1.2 GCrane Operators
SD-06 Test Reports 1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3Crane Reports
SD-07 Certificates 1.9Hot work permit 1.14License Certificates
1.4 GContractor Safety Self-Evaluation
Checklist 1.12.5Third Party Certification of
Barge-Mounted Mobile Cranes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
1271209696A Typewritten Text Attachment 3
1271209696A Typewritten Text
FA4418-15-R-0014
1271209696A Typewritten Text
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES
ReDesign of Erosion Control Grace Hopper Bridge
01 35 26 1.12.4Certificate of Compliance 01 45 00.10 20 SD-01 Preconstruction Submittals
1.6 GQC Plan
01 50 10 SD-01 Preconstruction Submittals
1.4.1Material Safety Data Sheet
(MSDS)
SD-06 Test Reports 1.8Affirmative Procurement 1.3Recycling Report
01 54 00 SD-03 Product Data
1.5.2.1 GAffirmative Procurement
Reporting Form 01 57 20 SD-01 Preconstruction Submittals
1.3.3 GConstruction Waste Management
Plan
01 57 50 SD-01 Preconstruction Submittals
1.7.1 GPreconstruction Survey
1.8.3 GRegulatory Notifications
1.5 GEnvironmental Protection Plan
1.6 GDirt and Dust Control Plan
SD-06 Test Reports 3.9.2Disposal Requirements 1.8.4Erosion and Sediment Control
Inspection Reports 3.4Erosion and Sediment Control
Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
1271209696A Typewritten Text
FA4418-15-R-0014
1271209696A
Attachment 3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES
ReDesign of Erosion Control Grace Hopper Bridge
01 57 50 3.4Storm Water Inspection Reports for General Permit
1.8.5 GSolid Waste Disposal Report
SD-07 Certificates
1.8.2 GContractor 40 CFR employee
training records
SD-11 Closeout Submittals
3.4.2 GStorm Water Pollution Prevention
Plan compliance notebook 1.8Waste Determination
Documentation 3.7.2Waste Determination
Documentation 1.8.1Disposal Documentation for
Hazardous and Regulated Waste 1.8.2Contractor 40 CFR Employee
Training Records 1.7.2Solid Waste Disposal Permit 1.8.5Solid Waste Disposal Report 3.7.2Hazardous Waste/Debris
Management 1.8.3Regulatory Notifications
01 62 35 SD-01 Preconstruction Submittals
1.7 GBiobased Products
01 78 02.00 20 SD-11 Closeout Submittals
2.1 G ARecord Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
1271209696A Typewritten Text
FA4418-15-R-0014
1271209696A
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES
ReDesign of Erosion Control Grace Hopper Bridge
01 78 02.00 20 2.2 G ARecord GIS Data
2.3 G ARecord Specifications
2.4 G ARecord Product Data
31 05 22 SD-04 Samples 2.2.1Geotextiles
SD-06 Test Reports 2.2.1Geotextiles 2.2.2Site Verification
SD-07 Certificates 2.2.1Geotextiles 2.2.1.3Needle Punched Geotextile
31 11 00 SD-03 Product Data
3.5.1 GNonsaleable Materials
SD-04 Samples 2.1Tree wound paint 2.2Herbicide
31 36 00 SD-04 Samples 1.5.1Gabions 2.1.2Alternative Wire Fasteners
SD-06 Test Reports 1.5.1Gabions
2.1.2 GAlternative Wire Fasteners
SD-07 Certificates 2.1.4Stone Fill
Filter Material 31 41 16 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
1271209696A Typewritten Text
FA4418-15-R-0014
1271209696A
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES
ReDesign of Erosion Control Grace Hopper Bridge
31 41 16 2.1Metal Sheet Piling SD-03 Product Data
3.2.2.2Driving
3.2.1 GPile Driving Equipment
3.2.5 GPulling and Redriving
2.3.2 GInterlocked Joint Strength in
Tension Test SD-06 Test Reports
2.3.1Materials Tests 2.3.2Interlocked Joint Strength in
Tension Test SD-11 Closeout Submittals
3.4Pile Driving Record 32 92 19 SD-03 Product Data
2.4.3Wood cellulose fiber mulch 2.3Fertilizer
SD-06 Test Reports 2.2.3Topsoil composition tests
SD-07 Certificates 2.1seed
SD-08 Manufacturer’s Instructions 2.6Erosion Control Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
1271209696A Typewritten Text
FA4418-15-R-0014
1271209696A
File details come from the government source that posted it. Updated .