Questions-Answers.pdf

PDF 208 KB Posted

Attached to
Repair Bldg 90748, 23 SOWS Federal contract opportunity
Solicitation number
FA441718R0010
Issued by
Department of the Air Force Special Operations Command

View the file

Other files for this federal contract opportunity

Other files attached to Repair Bldg 90748, 23 SOWS, newest first.
File Type Posted
Q_and_A_Late_additions_-_15_Aug.pdf PDF
FA441718R0010-0002.pdf PDF
Addendum_1.pdf PDF
Addendum_1_Drawings.pdf PDF
Specifications_REV20180810.pdf PDF
FA441718R0010_Amendment_0001.pdf PDF
Updated_Questions-Answers.pdf PDF
FA441718R0010_-_Site_Visit_Brief-SignIn.pdf PDF
Atch_6-Financial_Reference_Sheet.docx DOCX document
FA441718R0010_Repair_Bldg_90748_23_SOWS.pdf PDF
Atch_4-Additional_Contractor_Information.pdf PDF
Atch_2-Repair_Bldg_90748_23_SOWS_Drawings.pdf PDF
Atch_1-Repair_Bldg_90748_23_SOWS_Specifications_6_Jul_18.pdf PDF
Atch_5-Past_Present_Performance_Questionnaire.docx DOCX document
Atch_3-Wage_Determination_FL180262.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. FA441718R0010

23 SOWS, Bldg. 90748

QUESTIONS & ANSWERS

2 Aug 2018

Question 1: It appears as though the left side (plan view) of the building is a secured area, while the right side is not. Should the ductwork that goes through the secured walls have security bars in them?

Answer: No, bar are not required.

Question 2: Drawing FA-100, General Demolition Note states, "Fire Alarm System to remain operational throughout the extent of construction." With the extent of the wall and ceiling demolition within the project area, leaving nothing for the fire alarm conduit or devices to remain mounted to, can the government confirm this note is intended to convey that the occupied, non-project area's Fire Alarm system is to remain operational at all times, but that the project area's fire alarm is not expected to remain operational at all times?

Answer: The fire alarm system must remain operational at all times for the project duration for the entire building area.

Question 3: Where will dumpster be allowed?

Answer: West of building 90748.

Question 4: Will more than one dumpster be allowed on project at same time?

Answer: Yes.

Question 5: Attachment 5 of the Solicitation requests P/PPQs. How many do we need?

Also, can we use CPAPs? If so, how many? What is the maximum we can submit?

Answer: Please review Sections L & M of the Solicitation. It provides guidance on what is to be submitted and how it will be evaluated.

Question 6: Specification section 01 33 00-1.9-c – Please confirm the review period is in working days. It seems that many days should be in calendar days. A review period that long is too much for this short of a project duration.

Answer: Calendar days is correct for the review period.

-END QUESTIONS & ANSWERS -