AF Form 66

View the file

Other files for this federal contract opportunity

Other files attached to Rec Camp Storage Shed, newest first.
File Type Posted
topt-Rec_Camp_1979.pdf PDF
Original_Elevation.pdf PDF
Site_Visit_Questions_and_Answers.pdf PDF
FA303018Q0016_Amend_1_Rec_Camp_Storage_Shed_(2).pdf PDF
Drawings_JCUU_14-1200.pdf PDF
FY18_SPP_Accounting_Instructions_Final_(2)_Small_Projects.pdf PDF
Wage_Determination_TX336.pdf PDF
NAF_Payment_Instructions.pdf PDF
SKGE_Geotechncial_Report_(WT_3746629).pdf PDF
Statement_of_Work_JCUU_14-1200_17MAY18.pdf PDF
FA303018Q0016_Solicitation_Rec_Camp_Storage_Shed.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

JCGU 14-1200

SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

1 Part 1, 1.6.1, Company Safety Policy and Accident Prevention Plan

4 (a) GA

2 Part 1, 1.11, DD Form 1354 Checklist

4 x (d) GA

3 Part 1, 1.11.1; Part 3, 3.3.2.1, Concrete Slab Design (stamped by structural

4 (a) GA

4 Part 1, 1.12, Warranties

4 (d) GA

5 Part 1, 1.13.1, Contractor Storage

4 (a) GA

6 Part 1, 1.14.1, AF Form 103 Work Clearance Permit, Dig Permit

4 14 Days Prior GA

7 Part 1, 1.14.2, Utility Outages

4 14 Days Prior GA

8 Part 1, 1.14.4.1, AF Form 592 Welding, Cutting, Brazing permit

4 4 (b) or as needed basis

GA

9 Part 1, 1.16, As- Builts

4 (d) GA

PROJECT TITLE

CONSTRUCT NEW REC CAMP STORAGE FACILITY

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL (Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SE

E

P

AR

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION DATE

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

RE

CO

MM

EN

DA

TI

ON

S

MA

NU

FA

CT

UR

ER

'S

W

AR

RA

NT

Y

REMARKS

DATE RECEIVED

IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACTOR RE-

SUBMITTAL

FINAL

APPROVAL

(a) Prior to construction start

(b) Prior to Final Inspection (c) Prior to Use

(d) As Required AF Form 66, SEP 86

PROJECT NUMBER

JCGU 14-1200

SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

PROJECT TITLE

CONSTRUCT NEW REC CAMP STORAGE FACILITY

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL (Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SE

E

P

AR

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION DATE

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

RE

CO

MM

EN

DA

TI

ON

S

MA

NU

FA

CT

UR

ER

'S

W

AR

RA

NT

Y

REMARKS

DATE RECEIVED

IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACTOR RE-

SUBMITTAL

FINAL

APPROVAL

10 Part 2, 2.3, Environmental Form G0104 Environmental

2 (a) GA

11 Part 2, 2.5, AF Form

3952 HAZMAT

Request

2 (d) GA

12 Part 2, 2.5, MSDS 4 (d) GA Part 2, 2.8, Federal Insecticide, Fungicide, and Rodenticide Act certification copies

4 Prior to application of insecticide/ fungicide/ herbicide

13 Part 2, 2.11.5 Diverted Report

4 (d) GA

14 Part 3, 3.3.2.1, Concrete Strength Test

4 (d) GA

15 Part 3, 3.3.2.8, Concrete Mix Design

4 (d) GA

16 Part 3, 3.3.2.5.1 Anchor Plate Shop Drawing

4 4 (a) GA

17 Part 3, 3.3.3.1 Aggregate Compaction Test

4 Prior to conc.

slab

GA

(a) Prior to construction start

(b) Prior to Final Inspection (c) Prior to Use

(d) As Required

PROJECT NUMBER

JCGU 14-1200

SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

PROJECT TITLE

CONSTRUCT NEW REC CAMP STORAGE FACILITY

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL (Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SE

E

P

AR

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION DATE

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

RE

CO

MM

EN

DA

TI

ON

S

MA

NU

FA

CT

UR

ER

'S

W

AR

RA

NT

Y

REMARKS

DATE RECEIVED

IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACTOR RE-

SUBMITTAL

FINAL

APPROVAL

18 Part 3, 3.3.3.3 Termite Spray/ Termite Spray Technician Certification

4 Prior to conc.

slab

GA

19 Part 3, 3.3.3.4 Vapor Barrier

4 (a) GA

20 Part 3, 3.3.3.4 Prefabricated

4 (a) GA

21 Part 3, 3.3.4.1 Metal Siding Color Sample

4 (a) GA

22 Part 3, 3.3.4.6 Metal Roof Color Sample

4 (a) GA

23 Part 3, 3.3.4.7 Metal Gutter, and Downspout Color Sample

4 (a) GA

24 Part 3, 3.3.6.7,

3.3.6.9 Panelboard

with circuit breakers

4 (a) GA

25 Part 3, 3.3.6.10, Grounding resistance measurement

4 (b) GA

26 Part 3, 3.3.7.1, Steel Door

4 (a) GA

27 Part 3, 3.3.7.3, Vehicle Door

4 (a) GA

28 Part 3, 3.3.7.4 Door hardware

4 (a) GA

(a) Prior to construction start

(b) Prior to Final Inspection (c) Prior to Use

(d) As Required

PROJECT NUMBER

JCGU 14-1200

SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

PROJECT TITLE

CONSTRUCT NEW REC CAMP STORAGE FACILITY

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL (Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SE

E

P

AR

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION DATE

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

RE

CO

MM

EN

DA

TI

ON

S

MA

NU

FA

CT

UR

ER

'S

W

AR

RA

NT

Y

REMARKS

DATE RECEIVED

IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACTOR RE-

SUBMITTAL

FINAL

APPROVAL

29 Part 3, 3.3.8.2 Fire Extinguisher

4 (a) GA

30 Part 3, 3.3.8.4 Emergency Lighting

4 (a) GA

31 Part 3, 3.3.9.1, Ventilation Fans/Temp Control

4 (a) GA

32 Part 3, 3.3.11.1 Vinyl Coated Fiber Reinforced Batt Insulation

4 (a) GA

33 Part 3, 3.3.15, Driveway asphalt

4 (d) GA

(a) Prior to construction start

(b) Prior to Final Inspection (c) Prior to Use

(d) As Required

File details come from the government source that posted it.