FA441718R00030003.pdf

PDF 111 KB Posted

Attached to
Upgrade Fire Alarm System at Dorms Federal contract opportunity
Solicitation number
FA441718R0003
Issued by
Department of the Air Force Special Operations Command

About this file

Solicitation Amendment FA441718R00030003

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Fire Alarm System at Dorms, newest first.
File Type Posted
Synopsis-Award.pdf PDF
Revised_Drawing_Sheet_T001.pdf PDF
FA441718R00030002.pdf PDF
FA441718R0003-Attach_07-Spec_01_50_00.pdf PDF
FA441718R0003-Amendment_0001.pdf PDF
Q-A_Attachment-Edwards_Data_Sheet.pdf PDF
FA441718R0003_Questions_and_Answers_30_May_2018.pdf PDF
Pre-Proposal_Site_Visit-Brief-Memo.pdf PDF
MFR_and_Sign_In_Site_Visit_FA441718R0003.pdf PDF
Atch_2_-_Drawings_7_Feb_18.pdf PDF
Atch_5_-_Past_Present_Performance_Questionnaire.pdf PDF
FA441718R0003.pdf PDF
Atch_1_-_Specs_9_Apr_18.pdf PDF
Atch_6_-_Financial_Reference_Sheet.pdf PDF
Atch_4_-_Additional_Contractor_Information.pdf PDF
Atch_3_-_Wage_Determination.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CP1018248

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the phasing on Draw ings Sheet T-001, extend the Period of Performance, update FAR Clause

52.211-10, and extend the proposal due date to 26 June 2018. SEE SUMMARY OF CHANGES.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Jun-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X

FA441718R0003

X 9B. DATED (SEE ITEM 11)

02-May-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Jun-2018

CODE

1SOCONS/PKB - AARON THURBER

350 TULLY ST

HURLBURT FIELD FL 32544

FA4417 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA441718R0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 19-Jun-2018 02:00 PM to 26-Jun-2018 02:00 PM.

The Issued By organization has changed from

1SOCONS/PKB - BRENDAN DELANE

350 TULLY ST

HURLBURT FIELD FL 32544

to

1SOCONS/PKB - AARON THURBER

350 TULLY ST

HURLBURT FIELD FL 32544

The offeror acceptance period has decreased by 55 from 244 to 189.

The contractor period of performance end date has increased by 260 days from 270 days to 530 days.

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

270 dys. ANP 1 1 SOCES CEOE

STEVEN LOKEN

415 INDEPENDENCE RD

HURLBURT FIELD FL 32544-5267

850-884-6024

FOB: Destination

F2F323

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

530 dys. ANP 1 1 SOCES CEOE

STEVEN LOKEN

415 INDEPENDENCE RD

HURLBURT FIELD FL 32544-5267

850-884-6024

FOB: Destination

F2F323

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

FA441718R0003

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 530 calendar days. The time stated for completion shall include final cleanup of the premises.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS

List of Attachments: Dated Pages

1. Specifications, CP1018248, Upgrade Fire Alarm 9 April 2018 138

System, Dorms 90369 & 90358

2. Drawings, CP1018248, Upgrade Fire Alarm 7 February 2018 27

System, Dorms 90369 & 90358

3. Wage Determination FL180262 FL262 12 January 2018 6

4. Additional Contractor Information Not Dated 2

5. Past Performance Questionnaire Not Dated 4

6. Financial Institution Reference Sheet Not Dated 1

7. Specifications Section 01 50 00 Not Dated 8

8. Revised Drawing Sheet T-001, CP1018248, 12 June 2018 1

Upgrade Fire Alarm System, Dorms 90369 &

90358

End of Attachments

AMENDMENTS: Amendments issued to this solicitation will be part of any resultant contract and will be listed above at the time of award.

(End of Summary of Changes)

File details come from the government source that posted it.