Questions_and_Answers.pdf
PDF 100 KB Posted
- Attached to
- Renovate Room 505 CTS Bldg 90005
- Solicitation number
- FA4417-17-R-0013
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4417-17-R-0013
FTEV 16-1013, Renovate Room 505th CTS Bldg. 90005
Questions & Answers
Question 1 Is there any asbestos present in the project area(s)?
Answer 1 There is no known asbestos in the project area.
Question 2 Due to the installation of new curbs on the roof, what is the existing roofing system and who is the manufacturer? Is the roof currently under warranty?
Answer 2 The existing roof is a Built Up Roof (BUR) with a thick coat of elastomeric material coating. The material supplier of the elastomeric coating is NEOGARD and the roof is not under warranty.
Question 3 Is the Owner responsible for removing all the furniture or is it the contractor’s responsibility?
Answer 3 Existing furniture will be removed by the government before construction.
Question: According to Section L Paragraph 4.1.3, if the past performance reference is in the PPIRS system, the offerors can submit the review along with the questionnaire electronically. Should the offeror only fill out Section A of the questionnaire and then attach with the review? Do the PPIRS review documents need to be submitted separately from the other proposal documents or would they be included with the rest of Factor 2, Volume II(a)’s documents?
Answer: Yes, the contractor should fill out Section A and attach a copy of the evaluation to be included in Factor 2, Volume II(a).
File details come from the government source that posted it. Updated .