12-R-0002 amend0002.pdf

PDF 74 KB Posted

Attached to
JBSA-SABER Federal contract opportunity
Solicitation number
FA3089-12-R-0002
Issued by
Department of the Air Force Air Education and Training Command

About this file

The purpose of this Amendment is to add a disclaimer to Attachment 3 (Co-Efficient Worksheet)

View the file

Other files for this federal contract opportunity

Other files attached to JBSA-SABER, newest first.
File Type Posted
SABERamendment.pdf PDF
Saber Specs.pdf PDF
(2)QA SABER-1.pdf PDF
SABER Attachements.zip ZIP file
SABER(1)FA3089-12-R-0002.pdf PDF
SABER FA3089-12-R-0002.pdf PDF
SABER Attachements.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to add a diclaimer statement to Attachment 3 of the Co-Efficient w orksheet.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Aug-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA3089-12-R-0002

X 9B. DATED (SEE ITEM 11)

27-Jul-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Aug-2012

CODE

902 CONS/LGCA - FA3089

395 B STREET WEST STE 2

RANDOLPH AFB TX 78150-4525

FA3089 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA3089-12-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

ATTACHMENT 3

FA3089-12-R-0002

Detail Summary of Costs to Support Coefficient

Ktr

Detail

Proposal

# COST Element of Coefficient QTY Contractor's Proposal Costs

LABOR OVERHEAD

1 Project Manger @

2 Cost Estimator @

3 CADD Technician/Draftman @

4 CQC System Manager/Safety

5 Project Administrator @

6 Superintendents @

Subtotal of Overhead Labor

LABOR BURDEN

7 FICA @ 6.20%

8 Medicare @ 1.45%

9 SUTA/SUI @

10 FUTA @

11 Worker's Comp @

12 General Liability @

13 Fringe Benefits @

Labor Burden Costs

MATERIAL OVERHEAD QTY

14 Mobilization/Demobilization

15 Computers

16 Printers

17 Plotter

18 CAD/Scheduling Software

19 Office Software

Government and Contractor

E4Clicks Premier Software

System

21 Copier/Leased

22 FAX

23 Telephone System

24 Communications

25 Furniture for Trailer

Refernce Book &

Codes(Construction)

27 Tools Miscellaneous

Total for Material Overhead

VEHICLE & EQUIPMENT QTY

28 Vehicles @

29 Flat-Bed Trailer

30 Storage Trailer

Total for Vechicle & Equipment

VEHICLE & EQUIPMENT

(Depreciation) QTY

Contractor Calculations

Vehicles

Contractor: Office Furniture &

Materials

Total for Vechicle & Equipment

ANNUAL OPERATING

COSTS AT JOB SITE QTY

33 Connex Rental

34 Telephone

35 Interent

36 Cell Phone Time

37 Utilties

38 Office Equipment & Supplies

39 Temp Fence At Laydown Yard

Small Tools & Supplies (Direct

Labor

41 Vehicle Fuel & Maintenance

42 Vehicle Insurance

43 Annual Training

Computer Office Software

Upgrades

45 CAD/Scheduleing

Projects Where Contract Developes Statement of Work (Unfunded Projects)

Section B

Unit of issue

Sec B Projects Under $100K JB

Sec B

Projects between $100K to

$250K JB

Sec B Project Over $250K JB

Projects Where Contract Developes Statement of Objectives (Unfunded

Projects) Section B

Sec B Projects Under $100K JB

Sec B

Projects between $100K to

$250K JB

Sec B Project Over $250K JB

CONTRACTOR NOTE: The above cost elements may make up your coefficient are not all inclusive.

The contractor may add cost elements to their coefficient as the solicitation indicates

All contractors' costs listed shall be supported with back up data.

Disclaimer: This is a sample worksheet only, not an offical document to be submitted. It is at the contractors discretion on how they arrived at their proposed co-efficent. Please reference Section B, paragraph 4.0 for list of cost

(not all inclusive) when developing a co-efficient.

Summary of Costs/Percentage for Coefficient FA3089-12-R-0002

DESCRIPTION OF TOTAL

EXPENSE % Contractor's Total Costs

Annual Revenue

Labor Overhead

Labor Overhead Burden

Material Overhead Total @ Jobsite

Vehicle Equipment Total

Annual Operating Costs at Jobsite

Waste Materials

Quality Control % Testing

Design Support

G & A

P & P Bonding

Prime Profit @

Book Efficieny Discount

Coefficient W/Adjusted Inflation

2nd year Inflation factor

3rd year inflatioin factor

4st year inflation factor

Proposed Average Weighted

Coefficent

CONTRACTOR NOTE: The above cost elements that will make up your coefficient are not all inclusive.

The contractor may add cost elements to their coefficient as the solicitation indicates

Disclaimer: This is a sample worksheet only, not an offical document to be submitted. It is at the contractors discretion on how they arrived at their proposed co-efficent. Please reference Section B, paragraph 4.0 for list of cost (not all inclusive) when developing a co-efficient.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .