Form_66_REC_CAMP_STORAGE_FACILITY_(17MAY18).pdf
PDF 107 KB Posted
- Attached to
- Rec Camp Storage Shed Federal contract opportunity
- Solicitation number
- FA303018Q0016
About this file
AF Form 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| topt-Rec_Camp_1979.pdf | ||
| Original_Elevation.pdf | ||
| Site_Visit_Questions_and_Answers.pdf | ||
| FA303018Q0016_Amend_1_Rec_Camp_Storage_Shed_(2).pdf | ||
| Drawings_JCUU_14-1200.pdf | ||
| FY18_SPP_Accounting_Instructions_Final_(2)_Small_Projects.pdf | ||
| Wage_Determination_TX336.pdf | ||
| NAF_Payment_Instructions.pdf | ||
| SKGE_Geotechncial_Report_(WT_3746629).pdf | ||
| Statement_of_Work_JCUU_14-1200_17MAY18.pdf | ||
| FA303018Q0016_Solicitation_Rec_Camp_Storage_Shed.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
JCGU 14-1200
SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
1 Part 1, 1.6.1, Company Safety Policy and Accident Prevention Plan
4 (a) GA
2 Part 1, 1.11, DD Form 1354 Checklist
4 x (d) GA
3 Part 1, 1.11.1; Part 3, 3.3.2.1, Concrete Slab Design (stamped by structural
4 (a) GA
4 Part 1, 1.12, Warranties
4 (d) GA
5 Part 1, 1.13.1, Contractor Storage
4 (a) GA
6 Part 1, 1.14.1, AF Form 103 Work Clearance Permit, Dig Permit
4 14 Days Prior GA
7 Part 1, 1.14.2, Utility Outages
4 14 Days Prior GA
8 Part 1, 1.14.4.1, AF Form 592 Welding, Cutting, Brazing permit
4 4 (b) or as needed basis
GA
9 Part 1, 1.16, As- Builts
4 (d) GA
PROJECT TITLE
CONSTRUCT NEW REC CAMP STORAGE FACILITY
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL (Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SE
E
P
AR
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION DATE
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
ER
'S
W
AR
RA
NT
Y
REMARKS
DATE RECEIVED
IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACTOR RE-
SUBMITTAL
FINAL
APPROVAL
(a) Prior to construction start
(b) Prior to Final Inspection (c) Prior to Use
(d) As Required AF Form 66, SEP 86
PROJECT NUMBER
JCGU 14-1200
SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
CONSTRUCT NEW REC CAMP STORAGE FACILITY
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL (Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SE
E
P
AR
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION DATE
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
ER
'S
W
AR
RA
NT
Y
REMARKS
DATE RECEIVED
IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACTOR RE-
SUBMITTAL
FINAL
APPROVAL
10 Part 2, 2.3, Environmental Form G0104 Environmental
2 (a) GA
11 Part 2, 2.5, AF Form
3952 HAZMAT
Request
2 (d) GA
12 Part 2, 2.5, MSDS 4 (d) GA Part 2, 2.8, Federal Insecticide, Fungicide, and Rodenticide Act certification copies
4 Prior to application of insecticide/ fungicide/ herbicide
13 Part 2, 2.11.5 Diverted Report
4 (d) GA
14 Part 3, 3.3.2.1, Concrete Strength Test
4 (d) GA
15 Part 3, 3.3.2.8, Concrete Mix Design
4 (d) GA
16 Part 3, 3.3.2.5.1 Anchor Plate Shop Drawing
4 4 (a) GA
17 Part 3, 3.3.3.1 Aggregate Compaction Test
4 Prior to conc.
slab
GA
(a) Prior to construction start
(b) Prior to Final Inspection (c) Prior to Use
(d) As Required
PROJECT NUMBER
JCGU 14-1200
SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
CONSTRUCT NEW REC CAMP STORAGE FACILITY
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL (Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SE
E
P
AR
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION DATE
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
ER
'S
W
AR
RA
NT
Y
REMARKS
DATE RECEIVED
IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACTOR RE-
SUBMITTAL
FINAL
APPROVAL
18 Part 3, 3.3.3.3 Termite Spray/ Termite Spray Technician Certification
4 Prior to conc.
slab
GA
19 Part 3, 3.3.3.4 Vapor Barrier
4 (a) GA
20 Part 3, 3.3.3.4 Prefabricated
4 (a) GA
21 Part 3, 3.3.4.1 Metal Siding Color Sample
4 (a) GA
22 Part 3, 3.3.4.6 Metal Roof Color Sample
4 (a) GA
23 Part 3, 3.3.4.7 Metal Gutter, and Downspout Color Sample
4 (a) GA
24 Part 3, 3.3.6.7,
3.3.6.9 Panelboard
with circuit breakers
4 (a) GA
25 Part 3, 3.3.6.10, Grounding resistance measurement
4 (b) GA
26 Part 3, 3.3.7.1, Steel Door
4 (a) GA
27 Part 3, 3.3.7.3, Vehicle Door
4 (a) GA
28 Part 3, 3.3.7.4 Door hardware
4 (a) GA
(a) Prior to construction start
(b) Prior to Final Inspection (c) Prior to Use
(d) As Required
PROJECT NUMBER
JCGU 14-1200
SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
CONSTRUCT NEW REC CAMP STORAGE FACILITY
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL (Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SE
E
P
AR
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION DATE
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
ER
'S
W
AR
RA
NT
Y
REMARKS
DATE RECEIVED
IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACTOR RE-
SUBMITTAL
FINAL
APPROVAL
29 Part 3, 3.3.8.2 Fire Extinguisher
4 (a) GA
30 Part 3, 3.3.8.4 Emergency Lighting
4 (a) GA
31 Part 3, 3.3.9.1, Ventilation Fans/Temp Control
4 (a) GA
32 Part 3, 3.3.11.1 Vinyl Coated Fiber Reinforced Batt Insulation
4 (a) GA
33 Part 3, 3.3.15, Driveway asphalt
4 (d) GA
(a) Prior to construction start
(b) Prior to Final Inspection (c) Prior to Use
(d) As Required