FA302223Q0308 - Fiber Optic cable Installation ITB 230 to Bldg.99 Page 1 Questions and Answers

Questions Answers Due to the regulations that cable can only be routed in a building a maximum of 50 ft from the building entrance point before it has to be transitioned to an appropriately rated inside plant cable, can contractors use both Indoor and outdoor ISP?

Statement is industry standard.

SOW (2.2.2.2) revised to allow Indoor/Outdoor FOC that can go past the 50 ft.

Have any of the conduits been scoped? N/A

Are there any pull strings? Assumed to be (per CVC records)

What are the options for the contractor regarding power supply, are there any outlets near the sites, and if so, are the contractors authorized to use them.

Electrical outlets interior/exterior are available where nearby area of work. Other locations (no bldg. nearby) will require contractor provided generators.

What are the standards regarding butterfly drawings, are there any markings, or information we need to add to the drawings.

Standards vary.

Does the maintenance loops referenced at section

2.2.17 of the SOW have to be 50ft or can it be if needed.

50 ft minimum.