Drawings.pdf
PDF 4 MB Posted
- Attached to
- Repair Erosion at Grace Hopper Bridge Federal contract opportunity
- Solicitation number
- FA4418-15-R-0014
About this file
Drawings Repair Erosion on East Embankment of Grace Hopper Bridge
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4418-15-R-0014-0001.pdf | ||
| Wage_Determination.docx | DOCX document | |
| Submittal_Register_attachment_3_(2).pdf | ||
| Specifications.pdf | ||
| Green_Procurement_Form_B302_attachment_4_(2).pdf | ||
| FA4418-15-R-0014.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Manatee & Wood Stork Guidelines
To reduce potential construction-related impacts to the manatee to discountable and insignificant levels, the Service recommends implementing the Standard Manatee
Construction Conditions, which are as follows:
The permittee will comply with the following manatee protection construction conditions:
a. The permittee shall instruct all personnel associated with the project of the potential presence of manatees and the need to avoid collisions with manatees.
All construction personnel must monitor water-related activities for the presence of manatee(s) during May 15 - October 15.
b. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act of 1972 and the Endangered Species
Act of 1973.
c. Any siltation barriers used during the project shall be made of material in which manatees cannot become entangled and must be properly secured, and regularly monitored to avoid manatee entrapment.
d. All vessels associated with the project shall operate at “no wake/idle” speeds at all times while in the construction area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.
e. If manatee(s) are seen within 100 yards of the active construction area all appropriate precautions shall be implemented to ensure protection of the manatee.
These precautions shall include the operation of all moving equipment no closer than 50 feet to a manatee. Operation of any equipment closer than 50 feet to a manatee shall necessitate immediate shutdown of that equipment. Activities will not resume until the manatee(s) has departed the project area of its own volition.
f. Any collision with and/or injury to a manatee shall be reported immediately to Ms
Melissa Bimbi of the U.S. Fish and Wildlife Service, Charleston Field Office at
(843) 727-4707 x 217 or Mr. Jim Valade of the U.S. Fish and Wildlife Service, North Florida Field Office, at (904) 731-3116.
g. Wood Storks may also be present within project limits. Please avoid direct disturbance.
Manatee & Wood Stork Guidelines
To reduce potential construction-related impacts to the manatee to discountable and insignificant levels, the Service recommends implementing the Standard Manatee
Construction Conditions, which are as follows:
The permittee will comply with the following manatee protection construction conditions:
a. The permittee shall instruct all personnel associated with the project of the potential presence of manatees and the need to avoid collisions with manatees.
All construction personnel must monitor water-related activities for the presence of manatee(s) during May 15 - October 15.
b. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act of 1972 and the Endangered Species
Act of 1973.
c. Any siltation barriers used during the project shall be made of material in which manatees cannot become entangled and must be properly secured, and regularly monitored to avoid manatee entrapment.
d. All vessels associated with the project shall operate at “no wake/idle” speeds at all times while in the construction area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.
e. If manatee(s) are seen within 100 yards of the active construction area all appropriate precautions shall be implemented to ensure protection of the manatee.
These precautions shall include the operation of all moving equipment no closer than 50 feet to a manatee. Operation of any equipment closer than 50 feet to a manatee shall necessitate immediate shutdown of that equipment. Activities will not resume until the manatee(s) has departed the project area of its own volition.
f. Any collision with and/or injury to a manatee shall be reported immediately to Ms
Melissa Bimbi of the U.S. Fish and Wildlife Service, Charleston Field Office at
(843) 727-4707 x 217 or Mr. Jim Valade of the U.S. Fish and Wildlife Service, North Florida Field Office, at (904) 731-3116.
g. Wood Storks may be present within project limits. Please avoid direct disturbance.
| T1 |
| C1 |
| C2 |
| C3 |
| C4 |
| C5 |
| C6 |