Repair_Sanitary_Sewer_Outfall_AF_Form_66_28_Feb18.pdf
PDF 29 KB Posted
- Attached to
- Bldgs 300 and 400 Sewer Lines CIPP
- Solicitation number
- FA303018B0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA303018B0002-0001.pdf | ||
| Heavy_Highway_TX180007.pdf | ||
| BAL_Request.pdf | ||
| Project_Drawings.pdf | ||
| SOW_Attachment_A.pdf | ||
| Repair_Sanitary_Sewer_SOW_28_Feb_18.pdf | ||
| Insurance_Requirements.pdf | ||
| FA303018B0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORM66.xls
SCHEDULE OF MATERIAL SUBMITTALS
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
Written Notification, Utility Outages, para 1.7.3
4 c GA
Written Notification, Sewer Outages, para 1.7.5
4 c GA
Traffic Control Plan, para 1.7.9
4 c GA
DD Form 1354, para 1.10
4 e
As built Drawings, para 1.14
4 e GA
Work Requests, para 1.21 4
Min. 3 days prior c
GA
FFP CIPP System Description, para 2.4
4 b GA
8 Assembly, para 2.5 4 b GA
10 Resin, para 2.5.6 4 b GA
11 Materials, para 2.5.7 4 b GA
Manufacturing Certificate, para 2.5.8
4 b GA
13 Catalyst, para 2.5.9 4 b GA
14 Preparation, para 3.1
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 09-1006
SA
MP
LE
S
PROJECT TITLE: Repair Sanitary Sewer Outfalls
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
SCHEDULE OF MATERIAL SUBMITTALS
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 09-1006
SA
MP
LE
S
PROJECT TITLE: Repair Sanitary Sewer Outfalls
FINAL
APPROVAL
MA
NU
FA
CT
UR
MM
EN
DA
TI
ON
S
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
Bypassing Existing Sewage Flows, para 3.1.3
4 d GA
Pre-TV Inspection, para 3.1.4
4 d GA
Installation of CIPP Liner, para 3.2 4 b GA
18 Curing Logs, para 3.6 4 e GA
Field Quality Control, para 3.10
Testing of CIPP, para 3.11
Testing of Installed FFP, para 3.14
4 e GA
Testing of Installed CIPP, para 3.15
4 e GA
Post-TV Inspection, para 3.13
4 e GA
Repair CIPP, para 3.14
Repair of FFP Defects, para 3.15
4 e GA
Closeout Activities, para 3.17
Post Inspection Documentation, para 3.21.1
4 e GA
SCHEDULE OF MATERIAL SUBMITTALS
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 09-1006
SA
MP
LE
S
PROJECT TITLE: Repair Sanitary Sewer Outfalls
FINAL
APPROVAL
MA
NU
FA
CT
UR
MM
EN
DA
TI
ON
S
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
BCE Work Request, para 4.1.1
4 c GA
Hazardous Waste Manifest, para 5.3
4 c GA
30 Pesticides, para 5.8 4 c GA
Drinking Water, para 5.10
4 c GA
Solid Waste Disposal Report, para 5.12.1
4 c GA
AF Form 66
(a) As soon as possible but no later than 7 calendar days from NTP.
(b) Within 21 calendar days of NTP.
(c ) Prior to Use.
(d) Within 60 calendar days of NTP.
(e ) Final Inspection.
Sheet1
File details come from the government source that posted it.