FA3047-15-R-0061 JBSA Airfield Maintenance Rubber Removal Attachment 1 Statement Of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003.pdf | ||
| Q_and_A_FA3047-15-R-0061_Airfield_Maintenance.pdf | ||
| Amendment_2_SF_30_Atch_1_SOW_2_Sep_15.pdf | ||
| FA3047-15-R-0061.pdf | ||
| FA3047-15-R-0061.pdf | ||
| Attachment_4_schedule_material_submittals_24_Aug_15.xls | XLS spreadsheet | |
| Atch_3._-_Wage_Determination_Heavy__Highway.pdf | ||
| SF_1442_Solicitation.pdf | ||
| Atch_5._-_Schedule_B_13_Aug_15.pdf | ||
| Atch_2._-_Appendix__A_-_G_12_Aug_15.pdf | ||
| Atch_4._-_Schedule_Of_Materials_Submittal_13_Aug_15.pdf | ||
| Map__JBSA-Lackland_Visitor_Center.jpg | JPG image |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Attachment 1 | JBSA 150001 | |
| 10 August 2015 |
AIR EDUCATION & TRAINING COMMAND (AETC)
JOINT BASE SAN ANTONIO (JBSA)
STATEMENT OF WORK
| PROJECT TITLE: | JBSA Airfield Maintenance, Rubber Removal | ||
| PROJECT NUMBER: | JBSA150001 | ||
| WORK ORDER NUMBER: | Multiple | ||
| LOCATION: | JBSA Airfields – Randolph and Lackland (Kelly Airfield) |
1.0 GENERAL
1.1 Project Objective:
1.1.1 The objective of this project is to paint and perform maintenance on the JBSA Airfields.
1.2 General Requirements:
1.2.1 The objective of this project is to paint and perform maintenance on the JBSA Airfields. The contractor is responsible to acquire all information to address the items annotated within this SOW and referenced regulations, codes and guides. In addition, contractor shall abide by section “2.0 Applicable documents” of this SOW. Contractor shall field verify all dimensions and information provided.
1.2.2 All work shall follow standards defined by UFC 3-260-01, UFC 3-535-01, FAA AC 150-5345-44, FA AC 150-5340-18, ETL 04-2 and Federal Standard TT-P-1952E as well as Joint Base San Antonio (JBSA) regulations, local, state, and federal codes, regulations, and requirements.
1.2.3 All work shall be performed in strict accordance with the provided contract specifications, drawings, JBSA regulations, local, State, Federal codes, regulations, and contract requirements as applicable. It is the contractor’s responsibility to secure access to specific governing criteria as required. The Government relies on the contractor to follow and implement the necessary codes as the expert General Contractor (GC). Contractor shall perform construction in accordance with the specifications (UFGS) within this solicitation and shall add additional Unified Facilities Guide Specifications as required. The contractor shall follow and abide by the UFC and referenced industry code within the UFC. It is the contractor’s responsibility to secure access to specific codes as required.
1.3 BASE BID:
1.3.1 JBSA-RANDOLPH:
1.3.1.1 Rubber Removal: The removal of rubber deposits shall be accomplished by using a de- rubberizing compound, environmentally friendly bio-degradable chemical specifically formulated and field tested for this purpose. Typically, the areas to be cleaned are saturated with the cleaner, agitated by a mechanical scrubber using wire brushes, and rinsed with clean water.
1.3.1.1..1 All work shall be accomplished while the airfield is closed (1900-0600) and shall be returned to flying condition before the airfield reopens. Areas for Rubber Removal will include:
· Runway 14L – 1,800 feet in length by 100 feet wide
· This action shall occur in December 2015 and June 2016
· Runway 32R – 1,200 feet in length by 100 feet wide
· This action shall occur in June 2016
· Runway 14R – 1,000 feet in length by 75 feet wide
· This action shall occur in June 2016
· Runway 32L – 1,000 feet in length by 75 feet wide
· This action shall occur in June 2016
· Contractor shall re-stripe areas of paint that were removed during rubber removal. Striping shall be in accordance with the contract specifications and applicable documents referenced in this SOW. Striping of the east runway shall be subject to the guidelines listed in the painting section below.
1.3.1.2 Airfield Painting:
1.3.1.2..1 Contractor shall paint all runway markings to include the hold lines, deceptive markings, and overrun chevrons on runway 14L/32R in accordance with applicable documents aforementioned in this SOW.
1.3.1.2..2 This work shall be completed while the airfield is regularly shut down (nights, weekends, and federal holidays). Designation numbers and hold lines shall not be missing during airfield operations; other airfield markings (threshold, centerline, touchdown zone, etc.) may be missing if approved by the Airfield Manager. Contractor shall phase the paint schedule and plan accordingly.
1.3.1.2..3 All paint on the east runway shall be removed (except for deceptive surface markings and overrun chevrons) to the pavement surface (less than 0.2 millimeters shall remain) before the new lines are painted and in accordance with the specifications. This should be done in such a manner that the airfield pavement and appurtenances are not damaged.
1.3.1.2..4 The contractor shall provide water pressure impact upon the indicated pavement areas sufficient to remove the designated paint without damaging the existing pavement, joint sealant, and other airfield appurtenances. The contractor shall be responsible for repairing any damage caused by the removal work.
1.3.1.2..5 The contractor shall paint 6” black outlines around all of the paint included on the east runway.
1.3.1.2..6 North of Building 80 is the defueling area. Contractor shall paint a white AGE box, four 6” yellow parking lines, and nose blocks for four T-38 aircraft parking spaces. See conceptual diagram attached as Appendix C. Location of these lines shall be designated by the Airfield Manager.
1.3.1.2..7 All paint included in this project, including any bid options that are awarded, shall be retro reflective per specifications. The only exception are the 6” black outlines.
1.3.1.2..8 The contractor shall not remove paint or restripe when the temperature is below 40 degrees F, during lighting storms, or when the pavement is covered with ice.
1.3.1.3 Airfield Maintenance:
1.3.1.3..1 Install new tie-downs: The contractor shall fill in existing tie-downs and establish new tie downs in the defueling area to support four T-38 aircrafts (12 total tie downs). See Appendices C and D attached for a conceptual drawing and the tie-down detail.
1.3.1.3..2 Crack Repair: Rout and seal approximately 2,500LF of cracks on the Randolph airfield. Work shall be in accordance with the contract specifications. Location of the cracks to be repaired shall be coordinated with the Airfield Manager after award.
1.3.1.3..3 Spall Repair: Repair 250 one foot by one foot spalls on the Randolph airfield. Work shall be in accordance with the contract specifications. Location of the spalls to be repaired shall be coordinated with the Airfield Manager after award.
1.3.1.3..4 Joint Seal Replacement: Remove and replace 100,000 LF of Joint seal on the Randolph Airfield. Locations of the joints to be replaced shall be designated by the Airfield Manager after award. Work shall be in accordance with the contract specifications.
1.3.2 JBSA LACKLAND’S KELLY AIRFIELD: Rubber Removal
1.3.2.1 Contractor shall bring into compliance the 433rd’s Tail Enclosure Building 826’s pavement markings and signage. See drawings in appendix H as an example. Contractor shall paint five (5) feet wide clear zone marked on the pavement around all sides of the rails, minimum 3"-wide yellow line, with 15 degree angle stripes set at one (1) foot apart for the length of the warning area in accordance with IAW AFI 91-203 para 24.14.4.1 and AFI 21-101 AFRC SUP 1 para 2.20.2.1. Contractor shall provide a template and shall paint danger signs on both sides of the MTE rails every 25 feet and at the each end of each grouping in accordance with IAW AFI 91-203 para 24.14.4.2, Figure 29.1 and Table 29.3 as shown on the appendix H example. Place the sign so it can be read when approaching the hazard area. Contractor will be given access to the building five (5) consecutive working days in November or December 2015 for painting. Painting and signage shall be completed no later than 31 December 2015.
1.3.2.2 In June 2016, the contractor shall perform rubber removal at Kelly Runway’s North and South ends at 4,000 feet long 75 feet wide at each end, and 10 feet wide along the centerline for the whole length of the 11,500 foot runway. Rubber Removal shall be accomplished in accordance with specification Section 32 01 11.52 Rubber and Paint Removal from Airfield Pavement. Contractor shall use a rubber removal process that allows a plane to safely land with just ten minutes’ notice.
1.3.2.3 Once AETC gives approval, no earlier than May 2016, contractor shall change the runway designator number at the North end from 15 to 16 and at the South end from 33 to 34 by obliterating old painted number and repainting according to ETL_04_2 Airfield Markings and Specification section 32 17 23.00 20 Pavement Markings. One 12 hours shift from 7:00 pm to 7:00 am of runway soft or hard closure will be given to the contractor for this work.
1.3.2.4 Contractor shall repaint all lines that had rubber removed from them during June soft closures. Painting shall be in compliance with specification section 32 17 23.00 20 Pavement Markings.
1.3.2.5 Contractor may work all soft closure dates. Soft closure dates are:
· June 3rd, 2016 starting at 7:00 pm and ending June 7th, 2016 at 7:00 am
· June 7th, 2016 starting at 7:00 pm and ending June 8th, 2016 at 7:00 am
1.4 Paint the East Apron JBSA-RANDOLPH
1.4.1 Contractor shall paint all markings on the east taxiways and east apron in accordance with applicable documents aforementioned in this SOW. The bid option will extend to, but not include, the hold lines on all the taxiways connecting to the east runway, to the northern pavement edge, to the hangar doors and fence line on the apron to the west, and to the intersection of taxiways B and C and the south apron to the south (See diagram attached in Appendix E). All aerospace ground equipment (AGE) boxes and flight line road markings on the east apron shall be included.
1.4.2 The airfield will continue regular operation during this activity so at all times the aircraft shall be able to taxi/park/tow etc. Contractor shall coordinate with airfield management where temporarily moving aircraft parking is required. Contractor shall provide all necessary temporary airfield markings to ensure operations can continue and after the project the contractor shall remove any temporary markings placed.
1.4.3 The contractor shall assume that existing yellow lines are painted with lead based paint. The contractor shall capture all debris for a TCLP analysis and testing prior to disposal. Contractor shall properly dispose of contaminated materials in accordance with 01 35 35. Any disturbance of Lead Based Paint will have an OSHA Negative Exposure Assessment during the removal process in accordance with 29 CFR 1926.62.
1.4.4 The contractor shall paint 6” black outlines on both sides of every line on the East Apron. The only areas where black outlines shall not be used are in between the ramp edge and hangar doors.
1.4.5 Most of the apron paint shall be removed to the pavement surface (less than 0.2 millimeters shall remain) before the new lines are painted and in accordance with the specifications. This should be done in such a manner that the airfield is not damaged.
1.4.5.1 Areas where the contractor shall paint over the existing lines without any removal procedures include:
· Aircraft parking rows 12 – 15
· The hammerheads (Located on Taxiway A1 and A6)
· Aircraft parking rows 21-24
· Deceptive surface markings
1.4.6 The contractor shall provide water pressure impact upon the indicated pavement areas sufficient to remove the designated paint without damaging the existing pavement, joint sealant, and other airfield appurtenances. The contractor shall be responsible for repairing any damage caused by the removal work.
1.4.7 The contractor shall not remove paint or restripe when the temperature is below 40 degrees F, during lighting storms, or when the pavement is covered with ice.
1.5 Additional Joint Seal Replacement JBSA-RANDOLPH
1.5.1 Remove and replace an additional 100,000 LF of Joint seal on the Randolph Airfield. Locations of the joints to be replaced shall be designated by the Airfield Manager after award. Work shall be in accordance with the contract specifications.
1.6 Paint the West Apron JBSA-RANDOLPH
1.6.1 Contractor shall paint all markings on the west taxiways and west apron in accordance with applicable documents aforementioned in this SOW. The bid option will extend to, but not include, the hold lines on the taxiways connecting to the west runway, to the northern pavement edge, to the hangar doors and fence line on the apron to the east, and to the intersection of taxiways E and F and the south apron to the south (see diagram attached as Appendix E). All AGE boxes and flight line road markings on the west apron shall be included.
1.6.2 The airfield will continue regular operation during this activity so at all times the aircraft shall be able to taxi/park/tow etc. Contractor shall coordinate with Airfield Management where temporarily moving aircraft parking is required. Contractor shall provide all necessary temporary airfield markings to ensure operations can continue and after the project the contractor shall remove any temporary markings placed.
1.6.3 The contractor shall assume that existing yellow lines are painted with lead based paint. The contractor shall capture all debris for a TCLP analysis and testing prior to disposal. Contractor shall properly dispose of contaminated materials in accordance with 01 35 35. Any disturbance of Lead Based Paint will have an OSHA Negative Exposure Assessment during the removal process in accordance with 29 CFR 1926.62.
1.6.4 The contractor shall paint black 6” black outlines on both sides of every line on the West Apron. The only areas where black outlines shall not be used are in between the ramp edge and hangar doors.
1.6.5 Most of the apron paint shall be removed to the pavement surface (less than one millimeter shall remain) before the new lines are painted and in accordance with the specifications. This should be done in such a manner that the airfield is not damaged.
1.6.5.1 Areas where the contractor shall paint over the existing lines without any removal procedures include:
· Taxiway G from G1 – G5
· Taxiways G1 and G6
1.6.6 The contractor shall provide water pressure impact upon the indicated pavement areas sufficient to remove the designated paint without damaging the existing pavement, joint sealant, and other airfield appurtenances. The contractor shall be responsible for repairing any damage caused by the removal work.
1.6.7 The contractor shall not remove paint or restripe when the temperature is below 40 degrees F, during lighting storms, or when the pavement is covered with ice.
1.7 Paint the West Runway JBSA-RANDOLPH
1.7.1 Contractor shall paint all markings to include the hold lines and overrun chevrons on runway 14R/32L in accordance with applicable documents aforementioned in this SOW.
1.7.2 This work shall be completed while the airfield is regularly shut down (nights, weekends, and federal holidays). Designation numbers and hold lines shall not be missing during airfield operations; other airfield markings (threshold, centerline, touchdown zone, etc.) may be missing if approved by the Airfield Manager. Contractor shall phase the paint schedule and plan accordingly.
1.7.3 All paint on the west runway shall be removed (except for overrun chevrons) to the pavement surface (less than 0.2 millimeters shall remain) before the new lines are painted and in accordance with the specifications. This should be done in such a manner that the airfield is not damaged.
1.7.3.1 All paint on the southern half of the runway shall be completely removed (no ghost lines) to correct the striping in accordance with ETL 04-2. Currently, the 32L threshold markings are painted 50’ too long and fixing these markings will change the other markings on the southern half of the runway.
1.7.4 The contractor shall provide water pressure impact upon the indicated pavement areas sufficient to remove the designated paint without damaging the existing pavement, joint sealant, and other airfield appurtenances. The contractor shall be responsible for repairing any damage caused by the removal work.
1.7.5 The contractor shall paint the black 6” black outlines around all of the paint included on the west runway.
1.7.6 The contractor shall not remove paint or restripe when the temperature is below 40 degrees F, during lighting storms, or when the pavement is covered with ice.
1.8 Slab Replacement JBSA RANDOLPH
1.8.1 Slab replacement: Contractor shall remove and replace ten (10) existing concrete slabs in phases approved by the Airfield Manager. Slabs are 12.5FT by 25FT each. All work, material and testing shall be in accordance with the contract specifications and applicable documents referenced in this statement of work. The slabs are approximately 12” thick. There may be dowel bars.
1.8.1.1 Slabs shall be cut into a manageable size and lifted to the awaiting haul truck. Slabs are to be removed with minimal damage to the existing base grade. The debris from the demolition shall be removed as the debris is developed. The debris shall be taken to a recycler.
1.8.1.2 Striping will need to be “blacked out” near the removed slabs as needed by the Airfield Manager to ensure safe flight operations. Any temporary “blacked out” striping to be removed and restriped to original layout after concrete has cured and prior to acceptance by the Government.
1.8.1.3 Slabs to be replaced with a paver-finisher that shall be heavy-duty, self-propelled machine designed specifically for paving and finishing high quality pavement, per UFGS 32 12 11. In addition, all construction joints are to be doweled as specified in UFGS 32 13 11.
1.8.1.4 The existing base grade shall be re-compacted to 100% prior to new concrete being installed.
1.8.1.5 All barricading and striping shall conform to ETL 04-2 Standard Airfield Pavement Marking Scheme. Low profile lighted barricades will be required to designate the work areas. These barricades will be spaced at a maximum distance of 25ft apart.
1.8.1.6 This work shall be completed while the airfield is regularly shut down. Contractor may only work during normal flying hours if it is authorized by the Airfield Manager.
1.9 Paint Test Cell Area
1.9.1 The contractor shall remove to the pavement surface (less than 0.2 millimeters shall remain) and repaint the existing 6” yellow taxi lines running from Taxiway A1 to the jet engine test cell. The contractor shall paint six new 4” wide, 75’ long white lines on the test cell ramp as indicated on the conceptual drawing attached as Appendix B. These 4” lines shall break 3’ on either side of the 6” taxi lines where they intersect. Location of these lines shall be designated by the Airfield Manager.
1.10 Miscellaneous Items
1.10.1 The contractor shall paint five retro reflective controlled area signs on the pavement, three on the east side and two on the west side of crossover road; the exact location shall be determined by the Airfield Manager. The controlled area sign example shown in Appendix F shows the exact wording and layout of these signs.
1.10.1.1 The size of these signs is not regulated however they need to be large enough to be read from about 15 to 20 feet away by a vehicle, motorcycle, bicycle or pedestrian. For bidding purposes the contractor shall assume that the red “warning” letters are 6”, the “controlled area” letters are 4”, and the rest of the letters are 1.5”. The background of the sign shall be painted white (retro reflective).
1.10.2 Contractor shall replace five sign panels (not the entire sign) on the airfield. All signs shall meet the requirements of UFC 3-535-01 Chapter 9. The contractor shall install size five sign panels and shall refer to the conceptual sign panel drawings in Appendix G for content.
1.10.2.1 The government assumes that for the blinking signs at crossover road that only one panel per sign shall be necessary to accomplish the repair. If this cannot be accomplished and it requires two panels per sign and a clear panel divider, the contractor shall notify the government to modify this statement of work. The stop and no turn symbols can be reused. Contractor shall field verify dimensions of this sign because the clear circles in the sign shall line up with the red flashing lights. This repair shall result in a complete and usable sign.
1.10.3 The contractor shall remove the headwall by Taxiway G because it is an airfield obstruction. Contractor shall sod the disturbed area and ensure that it is graded correctly so that the water will drain to the nearby inlet.
1.11 Location of Work: The work is located on the JBSA Airfields in San Antonio, TX.
1.12 Additional Airfield Procedures – JBSA LACKLAND:
1.12.1 The following are procedures in addition to the ones outlined in the specifications (Appendix A) which shall be adhered to when working on JBSA-Lackland’s Kelly Airfield:
1.12.1.1 Three weeks prior to the start of work the contractor shall request an Airfield Drivers Class. Classes are held at request on Tuesdays, Wednesdays, or Thursdays. They are held once per month from 5:00 a.m. (0500) to 3:00 p.m. (1500). Class size is limited to 4 to 6 people. An airfield driver’s license is required for all personnel who will be driving on the airfield. Contractors shall bring a contractor owned vehicle to the class for the driving test. Contractor shall provide names, dates of birth, driver’s license numbers/states of issue, and driver’s license restrictions of each person taking the class. Drivers with color blindness will not be permitted to drive on the airfield. Color vision proof shall be provided in written form, and signed by a Doctor. FAA regulations require the control tower to speak English. The driver shall understand and speak English well enough to communicate to the control tower and take a written test. The driver shall have a current driver’s license. Scheduling can be coordinated through the 502 CES/CEN project managers; JBSA-Lackland phone - 210-671-1538, Kathy Metivier.
1.12.1.2 Three weeks prior to the start of work the contractor shall submit the names, dates of birth, and driver’s license numbers/states of issue for each person working on this project. These names will be submitted to security for a background check and once they are approved they will be put onto an Entry Authorization List (EAL). This is separate from the base pass.
1.12.1.3 A Soft closure is when the runway is open but no planes are scheduled to land. Unscheduled flight may still land during a soft closure. Contractor shall be required to restore runway to safe conditions and exit the runway within 10 minutes of notification.
1.12.1.4 A minimum of two contractor personnel shall have an airfield driver’s license and a current AF Form 483 and they shall remain on site at all times.
1.12.1.5 A radio for tower communication will be made available by Airfield Operations.
1.12.1.6 Hard hats and ball caps are not permitted on the airfield.
1.13 POCs: The Government shall be represented by the following individuals:
| Project Manager: | Neyda Gutierrez | 502CES/CENMP | (210) 652-1812 | |
| Contract Officer: | Ruben Gonzales | 502CONS/JBKAA | (210) 473-8071 |
2.0 APPLICABLE DOCUMENTS
2.1 The Contractor shall identify and comply with all applicable federal, state, and local statutes; DoD/Air Force instructions, manuals, handbooks, regulations, guidance, and policy letters including but not limited to the most recent version of; International Building Code (IBC); Unified Facility Criteria (UFC); Uniform Plumbing Code (UPC); Uniform Mechanical Code (UMC) National Fire Protection Association (NFPA); National Electrical Code (NEC); American Concrete Institute building code (ACI 318); AISC Steel Construction Manual; Adoption of Architectural Barriers Act (ABA) Guidelines for Accessibility; Specifications included with this solicitation; Randolph AFB compatibility guide; and including all changes and amendments in effect on the date of issuance of this DO. It is the Contractor’s responsibility to identify and comply with all applicable requirements.
2.2 The Technical Specifications for this project are numbered and organized by the Construction Specification Institutes (CSI) Master Format. Standard Specifications shall be used in conjunction with work authorization description and any drawings that may be provided by the Government. Contractor shall use the most recent CSI format as adopted by the federal government. The specifications are provided with the solicitation/contract.
2.3 The project specifications are broad in scope, nature and contain a variety of items. It is not possible to create a comprehensive specification capable of addressing every condition to be encountered. Consequently, the contract specifications are intended to indicate the quality of materials and workmanship to be provided to the Government. In the event that a specific line item description conflicts with the provisions of the specifications provided, the selection of or approval for use of that line item for use in this project does not constitutes a waiver of the specific provision of the specifications with which the description conflicts.
3.0 G OVERNMENT-FURNISHED INFORMATION, EQUIPMENT, MATERIAL, AND PROPERTY (GFI, GFE, GFM, GFP)
The Government will provide information in the form of available plans, reports, maps, drawings, and as-builts as necessary to facilitate accomplishment of the work required in the contract Statement of Work. However, these GFIs are not warranted to show conditions as they actually exist. The designer shall field verify information shown on the as-built drawings for accuracy to ensure technical adequacy of design.
The contractor shall review the following specifics provided:
| Appendix A – Specifications |
| Appendix B – T38 Test Cell Conceptual Drawing |
| Appendix C – Defueling Area Conceptual Drawing |
| Appendix D – Tie Down Detail Drawing |
| Appendix E – Paint Extents Diagram |
| Appendix F – Controlled Area Sign Example |
| Appendix G – Conceptual Sign Panel Diagrams |
4.0 MANAGEMENT, PLANNING, AND REPORTING REQUIREMENTS
The Contractor shall implement a full range of construction and engineering activities in accordance with all applicable compliance documents. The Contractor shall supply all labor, equipment, supervision and materials necessary to accomplish the work assigned unless otherwise specified. The Contractor shall perform management and planning functions, including performance measurement and funds status reporting, through the course of the effort.
4.1 Work Breakdown Structure (WBS)
The Contractor shall prepare and submit, for Government approval, a WBS in a logical sequence in which the Contractor proposes to perform the work and dates on which the Contractor contemplates starting and completing all schedule activities. The WBS shall be reflective of the entire project schedule, to include design and construction activities. The WBS shall be consistent with the Construction Specifications Institute (CSI) Master 2004 format for construction activities. The WBS shall be used to report the cost and schedule status for this project. All tasks required under this SOW shall be included in the WBS and be identified by unique Construction.
4.2 Integrated Master Schedule (IMS)
The initial IMS and AF Form 3064 shall be submitted for approval within 10 business days after contract award for government review, evaluation, and approval on an AF Form 3000. The Government requires the Contractor to prepare the IMS to clearly demonstrate the duration of each phase of the design. The IMS shall include an appropriate level of detail and include all necessary activities, tasks, and subtasks to reflect the actual progress of scope and shall include all major cost/schedule drivers such as design plans, major material submittals and/or long lead-time items, work plans, major construction tasks, and project close-out. The schedule must provide 10 business days for review and approval of all design and construction material submittals. The schedule from the contractor’s accepted proposal shall become the baseline schedule upon contract award until a revised IMS is approved. During subsequent revisions to the IMS, the Government shall use the current baseline schedule to determine acceptability to include the initial schedule from the contractor’s accepted proposal.
The Government shall use the IMS to measure the progress of the work and aid in evaluating all progress payments. The project schedule shall be price loaded with relationships to CSI divisions. The contractor shall progress update the schedule every two weeks. At a minimum, the AF Form 3064 shall be derived from the IMS and be structured by major CSI divisions and assigned appropriate value in relationship to overall work and contract value. The contractor shall submit an AF Form 3065 every month which is derived from the progress updated IMS and commensurate with work performed.
Upon substantial design completion, a re-baselined IMS containing a fully detailed construction phase shall be provided by the Contractor and approved by the Government before a full NTP will be issued by the Contracting Officer. The approved IMS shall not be re-baselined by the contractor without approval by the Government.
The Contractor shall provide for weather delays that prohibit productive construction in their construction schedule.
4.3 Project Schedule
The project schedule shall define the time line of all major activities required to implement the contractor’s action for the project. Phasing of the contractor’s action shall be based upon the coordination and approval of the government. The project schedule shall define all equipment shutdown and re-activation dates. Also, the Contractor shall define the use of any temporary equipment necessary to perform equipment shutdowns. The project schedule shall be presented utilizing a Gantt chart, which shall depict cost loading, start & finish dates, float, and percent complete for each task. The project schedule shall be reported using the approved WBS.
4.4 Meeting and Conference Requirements
The Contractor shall attend meetings necessary to support design coordination, design review, construction activities, etc. The Contractor also shall attend and support weekly meetings and/or teleconferences. The Contractor shall prepare and maintain the weekly meeting report which shall include the record of new and old discussion of technical issues, weekly earned value progress showing percent complete actual versus plan, tabular report of late tasks derived from the progress updated IMS, a two week look ahead, and tabular report for RFIs and submittals (open and upcoming). The Contractor shall prepare, and submit for review, presentation materials for meetings and an agenda. The Contractor shall support “Red Zone Meetings” as part of the closeout of the project. The “Red Zone” shall commence at 80-percent of construction completion. At this meeting, the Contractor and the project stakeholders shall discuss, define, and achieve consensus on actions necessary to complete construction, support user occupancy, perform financial closeout, and document the fiscal closeout of the project in the Real Property Records.
4.5 Contractor Documentation
The Contractor shall maintain a Master Document List (MDL) AF Form 66, that includes all documents, whether the documents are a deliverable or not, which are prepared during the course of the contract. The MDL and its documents shall be maintained in libraries readily available for submittal to the Government. The Government requires 10 business days for review and approval of submittals. All Material Submittals shall be accomplished in accordance with the instructions pertaining to AF Form 3000, Material Approval Submittal.
4.6 Notification Requirements
The Contractor is required to notify the Contracting Officer (CO) and the Project Manager (PM) of critical issues that may affect the contract performance and/or human health and the environment. The types of issues that require notification include, but are not limited to, health risks, spills, changes in critical personnel, and finding unexploded ordnance (UXO). As an example, if UXO were discovered during field activities, the Contractor would be required to immediately stop work, report the discovery to the facility Point of Contact (POC), CO, and COR, and implement the appropriate safety precautions. Field activities could not continue until clearance was received from the CO. On critical issues, verbal notification should be made immediately, followed by written notification as soon as practical.
4.7 Permits
The Contractor shall develop, coordinate, and assist the installation in applying for and obtaining all applicable permits, access (including off-base easements and leases), agreements, licenses, and certificates. The Contractor shall maintain a library of these documents at the Contractor’s site office as well as the corporate facility. The Contractor shall comply with all applicable permit conditions. The Contractor shall include permit activities on the schedule and report status of permit with each design submission.
4.8 Worksite Activities and Coordination
4.8.1 The Contractor shall be responsible for protecting the lives and health of employees and other persons on the work site; preventing damage to property, materials, supplies, and equipment, avoiding work interruptions and complying with Occupational Safety and Health Administration (OSHA) safety and local safety office requirements. The Contractor shall perform all operations in a prudent, conscientious, safe and professional manner and conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work. The Contractor shall maintain documentation supporting training records on site and have written Health and Safety Plans on site and available for workers and/or regulatory review. The Contractor shall provide the CO copies of any OSHA report(s), regarding a project site, submitted during the duration of the contract. For areas not covered by OSHA, the Contractor shall comply with regulations regarding safety and health and the current edition of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. Document can be found at http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx?udt_43544_param_page=2.
The Contractor shall record and report promptly (within 1 hour) by telephone, facsimile or other direct means to the CO, Base Project Manager, and to the military installation’s Safety Office, all available facts relating to each instance of damage to Government property or injury to either contractor or Government personnel. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, preserve evidence until released by the accident/mishap investigative authority through the CO, and immediately report the incident to the Base Fire Department at 911. If the Government elects to conduct an investigation of the accident/mishap, the Contractor shall cooperate fully and assist Government personnel in conducting of the investigation until it is completed.
The Contractor agrees that his personnel and equipment are subject to safety inspections by Government personnel while on federal property.
5.0 PLANS, REPORTS, AND DELIVERABLES
5.1 Health and Safety Plan
The contractor shall provide a Health and Safety Plan in accordance with EM 385-1-1.
5.2 Quality Assurance Plan (QAP)
The Contractor shall prepare, for Government review and acceptance, a site-specific QAP that consists of plans, procedures, and organization necessary to produce an end product which complies with the contract requirements. The QAP shall cover all definable features of work (design and construction operations, both onsite and offsite) and be keyed to the design and construction sequence. The Quality Assurance Plan must indicate the designer’s integral role throughout design and construction. The project superintendent must maintain a physical presence at the site at all times and is responsible for all construction and related activities at the site, except as otherwise acceptable to the Contracting Officer.
The QAP shall provide procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation. The Contractor shall address procedures for tracking design and construction deficiencies from identification through acceptable corrective action and establish verification procedures that identified deficiencies have been corrected.
Acceptance of the Contractor's plan is required prior to the start of design and construction. Acceptance is conditional and will be predicated on satisfactory performance during the design and construction. The Government reserves the right to necessitate the Contractor make changes in the Contractor’s Quality Assurance Plan and operations to obtain the quality specified to meet acceptance by Federal, State, and local regulators or code inspectors.
5.3 Work Plan (Design)
The Contractor shall prepare a design that will adequately meet the requirements stated within this statement of work. Each design submittal package shall include at a minimum the following sections.
5.3.1 Cover Sheet
The cover sheet shall display as a minimum, the following information: Date, Title, Contractor’s Name, Contract Number, Project Number, RFP Number, and Installation or site location. In addition, the cover sheet shall include the Contractor’s mailing address and a minimum of two (primary and alternate) points of contact (POC) for the project. The information of each POC shall include as a minimum: title, telephone number, fax number, and e-mail address.
5.3.2 Executive Summary
The executive summary shall include, but not be limited to: Project location, a brief description, background, and other information that may contribute to general cognizance of the project.
5.3.3 Work Plan Description
The description shall include detailed discussions of the work to be performed including descriptions of the work items to be removed and/or installed, all assumptions, a list of specific codes and standards to which the work will adhere, and all conclusions and recommendations, a list of major equipment, and a description of the major systems.
5.3.4 Method of Work
The work plan shall include a schedule of how the work is to be accomplished; in-house, subcontractor, or factory installed. Each Contractor or factory representative to be used to perform the work defined in the contract shall be listed and described. The list shall also include a brief narrative of the responsibilities and duties of each Contractor and/or factory representative. Provide rationale for why the work is to be performed by the entity proposed (i.e., cost effective, quality, schedule).
5.3.5 Submittal Register
The Submittal Register shall list all drawings, manufacturer’s data, operation and maintenance manuals, etc. as required by the Statement of Work, or Specifications, which will be submitted subsequent to the Work Plan. Each submittal listed shall indicate by section and paragraph, the mode of requirement, (i.e. Statement of Work section and paragraph, Specification section and paragraph, etc.) Each submittal listed shall have all information filled out in its entirety, for each of the data columns on the Submittal Register Form (AF66).
5.3.6 Manufacturer’s Data
Manufacturer’s catalog cuts and specifications shall be submitted as required to document the equipment and materials to be supplied. All catalog cut sheets shall clearly indicate the equipment selection by circling, or marking with an arrow. Also, manufacturer’s installation procedures or execution specifications shall be included as required to indicate the methods and means of installation of all material and equipment. The Contractor shall use the manufacturer’s data to tie together the shop drawings, catalog cuts, and installation requirements into a comprehensive package that defines the contractor’s action.
6.0 SITE WORK
6.1 Conservation
Activities shall be planned and implemented in a manner that protects existing site utilities, structures, surface features, service operations, monitoring and other types of wells, and the general site environment. This includes the protection of trees, shrubs, and other vegetation not in the affected zone from dust damage, soil compaction, and physical contact with machines and equipment. If appropriate, the Contractor shall conserve uncontaminated topsoil by removal, storage, or redistribution. All reasonable measures shall be taken to minimize and suppress fugitive emissions of dust, vapors, and other site materials during site work. All fill materials shall be uncontaminated. The Contractor shall conduct all operations and activities with the intent of reducing the amount of pollution generated. Specific areas to be focused on are generation of solid waste, use of hazardous materials, use of ozone-depleting chemicals, generation of hazardous waste, and use of energy and water. The Contractor shall plan, construct, operate, maintain, optimize, and decommission systems necessary to control storm water run-on and runoff; and transport surface water drainage to a treatment plant, discharge location, or any other destination.
6.2 Site Preparation
The Contractor shall perform site work as necessary to prepare sites for construction activities. Security and access controls shall be implemented to prevent unauthorized entry to sites and to protect wildlife from site exposure. The Contractor shall survey existing conditions to determine adequacy to support site activities. The Contractor shall obtain appropriate approvals and shall construct connections or new systems for electrical power, water, sewer, gas distribution, telephone, and other utilities, as required, to accomplish the activities.
6.3 Demobilization
The Contractor shall demobilize facilities as necessary, and restore the site to its existing condition. The Contractor shall remove any temporary facilities and implement erosion control measures such as seeding, mulching, sodding, and erosion control fabrics; restore roads, structures, and utilities; and plant trees, shrubbery, grasses, and other vegetation to existing conditions. The Contractor shall document and report on activities and train Government personnel to perform required facility equipment operation and maintenance, as requested.
7.0 CONSTRUCTION SERVICES
7.1 Pre-Final Inspection
The Contractor shall conduct a pre-final walk through inspection and publish the pre-final inspection findings in a pre-final inspection report. Commissioning shall be completed prior to the pre-final inspection taking place.
7.2 Final Inspection
The Contractor shall attend a final inspection and publish the findings in a final inspection report in accordance with the format approved by the Contracting Officer. The inspection shall concentrate on the items identified at the pre-final inspection and recorded in the pre-final inspection report. At the final inspection, the Contractor shall present a completed DD Form 1354, Transfer and Acceptance of Real Property to the Base Civil Engineer (BCE) or other appropriate organization for signature and acceptance. The final inspection report shall: (1) certify that all items of the design have been implemented and that the construction is complete, and (2) include a record of “signed and sealed” as-built drawings and specifications verifying that all development standards have been met.
7.3 WARRANTY
The Contractor shall complete all inspection and commissioning requirements prior to pre-final inspection. The warranty shall be issued in accordance with FAR 52.246.21 (Warranty of Construction). Extended warranties offered by the Contractor and its subcontractors or suppliers may be accepted at the Government’s discretion.
//END STATEMENT OF WORK//