Statement of Need
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_2018_WOC_Latrine_SON_v.2.pdf | ||
| Oral_Solicitation_Air_Show_Porta_Johns.pdf | ||
| Attachment_2-Wage_Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF NEED
RENTAL OF PORTABLE LATRINES
COLUMBUS AFB, MISSISSIPPI
2 APR 2018
1.1 This Statement of Need (S.O.N.) defines the scope of work to accomplish the rental of portable latrine units for the 2018 “Wings over Columbus” Air Show event at Columbus AFB. The contractor shall provide all labor, materials, equipment, management, supervision, coordination and transportation required to accomplish this work.
1.2 WORK SCHEDULE, PLANS AND WORKING HOURS: Work days for this contract will be Friday, 20 April 2018 thru Monday, 23 April 2018. The airfield will be available for the placement of units beginning at 1000 hours (10:00 AM) on Friday, 20 April 2018. The contractor shall have all units removed prior to 1000 hours (10:00 AM) on Monday, 23 Apr 2018. The contractor shall not begin any work until he/she is 100% material complete. Written permission from the Contracting Officer (CO) or Contracting Officer’s Representative (COR) must be obtained for any deviation from the approved schedule.
1.3 AVAILABILITY OF UTILITY SERVICES: All reasonable quantities of utilities will be made available to the contractor. The government shall not be held responsible for interruptions of utility services, and will not be liable for contractor delays, damages, or increased cost incurred by any such interruption of service. The contractor shall be responsible for providing all labor, equipment, and materials to make necessary temporary utility connections. The temporary connections shall be coordinated with the Government Representative before being made and shall be removed upon project completion.
1.4 CLEAN-UP: All debris and rubbish not specified to become government property resulting from service will be disposed of by the contractor off government property. Disposal will be in compliance with federal, state, and local hauling and disposal regulations. Site clean-up shall be daily.
1.5 SAFETY REQUIREMENTS: Safety requirement shall be the applicable sections of EM 385-1-1, Oct
1992 and Occupational Safety and Health Administration (OSHA) Regulations. OSHA regulations are available for review at the Base Safety Office, Building 724. EM 385-1-1 is available for reference in the Maintenance Engineering Office, Building 385.
1.6 SITE CONDITIONS: The contractor acknowledges satisfaction as to the nature and location of the work, the general and local conditions, access to job site; disposal, handling and storage of materials;
availability of water, electric power or similar physical conditions at CAFB; the character of equipment and facilities needed preliminary to and during the performance of the work; and all other matters that can in any way affect the work or the cost thereof under this contract. The contractor acknowledges that any damage to the existing landscaping or facilities in the area will be returned to its original condition prior to the completion of subject work at no additional cost to the government.
END OF SECTION
TECHNICAL – PART II
2.1 The contractor shall provide the quantity of units requested with each being serviced once per day during the event (approximately 1300 hours (1:00 PM)) and once after the events ending on Saturday, 21 April 2018 and prior to 0900 hours (9:00 AM) on Sunday, 22 April 2018 (3 servicing total: 1 mid-day Saturday, 1 between event days, 1 mid-day Sunday). The contractor shall provide service throughout the two-day event for the replenishing of supplies, i.e. paper towel, bathroom tissue, and soap ensuring supplies so not diminish. The units shall meet the following descriptions or be an equivalent approved by the CO or COR:
2.2.1 The contractor shall provide seventy five (75) standard latrine units. The units shall be modern polyethylene non-flushing units with holding tank, separate urinal, and bathroom tissue dispenser.
2.2.2 The contractor shall provide ten (10) handicap accessible latrine units. The units shall be ground level floor accessible, non-flushing units with holding tank and bathroom tissue dispenser.
2.2.3 The contractor shall provide twelve (12) hand-washing stations. The units shall be complete with soap, paper towel dispensers, and foot-pedal operation for the sink. Each station shall be able to serve two persons simultaneously.
2.2.4 The contractor shall provide two (2) VIP latrine units. The unit shall have a flushing toilet, foot-pedal operated sink, mirror, interior light, bathroom tissue dispenser, paper towel dispenser, and soap dispenser. The units shall support an estimated 550 VIP guests over the event duration.
2.2 Estimated daily attendance for Saturday and Sunday, 21-22 April, 2018 is 20,000 persons.
2.3 Locations and placement of the units shall be at the discretion of the COR. A map of unit locations shall be provided to the contractor no later than 72 hours before placement. Locations are subject to change at the discretion of the COR.
2.4 The following times are subject to change, coordinated by the CO or COR:
2.2.1 The airfield will be available for the placement of units beginning at 1000 hours (10:00 AM) on Friday, 20 April 2018. A staging area to temporarily place units (if needed) shall be available as designated by the COR. If used on Sunday, 22 April 2018, all units must be clear of the staging area by 1600 hours (4:00 PM).
2.2.2 The contractor shall have ten (10) standard, one (1) handicap, and one (1) handwashing unit in place by 1100 to support the preshow. The contractor shall have all units in place by 1800 (6:00 PM) on Friday, 20 April 2018.
2.2.3 For groups of standard latrine units, no more than half of the units may be inoperative for waste tank service at any time, up to 10 inoperative units, whichever comes first. For example, a group of 10 latrines must have no more than 5 units down for tank service, while a group of 30 can have up to 10 units down. CAFB personnel will be available to assist with crowd control and roping-off the closed units.
2.5 The units will be subjected to an airfield environment. The contractor shall ensure all units are functional in expected weather, e.g. resistant to tipping due to high airfield winds.
END OF SECTION