Atch_9_-_Detailed_Line_Item_Project_Breakdown_Example.pdf

PDF 2 MB Posted

Attached to
Renovate Bldg 200 North Wing Federal contract opportunity
Solicitation number
FA301619RA015
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attachment 9, Detailed Line Item Project Breakdown Example

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Bldg 200 North Wing, newest first.
File Type Posted
Solicitation_Amendment_FA301619RA0150001_SF_30.pdf PDF
FA301619RA016_-_Site_Visit_Q&A.docx DOCX document
Atch_3_-_Base_Access_Request_Form.pdf PDF
Atch_12_-_JBSA-Randolph_Weather_Data.pdf PDF
Atch_6_-_Progress_Schedule.xlsx XLSX spreadsheet
Atch_2_-_Wage_Determination_18_Jan_2019.pdf PDF
Atch_8_-_Project_Location.pdf PDF
Atch_10_-__Financial_Information_Questionnaire.docx DOCX document
Atch_7_-_Local_Information.pdf PDF
Atch_4_-_AETC_Form_47.pdf PDF
Atch_11_-__Contractor_Responsibility_Questionnaire.docx DOCX document
SOW_Appendix_A_-_Drawings.pdf PDF
Atch_5_-_Hazmat_Letter.pdf PDF
Atch_1_-_SOW_21Feb2019.pdf PDF
SOW_Appendix_B_-_Specifications.pdf PDF
RFP_FA301619RA015.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance and Payment Bonds

$Grand Total for All CLINs

PRICE PROPOSAL SUMMARY SHEET

Division 10 - Specialties

Division 08 - Openings Division 09 - Finishes

Division 01 - General Requirements Division 02 - Existing Conditions Division 03 - Concrete Division 07 - Thermal and Moisture Protection

Project Title RENOVATE B200 NORTH WING FOR AFLOA

Construction Elements

Division 26 - Electrical $

Division 21 - Fire Suppression Division 23 - Heating, Ventilating, and Air Conditioning

Extended Amount

Division 27 - Communications

$Total Amount for Construction

ITEMS LISTED ARE FOR REFERENCE ONLY. ITEMS MAY

NOT BE ALL INCLUSIVE. CONTRACTOR IS

RESPONSIBLE FOR DEVELOPING AN INDEPENDENT

LINE ITEM BREAKDOWN.

FA301619RA015March 4, 2019

Proj: REMARKS: Page:

Pkg:

Summary- Engineering Date:

Rev: Proj No. TYMX150081 Type: Estimator:

BASE

UMH

DIFF

FCTR

PROJ

UMH

MAN HRS

LABOR

RATE

COST UNIT COST UNIT COST

1 General Requirements 2 Exisiting Conditions 3 Concrete 7 Thermal and Moisture Protection 8 Openings 9 Finishes

10 Specialties 21 Fire Suppression 23 Heating Ventilating, and Air Conditioning 26 Electrical 27 Communications

Total Construction Cost 1 Bond 2 Contingency

Grand Total

RENV-B200 North Wing for AFLOA

DIV # DESCRIPTION Bid Option % of Total

LABOR MATERIAL EQUIPMENT

OVERALL TOTALOTHER

ITEMS LISTED ARE FOR REFERENCE ONLY. ITEMS MAY NOT BE ALL

INCLUSIVE. CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AN

INDEPENDENT LINE ITEM BREAKDOWN.

FA301619RA015

Pkg: Div 01

Rev:

Type:

Date:

Proj No. TYMX150081

BASE

UMH

DIFF FCTR

PROJ

UMH

MAN HRS

LABOR

RATE

COST UNIT COST UNIT COST UNIT COST

1 Program Manager 16 WK 2 Project Manager 16 WK 3 Quality Control Manager 16 WK 4 General Superintendent 16 WK 5 Site Safety Manager 16 WK 6 Scheduler 16 WK 7 Admin Assistant 16 WK 8 Digital Camera 1 EA 9 Field Cell Phone (3 Phones) 4 MTH

10 Temp Construction Trailer 4 MTH 11 Temp Construction Trailer Delivery and Setup 1 EA 12 Trailer Office Equipment (Budget) 3 EA 13 Temp Electric 4 MTH 14 Temp Water 4 MTH 15 Sewage Permit/Temp Toilets 16 WK 17 Phone & Internet Service 4 MTH 18 Project Signage 1 EA 19 Dumpsters (2) 4 MTH 20 Progress photos Monthly 4 MTH 22 Bulletin Boards 2 EA 23 Safety Equip (vest, hard hats, glasses, gloves) 16 EA 24 Misc. Consumables 4 MTH 25 Shipping/Postage 16 EA 26 Reproduction - pages 200 EA 27 O&M Manuals 500 LS 28 Submittals 500 LS

Total Construction Cost 1 Gen. Contractor General Conditions (Sum of Div 2-33 + lines 49) 2 Gen. Contractor's Overhead (Sum of Div 2-33 + lines 49, 50) 3 Gen. Contractor's Profit (Sum of Div 2-33 + lines 49, 50, 51)

Grand Total

OVERALL TOTAL

OTHER

UOM

LABOR MATERIAL EQUIPMENT

RENV-B200 North Wing for AFLOA

FINAL FOR CONSTRUCTION

Item # DESCRIPTION QTY

ITEMS LISTED ARE FOR REFERENCE ONLY. ITEMS MAY NOT BE ALL INCLUSIVE.

CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AN INDEPENDENT LINE ITEM

BREAKDOWN.

Proj: REMARKS:

Pkg: Div 02

Rev:

Type:

Page:

Date:

Proj No. TYMX150081

BASE

UMH

DIFF FCTR

PROJ

UMH

MAN HRS

LABOR

RATE

COST UNIT COST UNIT COST

1 Selective Demolition 1 LS 2 5 SF ACM Removal 2 LS

Sub Total

Division Total

OVERALL TOTALUOM

LABOR MATERIAL EQUIPMENT

OTHER

RENV-B200 North Wing for AFLOA

FINAL FOR CONSTRUCTION

Item # DESCRIPTION QTY

ITEMS LISTED ARE FOR REFERENCE ONLY. ITEMS MAY NOT BE ALL INCLUSIVE.

CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AN INDEPENDENT LINE ITEM

Pkg: Div 03

Rev:

Type:

Page:

Date:

Proj No. TYMX150081

BASE

UMH

DIFF FCTR

PROJ

UMH

MAN HRS

LABOR

RATE

COST UNIT COST UNIT COST

1 Patch floors/skim 1 LS

Sub Total

Division Total

EQUIPMENT

OTHER

OVERALL

TOTAL

Item # DESCRIPTION QTY

LABOR

UOM

RENV-B200 North Wing for AFLOA

FINAL FOR CONSTRUCTION

MATERIAL

ITEMS LISTED ARE FOR REFERENCE ONLY. ITEMS MAY NOT BE ALL INCLUSIVE.

CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AN INDEPENDENT LINE ITEM

Pkg: Div 07

Rev:

Type:

Page:

Date:

Proj No. TYMX150081

BASE

UMH

DIFF FCTR

PROJ

UMH

MAN HRS

LABOR

RATE

COST UNIT COST UNIT COST

Caulking, acoustic & at ceiling grid & door frames 1 LS

Insulation, batt, ceiling and wall included in drywall assembly 14500 SF

3 Acoustic sealants 1 LS

Sub Total

Division Total

OVERALL

TOTAL

UOM

LABOR MATERIAL EQUIPMENT

OTHER

RENV-B200 North Wing for AFLOA

FINAL FOR CONSTRUCTION

Item # DESCRIPTION QTY

ITEMS LISTED ARE FOR REFERENCE ONLY. ITEMS MAY NOT BE ALL INCLUSIVE.

CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AN INDEPENDENT LINE ITEM

Pkg: Div 08

Rev:

Type:

Page:

Date:

Proj No. TYMX150081

BASE

UMH

DIFF FCTR

PROJ

UMH

MAN HRS

LABOR

RATE

COST UNIT COST UNIT COST

Raco Framing and Glazing 700 SF

Door frames for wood doors with glass sidelights & transoms 16 EA

Glass side lights & transom w/obfuscated resin insert 16 EA

4 Hardware sets 26 EA 5 3' x 7' wood doors 26 EA 6 Thresholds 26 EA

Sub Total

Division Total

OVERALL TOTALUOM

LABOR MATERIAL EQUIPMENT

OTHER

RENV-B200 North Wing for AFLOA

FINAL FOR CONSTRUCTION

Item # DESCRIPTION QTY

ITEMS LISTED ARE FOR REFERENCE ONLY. ITEMS MAY NOT BE ALL INCLUSIVE.

CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AN INDEPENDENT LINE ITEM

Pkg: Div 09

Rev:

Type:

Page:

Date:

Proj No. TYMX150081 Estimator:

BASE

UMH

DIFF FCTR

PROJ

UMH

MAN HRS

LABOR

RATE

COST UNIT COST UNIT COST

Drywall framing & partition w/ insulation

1 Stud wall framing 11200 SF wall 2 Drywall 15250 SF wall 4 Ceiling grid & tile 5 116' x 12' perim 1392 6 30' x 13' 390 7 12' x 18' 216 8 6' x 110' corridor 660

Deduct for corridor corners and Lobbies 367

10 2'x2' tegular .85 NRC 3053 SF

Batt insulation above ceiling - 6" thick 3053 SF

12 Drywall Ceiling 731 SF 14 Painting

12'L x 21 ea x 10' H x 2sides 5675 SF wall

6' L x 6 ea x 10' H x 2 sides 3109 SF wall

17 Perimeter walls 1013 SF wall 18 Paint ceilings 731 SF wall 19 Paint corridor 4700 SF wall 20 Flooring

LTV Rooms 108, 153, 159, 160, 164-167 & 170 -

1/8" 670 SF

Carpet (UON) 2'x2'- 24 oz nylon 3094 SF

23 Vinyl base - 4" 1200 LF 24 Floor prep in concrete 25 Access Panels 3 EA

Sub Total

Division Total

OVERALL TOTALUOM

LABOR MATERIAL EQUIPMENT

OTHER

RENV-B200 North Wing for AFLOA

FINAL FOR CONSTRUCTION

Item # DESCRIPTION QTY

ITEMS LISTED ARE FOR REFERENCE ONLY. ITEMS MAY NOT BE ALL INCLUSIVE. CONTRACTOR

IS RESPONSIBLE FOR DEVELOPING AN INDEPENDENT LINE ITEM BREAKDOWN.

Pkg: Div 10

Rev:

Type:

Page:

Date:

Proj No. TYMX150081 Estimator:

BASE

UMH

DIFF FCTR

PROJ

UMH

MAN HRS

LABOR

RATE

COST UNIT COST UNIT COST

1 Interior Signage 9"x 9" 36 EA 2 6"x 8.5" Paper Inserts; 4/A502 36 EA

Sub Total

Division Total

LABOR MATERIAL EQUIPMENT

OTHER

OVERALL

TOTAL

RENV-B200 North Wing for AFLOA

FINAL FOR CONSTRUCTION

Item # DESCRIPTION QTY UOM

ITEMS LISTED ARE FOR REFERENCE ONLY. ITEMS MAY NOT BE ALL INCLUSIVE.

CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AN INDEPENDENT LINE ITEM

Pkg: Div 21

Rev:

Type:

Page:

Date:

Proj No. TYMX150081 Estimator:

BASE

UMH

DIFF FCTR

PROJ

UMH

MAN HRS

LABOR

RATE

COST UNIT COST UNIT COST

2 Add/Relocate Fire Sprinkler Heads (all inclusive unit cost) 3500 SF

Sub Total

Division Total

Item # DESCRIPTION QTY OVERALL TOTAL

LABOR MATERIAL EQUIPMENT

OTHER

RENV-B200 North Wing for AFLOA

FINAL FOR CONSTRUCTION

UOM

ITEMS LISTED ARE FOR REFERENCE ONLY. ITEMS MAY NOT BE ALL INCLUSIVE.

CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AN INDEPENDENT LINE ITEM

Pkg: Div 23

Rev:

Type:

Page:

Date:

Proj No. TYMX150081

BASE

UMH

DIFF FCTR

PROJ

UMH

MAN HRS

LABOR

RATE

COST UNIT COST UNIT COST

Roof top Mechanical Unit Penetrations includes cutting plywood deck, misc steel supports, blocking and roofing tie in S-101 2 EA

3 Remove chilled waterpiping verticle 55 LF 4 Remove Air Handling Unit 5 TONS 5 Remove Supply Ductwork to First Floor 300 SF 6 Remove Return Ductwork to First Floor 1 LS 7 Remove Outside Air Ductwork 1 LS 8 Remove Hot Water Piping 1 LS 9 Remove Hot Water Pump 2 LS

10 Remove Condensate Drain Line 30 LF 12 VAV Boxes 10 EA 13 Medium & low pressure duct 2500 LB 14 Grilles registers & diffusers 48 EA 15 Duct risers to Roof Hoods 2 EA 16 New Chilled Water Supply and Return 1" to 2" 300 LF 17 Route new 2-1/2" Chilled Water Supply 1 LS 18 Route condensate lines 1 LS 19 Route 18" x 48 OA Duct 1 LS 20 Route 54" x 18" Relief Duct 1 LS 22 AHU-1 York XTI-39x60 1 EA 23 Roof vents RV-1 & RV-2 COOK 4800 & 4000 CFM 2 EA 24 Pump P-2 Hot water GRUNDFOS Model 12707 VLS 1 EA 25 Piping Insulation, 1" 300 LF 26 Duct Insulation 2500 LB 27 Flexible Ductwork 400 LF 28 Water Treatment 1 LS 29 HVAC Controls 1 LS

Sub Total

Division Total

OVERALL TOTALUOM

LABOR MATERIAL EQUIPMENT

OTHER

RENV-B200 North Wing for AFLOA

FINAL FOR CONSTRUCTION

Item # DESCRIPTION QTY

ITEMS LISTED ARE FOR REFERENCE ONLY. ITEMS MAY NOT BE ALL INCLUSIVE.

CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AN INDEPENDENT LINE ITEM

Pkg: Div 26

Page:

Date:

Rev: Proj No. TYMX150081 Type:

BASE

UMH

DIFF FCTR

PROJ

UMH

MAN HRS

LABOR

RATE

COST UNIT COST UNIT COST

1 Electrical

Lights 2'x2' LED Vollmetric w/step dimming and high CRI 74 ea

3 Downlights 41 ea 4 2' x2' LED under Cabinet linear 25 ea 5 Wall Outlets 72 ea 6 Switches 40 ea 7 Exit Lights 9 ea 8 Power for AHU 2 ea 9 Power for VAVs 10 ea

10 Power Distribution 3500 SF

Sub Total

Division Total

OVERALL

TOTAL

UOM

LABOR MATERIAL EQUIPMENT

OTHER

RENV-B200 North Wing for AFLOA

FINAL FOR CONSTRUCTION

Item # DESCRIPTION QTY

ITEMS LISTED ARE FOR REFERENCE ONLY. ITEMS MAY NOT BE ALL INCLUSIVE.

CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AN INDEPENDENT LINE ITEM

Pkg: Div 27 Date:

Rev: Proj No. TYMX150081 Type:

BASE

UMH

DIFF FCTR

PROJ

UMH

MAN HRS

LABOR

RATE

COST UNIT COST UNIT COST

1 4 Pair CAT 6 Plenum (Blue) 13000 FT 2 RJ-45 Inserts (Data) (Color TBD) 45 EA 3 RJ-45 Inserts (Voice) (Color TBD) 38 EA 4 4-Port Wallplate (Color TBD) 40 EA 5 Quickport Blank Inserts 80 EA 6 Testing to CAT 6 Standards 83 EA 7 2-Post Rack 1 EA 8 Vertical Cable Management 2 EA 9 48-Port Patch Panel 2 EA

10 Horizontal Cable Management 2 EA 11 75' Velcro Roll 2 EA 12 Label tape, black on white 2 EA 13 2 inch conduit 100 LF 14 Fire Stop Materials 1 Lot

Voice and data outlets w/ 1 Voice and 1 Data CAT 6 (TN101) 39 EA

1" conduit w/Jbox for data drops 10' long 39 EA

17 MDF rack 19" x 84" 2 1 EA 18 GFGI Rack Mounted UPS 12 1 EA 19 GFGI network Switch 11 1 EA 20 Cable tray above ceiling 276 LF 21 Miscellaneous Expenses 1 Lot

Sub Total

Division Total

LABOR MATERIAL EQUIPMENT

OTHER

OVERALL

TOTAL

RENV-B200 North Wing for AFLOA

FINAL FOR CONSTRUCTION

Item # DESCRIPTION QTY UOM

ITEMS LISTED ARE FOR REFERENCE ONLY. ITEMS MAY NOT BE ALL INCLUSIVE.

CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AN INDEPENDENT LINE ITEM

Government Sheet
Summary-Engineering
Div 01
Div 02
Div 03
Div 07
Div 08
Div 09
Div 10
Div 21
Div 23
Div 26
Div 27