02310 Compaction.doc
DOC document 28 KB Posted
- Attached to
- PAVEMENTS IDIQ Federal contract opportunity
- Solicitation number
- FA3030-09-R-0006-Solicitation
About this file
Specifications - 02310 Compaction
View the file
Other files for this federal contract opportunity
Show all 50
PAVEMENTS IDIQ has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Pavements IDIQ
JCGU 09-1700
DIVISION 02 - SITEWORK
SECTION 02310 - COMPACTION OF EXISTING BASE MATERIAL
PART 1 – GENERAL:
1.1 SUMMARY
This Section will be used in the event that a layer of asphalt cement has been removed and it is the Contracting Officer’s intent to reuse the base course materials.
1.2 INITIAL SAMPLING AND TESTING:
One sampling and test must be accomplished to determine CE 55 (refer to Specification SECTION 02241, paragraph 3.3.3) density for each 50 square yards of base material in place, or as required by the Task Order. This should include determining that the depth of the base material is at least 6 inches.
PART 2 – MATERIALS:
All materials are existing. If the case arises when new base course is needed to repair areas identified by the Contracting Officer or his designated representative the appropriate line items and quantities will included in the respective Task Order.
PART 3 – EXECUTION:
3.1 COMPACTION AND QUALITY CONTROL:
Compaction should follow the method in Specification SECTION 02241. All areas of Field Quality Control, Traffic, and Maintenance should also be followed per SECTION 02241.
END OF SECTION
Section 02310 – Page 1 of 1