SF30_Amendment_No_0001_SATX_JPPSO_Schedule_I_II_Official_release.pdf
PDF 98 KB Posted
- Attached to
- Transportation Services
- Solicitation number
- FA3016-19-U-0056
About this file
Not Listed
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
SF 30 BLOCK 14 CONTINUATION PAGE AMENDMENT 0001
The purpose of this amendment is to make the following changes:
1) Addendum to 52.212-1 Instructions to Offerors – Commercial Item Section (b) Part III, Past Performance Information, First Paragraph is hereby tailored to include the following statement:
“Efforts that have not yet been completed shall have had at least six (6) months of performance prior to the date of issuance of this solicitation.”
(2) Replace FAR Clause 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial Items (May 2019) with the most recent clause version dated August 2019. All FAR clauses incorporated by reference within 52.212-5 have not changed and remain in full force and effect.
(3) FAR Clause 52.204-25 is incorporated by reference under FAR 52.212-5 (August 2019);
therefore, the separate incorporation by reference to FAR 52.204-25 is hereby removed.
| Atch 3 SOW - Updated 13 Jun 18.pdf |
| 1.0 Background cover sheet or appendix |
| 2.0 Scope |
| 3.0 Description of Services |
| 3.1 General Services |
| 3.2 Design Services |
| 3.3 Product Markings/Documentation/Tools |
| 3.4 Delivery Services |
| 3.5 Installation and Removal Services |
| 3.6 Inspection/Acceptance Checklist |
| 4.0 Product |
| 4.1 Monolithic Panels and Components |
| 4.2 Stackable Panels and Components |
| 4.3 Modular Furniture |
| 4.4 Demountable Walls |
| 5.0 Government Furnished Property/Support |
| 6.0 Site Conditions |
| 7.0 Additional Services Information |
| 8.0 Quality Assurance |
| 9.0 Voluntary Protection Program (VPP)/Safety |
| 10.0 Base/Installation Specifics |
| 11.0 Reporting Requirements |
| 12.0 Deliverables (CDRLs) |
| 13.0 Services Summary |
| 14.0 Attachment 1 – Inspection/Acceptance Checklist |
| Atch 3 SOW - Updated 13 Jun 18.pdf |
| 1.0 Background cover sheet or appendix |
| 2.0 Scope |
| 3.0 Description of Services |
| 3.1 General Services |
| 3.2 Design Services |
| 3.3 Product Markings/Documentation/Tools |
| 3.4 Delivery Services |
| 3.5 Installation and Removal Services |
| 3.6 Inspection/Acceptance Checklist |
| 4.0 Product |
| 4.1 Monolithic Panels and Components |
| 4.2 Stackable Panels and Components |
| 4.3 Modular Furniture |
| 4.4 Demountable Walls |
| 5.0 Government Furnished Property/Support |
| 6.0 Site Conditions |
| 7.0 Additional Services Information |
| 8.0 Quality Assurance |
| 9.0 Voluntary Protection Program (VPP)/Safety |
| 10.0 Base/Installation Specifics |
| 11.0 Reporting Requirements |
| 12.0 Deliverables (CDRLs) |
| 13.0 Services Summary |
| 14.0 Attachment 1 – Inspection/Acceptance Checklist |
| Atch 3 SOW - Updated 13 Jun 18.pdf |
| 1.0 Background cover sheet or appendix |
| 2.0 Scope |
| 3.0 Description of Services |
| 3.1 General Services |
| 3.2 Design Services |
| 3.3 Product Markings/Documentation/Tools |
| 3.4 Delivery Services |
| 3.5 Installation and Removal Services |
| 3.6 Inspection/Acceptance Checklist |
| 4.0 Product |
| 4.1 Monolithic Panels and Components |
| 4.2 Stackable Panels and Components |
| 4.3 Modular Furniture |
| 4.4 Demountable Walls |
| 5.0 Government Furnished Property/Support |
| 6.0 Site Conditions |
| 7.0 Additional Services Information |
| 8.0 Quality Assurance |
| 9.0 Voluntary Protection Program (VPP)/Safety |
| 10.0 Base/Installation Specifics |
| 11.0 Reporting Requirements |
| 12.0 Deliverables (CDRLs) |
| 13.0 Services Summary |
| 14.0 Attachment 1 – Inspection/Acceptance Checklist |
| ADP99CB.tmp |
| 1.0 Background cover sheet or appendix |
| 2.0 Scope |
| 3.0 Description of Services |
| 3.1 General Services |
| 3.2 Design Services |
| 3.3 Product Markings/Documentation/Tools |
| 3.4 Delivery Services |
| 3.5 Installation and Removal Services |
| 3.6 Inspection/Acceptance Checklist |
| 4.0 Product |
| 4.1 Monolithic Panels and Components |
| 4.2 Stackable Panels and Components |
| 4.3 Modular Furniture |
| 4.4 Demountable Walls |
| 5.0 Government Furnished Property/Support |
| 6.0 Site Conditions |
| 7.0 Additional Services Information |
| 8.0 Quality Assurance |
| 9.0 Voluntary Protection Program (VPP)/Safety |
| 10.0 Base/Installation Specifics |
| 11.0 Reporting Requirements |
| 12.0 Deliverables (CDRLs) |
| 13.0 Services Summary |
| 14.0 Attachment 1 – Inspection/Acceptance Checklist |
| Statement of Work Revised 18 June 19.pdf |
| 1. Purpose |
| 2. Scope |
| 3. Requirement Description |
| 4. Safety Requirements. |
| The contractor shall remain in compliance with all Federal, State, county, and JBSA-Randolph security and safety laws, regulations, policies, and requirements. |
| 5. Site Coordination. |
| 6. Confined Space. |
| 7. Accident/Incident Reporting and Investigation. |
| 8. Work Area(s). |
| 9. Traffic control. |
| 10. Security Requirements. |
| 10.1 Security Clearances. |
| 11. Environmental Management. |
| 13. Quality Assurance. |
| 14. Contractor Personnel. |
| 14.1 Project Management. |
| 14.2 Site Point of Contact (POC). |
| 14.3 Personnel Requirements. |
| 15. Warranty. |
| 16. Manuals and Practices. |
| 17. Network Services and Solutions |
| 17.1 Network Infrastructure |
| Site Preparation and Installation Activities |
| 17.2 Requirements Analysis and Conceptual Design |
| 17.3 Installation Schedules. |
| 17.4 Site Preparation |
| 17.5 Pre-Installation Briefing |
| 17.6 Government Support |
| 17.7 Installation |
| 17.8 Manuals and Practices. |
| 17.10 Labeling. |
| 17.11 Grounding. |
| 17.12 Cable Terminations. |
| 18. Inside Plant Requirements. |
| 18.1 Measurements. |
| 18.2 Tools and Testing Support |
| 18.3 Test and Acceptance/Installation Test Plan. |
| 18.4 Testing. |
| 19. In-progress Testing. |
| 19.1 Fiber Optic Tests. |
| 19.2 Optical Attenuation. |
| 19.3 Distance. |
| 19.4 Acceptance/Installation Test Report. |
| 19.5 Final Acceptance. |
| 20. General Requirements |
| 20.1 Tools and Test Equipment |
| Statement of Work Revised 18 June 19.pdf |
| 1. Purpose |
| 2. Scope |
| 3. Requirement Description |
| 4. Safety Requirements. |
| The contractor shall remain in compliance with all Federal, State, county, and JBSA-Randolph security and safety laws, regulations, policies, and requirements. |
| 5. Site Coordination. |
| 6. Confined Space. |
| 7. Accident/Incident Reporting and Investigation. |
| 8. Work Area(s). |
| 9. Traffic control. |
| 10. Security Requirements. |
| 10.1 Security Clearances. |
| 11. Environmental Management. |
| 13. Quality Assurance. |
| 14. Contractor Personnel. |
| 14.1 Project Management. |
| 14.2 Site Point of Contact (POC). |
| 14.3 Personnel Requirements. |
| 15. Warranty. |
| 16. Manuals and Practices. |
| 17. Network Services and Solutions |
| 17.1 Network Infrastructure |
| Site Preparation and Installation Activities |
| 17.2 Requirements Analysis and Conceptual Design |
| 17.3 Installation Schedules. |
| 17.4 Site Preparation |
| 17.5 Pre-Installation Briefing |
| 17.6 Government Support |
| 17.7 Installation |
| 17.8 Manuals and Practices. |
| 17.10 Labeling. |
| 17.11 Grounding. |
| 17.12 Cable Terminations. |
| 18. Inside Plant Requirements. |
| 18.1 Measurements. |
| 18.2 Tools and Testing Support |
| 18.3 Test and Acceptance/Installation Test Plan. |
| 18.4 Testing. |
| 19. In-progress Testing. |
| 19.1 Fiber Optic Tests. |
| 19.2 Optical Attenuation. |
| 19.3 Distance. |
| 19.4 Acceptance/Installation Test Report. |
| 19.5 Final Acceptance. |
| 20. General Requirements |
| 20.1 Tools and Test Equipment |
| topmostSubform[0]: |
| Page1[0]: |
| IDCode[0]: |
| Page[0]: 1 |
| Pages[0]: 2 |
| AmendNo[0]: 0001 |
| EffDate[0]: 12 Sept 2019 |
| ReqNo[0]: |
| ProjNo[0]: |
| IssCode[0]: FA3016 |
| IssuedBy[0]: 502 CONS/JBKBA |
395 B STREET WEST, SUITE 2, BLDG 224
JBSA RANDOLPH AFB TX 78150-4525
| AdmCode[0]: FA3016 |
| AdminBy[0]: SEE BLOCK 6 |
| ContName[0]: |
| ContStrt[0]: |
| ContCnty[0]: |
| ContSt[0]: |
| ContZIP[0]: |
| Code[0]: |
| FacCode[0]: |
| SolChgYs[0]: Yes |
| SolChgNo[0]: Off |
| SolAmdNo[0]: FA3016-19-U-0056 |
| AmendDate[0]: 16 Aug 2019 |
| ModNo[0]: |
| ModDate[0]: |
| NoCopies[0]: 1 |
| Amended[0]: Yes |
| OffrExt[0]: Off |
| OffrNoEx[0]: No |
| ApprData[0]: |
| ChgeOrd[0]: Off |
| ChgeOrder[0]: |
| Modify[0]: Off |
| SuppAgre[0]: Off |
| SuppAuth[0]: |
| ModOthr[0]: Off |
| OthrSpec[0]: |
| NoReq[0]: Off |
| Require[0]: Off |
| Copies[0]: |
| Descript[0]: See Continuation Page |
POC: Darryl O, Bryant, 210-652-8256, darryl.bryant.3@us.af.mil
| SignName[0]: |
| SignTitl[0]: |
| ContDate[0]: |
| CoName[0]: |
| CoTitle[0]: |
| CODate[0]: |
File details come from the government source that posted it.