FA3030-15-R-0096_Western_Wineds_Renovation.pdf

PDF 969 KB Posted

Attached to
Western Winds (B. 334) Renovation Federal contract opportunity
Solicitation number
FA3030-15-R-0096
Issued by
Department of the Air Force Air Education and Training Command

About this file

FA3030-15-R-0096 Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Western Winds (B. 334) Renovation, newest first.
File Type Posted
FA3030-15-R-0096-0005.pdf PDF
FA3030-15-R-0096-0004.pdf PDF
Update_Specs_28Aug15.pdf PDF
Questions.pdf PDF
Update_Specs_26Aug15.pdf PDF
Questions_and_Answers.pdf PDF
Attachment_6_Crawlspace_Photos.pdf PDF
Attachment_7_18_Aug_15_Contractor_Sign_in_Sheet.pdf PDF
FA3030-15-R-0096-0003.pdf PDF
Drawing_Update_Pg_89.pdf PDF
Attachment__5_Crawlspace_Photos.pdf PDF
FA3030-15-R-0096-0002.pdf PDF
Attachment__6_18_Aug_Contractor_Sign_in_Sheet.pdf PDF
FA3030-15-R-0096-0001.pdf PDF
8766-0198_100__Sealed_GAFB_WW_DFAC_(FINAL_FOR_PRINT).pdf PDF
Past_Performance_Questionnaire.pdf PDF
100__Submittal_Register.pdf PDF
Western_Winds_Specs.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F1Z3125049A001

ENTER PRICES IN SECTION B, TYPE OR USE BLACK INK.

This acquisition is a 100% Small Business Set Aside.

The NAICS for this acquisition is 236220; the Small Business Size Standard is $36.5 Million.

The magnitude of this project is betw een $1 million and $5 million.

Verbal explanations given before aw ard WILL NOT BE BINDING. Any authorized changes must be made in w riting by issusing amendment(s).

Offeror(s) shall acknow ledge receipt of amendment(s) in block 19 of SF 1442 or by returning a signed copy of the amendment(s) w ith their offer.

“Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No aw ard w ill be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”

ERICK T. SHRIVER (325) 654-4420

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

03-Aug-2015

(RFP)

(IFB)

X

CALL:

Western Winds Renovation

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________03 Sep 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______100 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

17TH CONTRACTING SQUADRON -FA3030

210 SCHERZ BLVD

JOHN.HEBDON@US.AF.MIL

GOODFELLOW AFB TX 76908-4705

FA3030

PAGE OF PAGES

1 OF

CODE FA3030

(Title, identifying no., date):

12B. CALENDAR DAYS

01:30 PM (hour)

Sealed envelopes containing offers

17TH CONTRACTING SQUADRON -FA3030

210 SCHERZ BLVD

ERICK.SHRIVER.1@US.AF.MIL

GOODFELLOW AFB TX 76908-4705

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

JCGU-11-1007

8. ADDRESS OFFER TO (If Other Than Item 7)

(325) 654-5149FAX:TEL: (325) 654-5174 TEL: (325) 654-4420 FAX: (325) 654-5149

FA3030-15-R-0096 61

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA3030-15-R-0096

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Phase 1: Cressman Temporary Construction

FFP

Phase 1: Cressman Temporary Construction as described in the plans and specifications.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

PURCHASE REQUEST NUMBER: F1Z3125049A001

SIGNAL CODE: A

NET AMT

0001AA 1 Each Phase 1: Cressman Temporary Construction

FFP

Phase 1: Cressman Temporary Construction as described in the plans and specifications. The Contractor shall perform all temporary facility erection/installation/operation, provide temporary heating/cooling, and temportary electrical/power

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

0001AB 10 Months Phase 1: Cressman Temporary Construction

FFP

Phase 1: Cressman Temporary Construction as described in the plans and specifications. Maintain/repair all temporary facilities during the entire duration of this contract.

FOB: Destination

Phase 2: Moving and storage for Relocate

FFP

Phase 2: Moving and storage for relocation to Cressman from Western Winds as described in the plans and specifications.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

0002AA 1 Each Phase 2: Moving

FFP

Phase 2: Moving for relocation to Cressman from Western Winds as described in the plans and specifications.

FOB: Destination

0002AB 9 Months Phase 2: Storage

FFP

Phase 2: Storage for relocation to Cressman from Western Winds as described in the plans and specifications.

FOB: Destination

0003 1 Each Phase 3: Renovate Western Winds

FFP

Phase 3: Renovate Western Winds as described in the plans and specifications. All

Phase 3 work being performed concurrently.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

0004 360 Square

Foot

Phase 3: Repair below Slab/Crawl

FFP

Phase 3: Repair below Slab/Crawl Space Structural Framing as described in the plans and specifications. All below slab structural concrete work. All Phase 3 work being performed concurrently.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

0005 200 Linear

Phase 3: Crawl Space Repair

Phase 3: Crawl Space Repair Metal Deck as described in the plans and specifications. All Phase 3 work being performed concurrently.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

0006 20 Square

Phase 3: Crawl Space Repair Girder

Phase 3: Crawl Space Repair Girder Connections as described in the plans and specifications. All Phase 3 work being performed concurrently.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

0007 2 Each Phase 3: Crawl Space Bar Joists

FFP

Phase 3: Crawl Space Bar Joists as described in the plans and specifications. All

Phase 3 work being performed concurrently.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

0008 10 Each Phase 3: Crawl Space Repair Lighting

FFP

Phase 3: Crawl Space Repair Lighting as described in the plans and specifications.

All Phase 3 work being performed concurrently.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

0009 1 Each Phase 3: Replace Kitchen Oven Exhaust

FFP

Phase 3: Replace Kitchen Oven Exhaust Hoods as described in the plans and specifications. All Phase 3 work being performed concurrently.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

0010 1 Each Phase 4: Return to Western Winds

FFP

Phase 4: Return to Western Winds from Cressman as described in the plans and specifications. All Phase 4 work being performed concurrently.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

0011 1 Each Phase 4: Provide Parking Lot Lighting

FFP

Phase 4: Provide New Parking Lot Lighting as described in the plans and specifications. All Phase 4 work being performed concurrently.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

0012 1 Each OPTION Phase 3: Provide Walk-in Cooler Equip

FFP

Phase 3: Provide Walk-in Cooler Equipment as described in the plans and specifications. All Phase 3 work being performed concurrently.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

0013 1 Each OPTION Phase 3: Construct Walk-in Cooler

FFP

Phase 3: Construct Walk-in Cooler Enclosure as described in the plans and specifications. All Phase3 wrok being performed concurrently.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

0014 1 Each OPTION Phase 3: Complete roof spud repair

FFP

Phase 3: Complete roof spud repair as described in the plans and specifications.

All Phase 3 work being performed concurrently.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

0015 1 Each OPTION Phase 3: Provide Interior Finishes

FFP

Phase 3: Provide Interior Finishes as described in the plans and specifications. All

Phase 3 work being performed concurrently.

FOB: Destination

NSN: Z2FD-RE-PDI-NFAC

Section C - Descriptions and Specifications

SPECIFICATIONS LOCATION

Specifications are located in Section J by reference.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0001AA Destination Government Destination Government

0001AB Destination Government Destination Government

0002 Destination Government Destination Government

0002AA Destination Government Destination Government

0002AB Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

0005 Destination Government Destination Government

0006 Destination Government Destination Government

0007 Destination Government Destination Government

0008 Destination Government Destination Government

0009 Destination Government Destination Government

0010 Destination Government Destination Government

0011 Destination Government Destination Government

0012 Destination Government Destination Government

0013 Destination Government Destination Government

0014 Destination Government Destination Government

0015 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-12 Inspection of Construction AUG 1996

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 N/A N/A N/A N/A

0001AA 80 dys. ADC 1 17 CES/CERF - F1Z312

RORIE J. WOODROW

17 CES/CERF

GOODFELLOW AFB TX 76908

325-654-3438

FOB: Destination

F1Z312

0001AB 10 mths. ADC 10 (SAME AS PREVIOUS LOCATION)

0002 N/A N/A N/A N/A

0002AA 30 dys. ADC 1 17 CES/CERF - F1Z312

RORIE J. WOODROW

17 CES/CERF

GOODFELLOW AFB TX 76908

325-654-3438

0002AB 9 mths. ADC 9 (SAME AS PREVIOUS LOCATION)

0003 180 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0004 180 dys. ADC 360 (SAME AS PREVIOUS LOCATION)

0005 180 dys. ADC 200 (SAME AS PREVIOUS LOCATION)

0006 180 dys. ADC 20 (SAME AS PREVIOUS LOCATION)

0007 180 dys. ADC 2 (SAME AS PREVIOUS LOCATION)

0008 180 dys. ADC 10 (SAME AS PREVIOUS LOCATION)

0009 180 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0010 30 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0011 30 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0012 180 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0013 180 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0014 180 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0015 180 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

52.211-13 Time Extensions SEP 2000

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 days of notice to proceed.

(b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 days after notice to proceed. Each phase will have its own notice to proceed and performance period as shown below. The time stated for completion shall include final cleanup of the premises.

Notice to Proceed will be issued for each phase of this project.

Phase I – Construction 80 calendar days/Maintenance for the duration of the contract

Phase II – 30 calendar days for furniture movement/Storage for the duration of Phase III

Phase III – 180 calendar days

Phase IV – 30 calendar days

The government will have a transition period of 15 calendar days after Phase I, II, and III. Total expected time for completion of this project is 365 days.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $732.00 for the first day and $153.00 every day after until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the

Termination clause.

Section G - Contract Administration Data

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area

WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training

Course and use the Practice Training Site before submitting payment requests through

WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data

Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

CONSTRUCTION INVOICE

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in

WAWF, as specified by the contracting officer.

GOODFELLOW AFB, TX.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC F67100

Issue By DoDAAC FA3030

Admin DoDAAC FA3030

Inspect By DoDAAC FA3030 PLUS SIX EXTENSION F1Z312

Ship To Code ____

Ship From Code FA3030

Mark For Code ____

Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) ____

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send

Additional Email Notifications” field of WAWF once a document is submitted in the system.

Contract Administrator: sharon.krywinski@us.af.mil

Contract Administrator: erick.shriver.1@us.af.mil

Contracting Officer: john.hebdon@us.af.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Additional Point of Contact: nicholas.fisher@us.af.mil

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

mailto:sharon.krywinski@us.af.mil mailto:erick.shriver.1@us.af.mil mailto:john.hebdon@us.af.mil mailto:nicholas.fisher@us.af.mil

Section H - Special Contract Requirements

CONTRACT INSURANCE CERTIFICATE

REQUIRED INSURANCE (IAW FAR 28.306(b) and 28.307)

Reference Contract Clause 52.228-5 entitled "Insurance – Work on a Government Installation" the contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under this contract:

(a) Workers’ compensation and employer’s liability. Contractors are required to comply with applicable Federal and State workers’ compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in

States with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)

(b) General liability.

(1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.

(2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.

(c) Automobile liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

Notification of Compliance with Contract Insurance Requirements

Contract No:

The undersigned Contractor hereby acknowledges that he/she has read and understands the insurance requirements specified in this contract and hereby provides notification (1) that such insurance shall be maintained in at least the amounts and types as stated in FAR 28.307-2 and during any modifications and/or time extensions granted thereto;

(2) that the required insurance policies shall contain an endorsement to the effect that any cancellation of material changes adversely affecting the Government's interest shall not be effective for such period as the laws of the State in which this contract is to be performed prescribe, or until thirty (30) calendar days after the insurer or contractor gives written notice to the Contracting Officer, whichever period is longer; (3) that _____________ (state) Workers'

Compensation Insurance, or letter of reciprocal agreement with another state, shall be maintained on this contract for and during the entire performance period and for any modifications and/or time extensions granted thereto; and

(4) that a copy of all subcontractors' proofs of required insurance shall be maintained and shall be made available to the Contracting Officer upon request. This agreement shall be a part of subject contract and shall be legally binding and enforceable at law.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/28.htm#P360_59521

INSURANCE COMPANY(S):

Name:

Address:

Policy #:

Telephone #:

CONTRACTOR:

Company Name:

Address:

(Typed Name and Title) (Date)

(Authorized Signature)

Section I - Contract Clauses

52.202-1 Definitions NOV 2013

52.203-3 Gratuities APR 1984

52.203-5 Covenant Against Contingent Fees MAY 2014

52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006

52.203-7 Anti-Kickback Procedures MAY 2014

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014

52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

APR 2014

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-13 System for Award Management Maintenance JUL 2013

52.204-14 Service Contract Reporting Requirements JAN 2014

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

AUG 2013

52.209-10 Prohibition on Contracting With Inverted Domestic

Corporations

DEC 2014

52.215-2 Audit and Records--Negotiation OCT 2010

52.215-8 Order of Precedence--Uniform Contract Format OCT 1997

52.217-7 Option For Increased Quantity-Separately Priced Line Item MAR 1989

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011

52.219-8 Utilization of Small Business Concerns OCT 2014

52.219-14 Limitations On Subcontracting NOV 2011

52.222-3 Convict Labor JUN 2003

52.222-4 Contract Work Hours and Safety Standards- Overtime

Compensation

MAY 2014

52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.222-6 Construction Wage Rate Requirements MAY 2014

52.222-7 Withholding of Funds MAY 2014

52.222-8 Payrolls and Basic Records MAY 2014

52.222-9 Apprentices and Trainees JUL 2005

52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) MAY 2014

52.222-12 Contract Termination-Debarment MAY 2014

52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988

52.222-15 Certification of Eligibility MAY 2014

52.222-21 Prohibition Of Segregated Facilities APR 2015

52.222-26 Equal Opportunity APR 2015

52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-35 Equal Opportunity for Veterans JUL 2014

52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014

52.222-37 Employment Reports on Veterans JUL 2014

52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons MAR 2015

52.222-55 Minimum Wages Under Executive Order 13658 DEC 2014

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011

52.223-6 Drug-Free Workplace MAY 2001

52.223-12 Refrigeration Equipment and Air Conditioners MAY 1995

52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.227-1 Authorization and Consent DEC 2007

52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.227-4 Patent Indemnity-Construction Contracts DEC 2007

52.228-2 Additional Bond Security OCT 1997

52.228-5 Insurance - Work On A Government Installation JAN 1997

52.228-11 Pledges Of Assets JAN 2012

52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014

52.228-14 Irrevocable Letter of Credit NOV 2014

52.228-15 Performance and Payment Bonds--Construction OCT 2010

52.229-3 Federal, State And Local Taxes FEB 2013

52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014

52.232-17 Interest MAY 2014

52.232-18 Availability Of Funds APR 1984

52.232-23 Assignment Of Claims MAY 2014

52.232-27 Prompt Payment for Construction Contracts MAY 2014

52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014

52.233-3 Protest After Award AUG 1996

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.236-2 Differing Site Conditions APR 1984

52.236-3 Site Investigation and Conditions Affecting the Work APR 1984

52.236-5 Material and Workmanship APR 1984

52.236-6 Superintendence by the Contractor APR 1984

52.236-7 Permits and Responsibilities NOV 1991

52.236-8 Other Contracts APR 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984

52.236-11 Use and Possession Prior to Completion APR 1984

52.236-12 Cleaning Up APR 1984

52.236-13 Accident Prevention NOV 1991

52.236-14 Availability and Use of Utility Services APR 1984

52.236-15 Schedules for Construction Contracts APR 1984

52.236-17 Layout of Work APR 1984

52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -

Alternate I

APR 1984

52.236-26 Preconstruction Conference FEB 1995

52.242-13 Bankruptcy JUL 1995

52.242-14 Suspension of Work APR 1984

52.243-4 Changes JUN 2007

52.244-5 Competition In Subcontracting DEC 1996

52.244-6 Subcontracts for Commercial Items APR 2015

52.246-21 Warranty of Construction MAR 1994

52.248-3 Value Engineering-Construction OCT 2010

52.249-2 Alt I Termination for Convenience of the Government (Fixed-

Price) (Apr 2012) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984

52.253-1 Computer Generated Forms JAN 1991

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-

Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of

Terrorism

DEC 2014

252.223-7001 Hazard Warning Labels DEC 1991

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.225-7012 Preference For Certain Domestic Commodities FEB 2013

252.227-7033 Rights in Shop Drawings APR 1966

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006

252.236-7000 Modification Proposals-Price Breakdown DEC 1991

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.243-7002 Requests for Equitable Adjustment DEC 2012

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JULY 2013)

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts--

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The

Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the

Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in

SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it ( ) is, ( ) is not a small business concern under NAICS Code - assigned to contract number .

(Contractor to sign and date and insert authorized signer's name and title).

52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the

Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the

Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars) \1\

Item 1

Foreign construction material.... ........... ___ ........ ....... ………. ___ ................ ........ ___

Domestic construction material... ........ ___ ............... .............. ___ .................. ...... ___

Item 2

Foreign construction material.... ......... ___ ............. ........ ……. ___ ............... ......... ___

Domestic construction material... ....... ___ .................. ............. ___ ................. ....... ___

Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by the National Weather Service.

(b) Weather conditions

Average Monthly High & Low Temperatures

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

59/30 71/36 74/44 82/50 91/61 97/72 96/69 93/69 85/58 80/50 71/39 64/33

Historical Average Monthly Rainfall

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

0.82 1.18 0.99 1.60 3.09 2.52 1.10 2.05 2.95 2.57 1.10 0.94

(c) Transportation facilities: NONE.

(d) NONE

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/ FAR Site http://farsite.hill.af.mil/vfdfara.htm DFARS Site http://farsite.hill.af.mil/vfaffara.htm AFFARS Site

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Department of Defense Federal Acquisition Regulation

Supplement (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of

"(DEVIATION)" after the name of the regulation.

252.204-7006 BILLING INSTRUCTIONS (OCT 2005)

When submitting a request for payment, the Contractor shall--

(a) Identify the contract line item(s) on the payment request that reasonably reflect contract work performance; and

(b) Separately identify a payment amount for each contract line item included in the payment request.

http://farsite.hill.af.mil/ http://farsite.hill.af.mil/vfdfara.htm http://farsite.hill.af.mil/vfaffara.htm

252.204-7012 SAFEGUARDING OF UNCLASSIFIED CONTROLLED TECHNICAL INFORMATION (NOV

2013)

Adequate security means protective measures that are commensurate with the consequences and probability of loss, misuse, or unauthorized access to, or modification of information.

Attribution information means information that identifies the Contractor, whether directly or indirectly, by the grouping of information that can be traced back to the Contractor (e.g., program description or facility locations).

Compromise means disclosure of information to unauthorized persons, or a violation of the security policy of a system, in which unauthorized intentional or unintentional disclosure, modification, destruction, or loss of an object, or the copying of information to unauthorized media may have occurred.

Contractor information system means an information system belonging to, or operated by or for, the Contractor.

Controlled technical information means technical information with military or space application that is subject to controls on the access, use, reproduction, modification, performance, display, release, disclosure, or dissemination.

Controlled technical information is to be marked with one of the distribution statements B-through-F, in accordance with DoD Instruction 5230.24, Distribution Statements on Technical Documents. The term does not include information that is lawfully publicly available without restrictions.

Cyber incident means actions taken through the use of computer networks that result in an actual or potentially adverse effect on an information system and/or the information residing therein.

Exfiltration means any unauthorized release of data from within an information system. This includes copying the data through covert network channels or the copying of data to unauthorized media.

Media means physical devices or writing surfaces including, but is not limited to, magnetic tapes, optical disks, magnetic disks, large-scale integration memory chips, and printouts onto which information is recorded, stored, or printed within an information system.

Technical information means technical data or computer software, as those terms are defined in the clause at

DFARS 252.227-7013, Rights in Technical Data--Non Commercial Items, regardless of whether or not the clause is incorporated in this solicitation or contract. Examples of technical information include research and engineering data, engineering drawings, and associated lists, specifications, standards, process sheets, manuals, technical reports, technical orders, catalog-item identifications, data sets, studies and analyses and related information, and computer software executable code and source code.

(b) Safeguarding requirements and procedures for unclassified controlled technical information. The Contractor shall provide adequate security to safeguard unclassified controlled technical information from compromise. To provide adequate security, the Contractor shall—

(1) Implement information systems security in its project, enterprise, or company-wide unclassified information technology system(s) that may have unclassified controlled technical information resident on or transiting through them. The information systems security program shall implement, at a minimum—

(i) The specified National Institute of Standards and Technology (NIST) Special Publication (SP) 800-53 security controls identified in the following table; or

(ii) If a NIST control is not implemented, the Contractor shall submit to the Contracting Officer a written explanation of how—

(A) The required security control identified in the following table is not applicable; or

(B) An alternative control or protective measure is used to achieve equivalent protection.

(2) Apply other information systems security requirements when the Contractor reasonably determines that information systems security measures, in addition to those identified in paragraph (b)(1) of this clause, may be required to provide adequate security in a dynamic environment based on an assessed risk or vulnerability.

Table 1--Minimum Security Controls for Safeguarding

Minimum required security controls for unclassified controlled technical information requiring safeguarding in accordance with paragraph (d) of this clause. (A description of the security controls is in the NIST SP 800-53, ``Security and Privacy Controls for Federal Information Systems and Organizations''

(http://csrc.nist.gov/publications/PubsSPs.html).)

Access Control

AC-2

AC-3(4)

AC-4

AC-6

AC-7

AC-11(1)

AC-17(2)

AC-18(1)

AC-19

AC-20(1)

AC-20(2)

AC-22

Audit &

Accountability

AU-2

AU-3

AU-6(1)

AU-7

AU-8

AU-9

Identification and

Authentication

IA-2

IA-4

IA-5(1)

Media Protection

MP-4

MP-6

System & Comm

Protection

SC-2

SC-4

SC-7

SC-8(1)

SC-13

SC-15

SC-28

Physical and

Environmental

Protection

PE-2

PE-3

PE-5

Incident

Response

IR-2

IR-4

IR-5

IR-6

Configuration

Management

CM-2

CM-6

CM-7

CM-8

Program Management

PM-10

System &

Information

Integrity

SI-2

SI-3

SI-4

Maintenance

MA-4(6)

MA-5

MA-6

Risk Assessment

RA-5

Awareness &

Training

AT-2

Contingency

Planning

CP-9

Legend:

AC: Access Control

AT: Awareness and Training MP:

AU: Auditing and Accountability

CM: Configuration Management

CP: Contingency Planning

IA: Identification and Authentication

IR: Incident Response

MA: Maintenance

MP: Media Protection

PE: Physical & Environmental Protection http://csrc.nist.gov/publications/PubsSPs.html)

PM: Program Management

RA: Risk Assessment

SC: System & Communications Protection

SI: System & Information Integrity

(c) Other requirements. This clause does not relieve the Contractor of the requirements specified by applicable statutes or other Federal and DoD safeguarding requirements for Controlled Unclassified

Information as established by Executive Order 13556, as well as regulations and guidance established pursuant thereto.

(d) Cyber incident and compromise reporting.

(1) Reporting requirement. The Contractor shall report as much of the following information as can be obtained to the Department of Defense via (http://dibnet.dod.mil/) within 72 hours of discovery of any cyber incident, as described in paragraph (d)(2) of this clause, that affects unclassified controlled technical information resident on or transiting through the Contractor's unclassified information systems:

(i) Data Universal Numbering System (DUNS).

(ii) Contract numbers affected unless all contracts by the company are affected.

(iii) Facility CAGE code if the location of the event is different than the prime Contractor location.

(iv) Point of contact if different than the POC recorded in the System for Award Management (address, position, telephone, email).

(v) Contracting Officer point of contact (address, position, telephone, email).

(vi) Contract clearance level.

(vii) Name of subcontractor and CAGE code if this was an incident on a subcontractor network.

(viii) DoD programs, platforms or systems involved.

(ix) Location(s) of compromise.

(x) Date incident discovered.

(xi) Type of compromise (e.g., unauthorized access, inadvertent release, other).

(xii) Description of technical information compromised.

(xiii) Any additional information relevant to the information compromise.

(2) Reportable cyber incidents. Reportable cyber incidents include the following:

(i) A cyber incident involving possible exfiltration, manipulation, or other loss or compromise of any unclassified controlled technical information resident on or transiting through Contractor's, or its subcontractors', unclassified information systems.

(ii) Any other activities not included in paragraph (d)(2)(i) of this clause that allow unauthorized access to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .