SON_for_Cisco_WAPS.pdf
PDF 14 KB Posted
- Attached to
- Wireless Access Point Refresh-CISCO Federal contract opportunity
- Solicitation number
- FA3016-19-U-0381
About this file
Statement of Need
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ-_Wireless_Access_Point_Refresh_(WAPS)_CISCO-20190926.pdf | ||
| RFQ-QA_Wireless_Access_Points.pdf | ||
| Cisco_APs.jpg | JPG image | |
| RFQ-_Wireless_Access_Point_Refresh_(WAPS)_CISCO-20190922.docx.pdf | ||
| Brand_Name_justification_Cisco_WAPS_Signed_Redacted.pdf | ||
| Atch_2_Provision_and_Clause-_Set_WAPS_Cisco.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF NEED
WIRELESS ACCESS POINTS REFRESH- CISCO
EST DELIVERY DATE: 01 NOV 2019
GENERAL INFORMATION
Description of Supplies: This requirement furnishes a total of 197 Cisco Aironet 3702i controller-based -wireless access points to lifecycle and replace current end of life wireless access points for the Medical Education and Training Campus on Fort Sam Houston. Currently, CISCO Wireless LAN Controllers are in production on the Army network. These controllers provide a central layer of management for each access point, allowing them to function optimally as a system, rather than individual units. Therefore, the purchase of another brand would require the base Network Enterprise Center/Information Technology (NEC/IT) to seek Unified Capabilities (UC) Approved List (APL) approval, a time-consuming and intensive process, and/or would require the NEC/IT to re-engineer its tactical network to accommodate another brand's operational requirements while still meeting the Defense Information Assurance UC APL requirements. To introduce another brand would create interoperability issues. This is a brand name requirement due to the existing Cisco brand wireless access points and controllers already on the Army Network Enterprise Center wireless network, therefore, to introduce another brand would create interoperability issues. This requirement does not include installation. The Contractor shall provide all equipment and supplies for this requirement.
DELIVERABLES:
The below list of deliverables shall be ordered within 30 days After Receipt of Order (ARO) to be shipped to Project Manager (PM – Akram Myers), located at Medical Education and Training Campus (METC) Information Technology and Multimedia Branch (ITMB) Warehouse, 4188 Commissary St., Bldg. 4188 Bay D, Office #4, Fort Sam Houston, TX 78234-5005.
Description Quantity Cisco 3702i Lightweight (Exact Part Number: AIR-CAP3702i-B-K9) B= USA Regulatory Domain 197
Salient Characteristics Standards: IEEE 802.11ac Frequency Band: 2.4 GHz / 5 GHz Power Adapter: Power Supply PoE Cisco Height: 2.1 Width: 8.7 Depth: 8.7
FINAL DOCUMENTATION
The below listed documentation shall be provided to PM and Contracting Officer (CO) upon completion of this project:
Table 6 – Final
Documentation for all OEM equipment, including user guides, maintenance guides, administration/configuration manuals, and training documentation
Documentation and full disclosures of warranty items to include time period of coverage and how and from whom to obtain warranty services. This shall cover all equipment, installation and other items with warranties concerning warranty information.
File details come from the government source that posted it.