Repair_Sanitary_Sewer_Outfall_AF_Form_66_28_Feb18.pdf

PDF 29 KB Posted

Attached to
Bldgs 300 and 400 Sewer Lines CIPP
Solicitation number
FA303018B0002
Issued by

View the file

Other files

File Type Posted
FA303018B0002-0001.pdf PDF
Heavy_Highway_TX180007.pdf PDF
BAL_Request.pdf PDF
Project_Drawings.pdf PDF
SOW_Attachment_A.pdf PDF
Repair_Sanitary_Sewer_SOW_28_Feb_18.pdf PDF
Insurance_Requirements.pdf PDF
FA303018B0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORM66.xls

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

Written Notification, Utility Outages, para 1.7.3

4 c GA

Written Notification, Sewer Outages, para 1.7.5

4 c GA

Traffic Control Plan, para 1.7.9

4 c GA

DD Form 1354, para 1.10

4 e

As built Drawings, para 1.14

4 e GA

Work Requests, para 1.21 4

Min. 3 days prior c

GA

FFP CIPP System Description, para 2.4

4 b GA

8 Assembly, para 2.5 4 b GA

10 Resin, para 2.5.6 4 b GA

11 Materials, para 2.5.7 4 b GA

Manufacturing Certificate, para 2.5.8

4 b GA

13 Catalyst, para 2.5.9 4 b GA

14 Preparation, para 3.1

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 09-1006

SA

MP

LE

S

PROJECT TITLE: Repair Sanitary Sewer Outfalls

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S

RE

CO

MM

EN

DA

TI

ON

S

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 09-1006

SA

MP

LE

S

PROJECT TITLE: Repair Sanitary Sewer Outfalls

FINAL

APPROVAL

MA

NU

FA

CT

UR

MM

EN

DA

TI

ON

S

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

Bypassing Existing Sewage Flows, para 3.1.3

4 d GA

Pre-TV Inspection, para 3.1.4

4 d GA

Installation of CIPP Liner, para 3.2 4 b GA

18 Curing Logs, para 3.6 4 e GA

Field Quality Control, para 3.10

Testing of CIPP, para 3.11

Testing of Installed FFP, para 3.14

4 e GA

Testing of Installed CIPP, para 3.15

4 e GA

Post-TV Inspection, para 3.13

4 e GA

Repair CIPP, para 3.14

Repair of FFP Defects, para 3.15

4 e GA

Closeout Activities, para 3.17

Post Inspection Documentation, para 3.21.1

4 e GA

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 09-1006

SA

MP

LE

S

PROJECT TITLE: Repair Sanitary Sewer Outfalls

FINAL

APPROVAL

MA

NU

FA

CT

UR

MM

EN

DA

TI

ON

S

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

BCE Work Request, para 4.1.1

4 c GA

Hazardous Waste Manifest, para 5.3

4 c GA

30 Pesticides, para 5.8 4 c GA

Drinking Water, para 5.10

4 c GA

Solid Waste Disposal Report, para 5.12.1

4 c GA

AF Form 66

(a) As soon as possible but no later than 7 calendar days from NTP.

(b) Within 21 calendar days of NTP.

(c ) Prior to Use.

(d) Within 60 calendar days of NTP.

(e ) Final Inspection.

Sheet1

File details come from the government source that posted it.