Attachment 4 Submittal Register FA301620B0003.pdf
PDF 140 KB Posted
- Attached to
- Repair Stanley Road Amendment 01 Federal contract opportunity
- Solicitation number
- FA301620B0003
About this file
This submittal register and related federal contract opportunity document outline requirements for the Repair Stanley Road project at Joint Base San Antonio - Fort Sam Houston in Texas. The project includes curb and gutter demolition and reconstruction, storm water infrastructure installation and repairs, road base preparation, asphalt overlay, and pavement marking restoration. The single award contract valued between $1,000,000 to $5,000,000 will have a performance period of 200 calendar days. The solicitation was issued by the 502D Contracting Squadron with responses due on specified dates in 2020. The pre-bid site visit was scheduled for January 6th. The work requirements, response timing, award value, and issuing agency information are provided for a firm to prepare a proposal to complete the Repair Stanley Road project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-bid site visit sign in sheet.pdf | ||
| Solicitation Amendment - FA301620B00030001.pdf | ||
| Q&A Stanley Road.pdf | ||
| Attachment 5 Base Maps FA301620B0003.pdf | ||
| Solicitation Amendment FA301620B00030001 SF 30.pdf | ||
| Attachment 1 Specifications 14 January 2019 FA301620B0003.pdf | ||
| Attachment 3 Climatology Report FA301620B0003.pdf | ||
| Solicitation - FA301620B0003.pdf | ||
| Attachment 1 Specifications 14 January 2019 FA301620B0003.pdf | ||
| Attachment 2 WDOL TX190007 FA301620B0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 9 PAGES
Repair Stanley Road
01 11 00 SD-01 Preconstruction Submittals
1.2.1.1.2 GTraffic Control Plan
01 14 00 SD-01 Preconstruction Submittals
1.4.1.1 Glist of Contract Personnel
1.4.1.2Installation Access
01 30 00 SD-01 Preconstruction Submittals
1.2 GView Location Map
1.3 GProgress and Completion
Pictures 01 32 01.00 10 SD-01 Preconstruction Submittals
Project Schedule CPM
GA
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 35 29 SD-01 Preconstruction Submittals 1.5Accident Prevention Plan (APP)
GA
Asbestos Hazard Abatement Plan (for description see spec section
13280); GA
Lead Hazard Control Plan (for description see spec section
13281); GA.
1.6 GActivity Hazard Analysis (AHA)
GCrane Critical Lift Plan GCrane Operators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FA301620B0003
ATTACHMENT 4 SUBMITTAL REGISTER
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 9 PAGES
01 35 29 SD-06 Test Reports GAccident Reports
Crane Reports
GA
Monthly Exposure Reports Regulatory Citations and Violations
SD-07 Certificates Confined Space Entry Permit Hot work permit
01 35 30 SD-08 Manufacturer’s Instructions GSite Safety and Health Plan
SD-09 Manufacturer’s Field Reports
GSafety and Health Phase-Out Report
01 35 35 SD-01 Preconstruction Submittals
1.6ENVIRONMENTAL
PROTECTION PLAN
G Fish and Wildlife Protection Measures as applcable; G Environmental Permits as applicable; G
SD-02 Shop Drawings GAsbestos Work Plans GAsbestos Certifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 9 PAGES
01 35 35 GAsbestos Transporter License GAsbestos Medical clearances
(may be reviewed on site) GAsbestos Training Certificates GAsbestos TDSHS License as applicable GAny Asbestos Inspection reports that have not been provided by the area specific Environmental Office.
Any Asbestos Inspection Reports that were not included in the original assessment or a results to a change in the scope of work.
G Unsigned copy of State Renovation, Demolition Notifications 15 days prior; G
GLead Work Plans GLead Occupant Protection Plan.
GTexas Department of State
Health Services Lead Licenses GLead Notifications GLead Training Certificates GLead Based Paint Reports GLead Inspection reports
SD-03 Product Data GAsbestos Air Monitoring reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 9 PAGES
01 35 35 GLead Air Monitoring reports SD-04 Samples
GLead OSHA Negative Exposure Assessment or
GLead Work Plan.
EPA Lead Training
GLead Awareness Training certificates
GOSHA Air Monitoring GLead Training Certificates GWaste Disposal Plan, May be included in work plan GLead Inspection reports GLead Based Paint Reports
01 45 00.00 20 SD-01 Preconstruction Submittals GContractor Quality Control (CQC)
Plan 01 50 00 SD-01 Preconstruction Submittals
1.2 GConstruction Site Plan
GTraffic Control Plan
SD-06 Test Reports Backflow Preventer Tests
SD-07 Certificates Backflow Tester
1.3Backflow Preventers 01 78 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 9 PAGES
01 78 00 GAs-Built Drawings SD-02 Shop Drawings As-Built Record of Materials
FIO
SD-03 Product Data
1.4.1 GWarranty Management Plan
SD-04 Samples GWarranty Tags
02 41 00 SD-01 Preconstruction Submittals 1.8Existing Conditions
SD-11 Closeout Submittals Receipts
03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan
1.6.6 GQuality Control Plan
1.6.7 GQuality Control Personnel
Certifications
1.6.9 GLaboratory Accreditation
GForm Removal Schedule 1.6.2.1Formwork
1.6.2.2 GReinforcing Steel
SD-03 Product Data 2.4.7Joint Sealants 2.4.6Joint Filler 2.1Materials for Forms 2.4.1Cementitious Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 9 PAGES
03 30 00 2.3.2Concrete Curing Materials 2.5Reinforcement
2.4.4 SAdmixtures
SD-06 Test Reports
1.6.1.2 GConcrete Mix Design
3.14.2.3 GCompressive Strength Tests
3.14.2.5Unit Weight of Structural
Concrete 3.14.2.4Air Content 3.14.2.1Slump Tests 2.4.2Water
SD-07 Certificates 2.5.1Reinforcing Bars 1.6.3.6Safety Data Sheets 2.3.2Curing Compound
31 00 00 SD-03 Product Data 3.2Shoulder Construction
SD-06 Test Reports Testing
SD-07 Certificates Testing
32 11 23 SD-03 Product Data
1.5 GPlant, Equipment, and Tools
1.1.3Waybills and Delivery Tickets
SD-06 Test Reports
2.3.1 GInitial Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 9 PAGES
32 11 23 3.13.1 GIn-Place Tests 32 12 13 SD-03 Product Data
1.1.3Waybills and Delivery Tickets 2.2.4Local/Regional Materials
SD-06 Test Reports 3.7Sampling and Testing
32 12 16 SD-03 Product Data
2.4 GMix Design
3.10 GQuality Control
3.11 GMaterial Acceptance
1.1.3 GPercent Payment
SD-04 Samples 2.3Asphalt Cement Binder 2.2Aggregates
SD-06 Test Reports
2.2 GAggregates
3.10.3.10QC Monitoring
SD-07 Certificates
2.3 GAsphalt Cement Binder
3.6Testing Laboratory
32 17 23 SD-03 Product Data
2.1.1.2 GSurface Preparation Equipment
List
2.1.2 GApplication Equipment List
3.2Exterior Surface Preparation
1.4.1 GSafety Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 9 PAGES
32 17 23 2.2.5.1 GReflective media for roads
2.2.1 GSolventborne Paint
2.2.4 GRaised Pavement Markers
Primers and Adhesives SD-06 Test Reports
2.2.5.1 GReflective Media for Roads
2.2.1 GSolventborne Paint
(HBAC)
2.2.4 GRaised Pavement Markers
Primers and Adhesives 3.4.1Test Reports
SD-07 Certificates
1.4.2 GQualifications
2.2.5.1Reflective Media for Roads 2.2.1Solventborne Paint
1.4.1 GVolatile Organic Compound
SD-08 Manufacturer’s Instructions
2.2.1 GSolventborne Paint
32 92 23 SD-03 Product Data 2.5Fertilizer
SD-06 Test Reports 2.3.3Topsoil composition tests
SD-07 Certificates 2.1sods
33 40 00 SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 9 PAGES
33 40 00 2.1Pipe for Culverts and Storm Drains
SD-07 Certificates 2.1.1Resin Certification 2.3.6.1Oil Resistant Gasket 3.9.1.2Leakage Test 3.9.1.1Hydrostatic Test on Watertight
Joints 3.9.1.3Determination of Density 2.3.5Frame and Cover for Gratings 3.9.2.1.3Post-Installation Inspection
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR