Revised_SOW_FA3016-17-U-0195_Dated_7-26.pdf
PDF 713 KB Posted
- Attached to
- VTC and Auditorium Upgrade Federal contract opportunity
- Solicitation number
- FA3016-17-U-0195
About this file
Revised SOW Dated 7-26-2017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_1_FA3016-17-U-0195_VTC_and_Auditorium_Upgrade.pdf | ||
| FA3016-17-U-0195_RFQ_7067AW02.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation FA3016-17-U-0195, Attachment 1
1 | P a g e
STATEMENT OF WORK
FOR
CAMPUS WIDE VIDEO TELECONFERENCE (VTC) LIFECYCLE
REPLACEMENT AND AUDITORIUM UPGRADE
Revised 26 July 2017
1. DESCRIPTION OF SERVICES / GENERAL INFORMATION. The contractor shall provide all management, tools, supplies, equipment, transportation, and non-personal services necessary to accomplish the lifecycle replacement and installation of METC’s Video Teleconferencing Systems, as further defined in the attachments. The contractor shall be required to transport all replaced equipment to a central storage area, palletize, and prep for disposition through Defense Reutilization and Marketing
Office (DRMO), 4060 Wilson Way, Joint Base San Antonio – Fort Sam Houston, Texas, 78234.
1.1. DESCRIPTION OF SERVICES. Requirements are specified in appendix B and C.
1.1.1. SCHEDULE. Provide a Project schedule coordinated with the Government Representative to identify specific timelines for each phase of the project and provide an overall estimated completion date.
The point of contact (POC) shall coordinate with the Government representatives for access to the building(s) specified in this Statement of Work (SOW) as necessary. The Contractor shall provide a Final
Design, including a Bill of Materials (BOM) and a Quality Control Plan (see paragraph 1.3 below) to the
Government representatives a minimum three (3) work days prior to start of work. The Contractor shall propose the start date to the Government representatives a minimum of three (3) work days prior to starting work, and shall subsequently schedule work dates and coordinate all work with the using agency and through the Government representatives.
1.1.2. PROJECT PLAN AND STATUS REPORTS. Provide a detailed upgrade and configuration
Project Plan to the Government Representative. Hold weekly Integrated Project Team (IPT) meetings with the Government representatives, that covers progress made each week, ensure timelines are met and discuss any issues that arise. Provide immediate notification of any change in installation and/or upgrade schedule to Government Representative
1.1.3. PROJECT SUPERVISION. Identify a POC and an alternate with authority to act for the
Contractor relating to daily contract operation. The POC shall be an individual with at least five (5) years’ of experience that is responsible for contract performance and delivery; conducting project team meetings with the Government’s Project Manager; producing a thorough project schedule that specifies building and rooms to be completed each day (within the specified period of performance); and handling logistic requirements. The POC shall coordinate and direct all contractor resources for project success, and shall be the primary project point of contact between the Contractor and the Government representative.
1.1.4. SITE EXAMINATION. Contractors shall examine the site and determine for themselves the existing conditions and general character of the site. Claims for additional costs due to conditions that could have been verified by site investigation shall not be permitted.
1.1.5. EQUIPMENT DELIVERY. All equipment shall be held by the contractor and delivered at the start of the installation. Contractor shall provide itemized list of all equipment with make, model and serial number as well as that installation specific information (building and room number) to the designated Government representative.
2 | P a g e
1.1.6. IMPLEMENTATION OF HARDWARE OR SOFTWARE COMPONENTS. Work in conjunction with organizational departments to ensure satisfactory implementation of any and all hardware or software components that shall attach to or install on existing network systems or devices.
1.1.7. REMOVAL OF EXISTING EQUIPMENT. Remove existing video teleconference equipment once new equipment has been installed, tested, and accepted. Remove and dispose of all existing irrelevant infrastructure cabling once new infrastructure cabling is installed, tested, and accepted.
Contractors shall label, package, and move/transfer removed Government equipment. The Government shall provide contractor with safe place to store all existing equipment until moved to building 4188.
Contractor shall provide an equipment list and the Government shall sign for all removed equipment at point of delivery to building 4188.
1.1.8. LABELING. All terminations shall be labeled in accordance with previously established standards as evidenced by existing infrastructure.
1.1.9. INSPECTION AND ACCEPTANCE. Inspection and acceptance shall be at the project site.
Notify the Government Representative in writing when the entire project has been inspected and ready for the Government’s pre-final inspection. With this notification, prepare and submit a list of items that must be corrected or completed.
1.1.9.1. PRE-FINAL INSPECTION. The Government representatives or technical representatives shall conduct a pre-final inspection when the project is substantially completed prior to a final inspection of the facility.
Upon completion of the pre-final inspection, if deficiencies are noted the Government representatives shall transmit a punch list report to the Contractor listing discrepancies requiring correction or completion and establishing a date for the final inspection. The Contractor has ten (10) days to complete the punch list and final inspection. The contractor shall provide three (3) days notification for the final inspection.
1.1.9.2. FINAL INSPECTION. When all pre-final inspection discrepancies have been corrected, the
Government representative shall conduct the final inspection with the POC, the Contractor, and any needed subcontractors to determine whether the project can be finally accepted upon written notice from the Contractor that the punch list items are complete.
1.1.9.3. RE-INSPECTION. If, upon the final inspection, it is found that punch list items are not sufficiently completed that the project cannot be finally accepted, the Contractor may be responsible for the Government costs for the additional technical services for preparation of a new punch list and any subsequent re-inspection prior to final acceptance. The Government cost for additional services may be charged to the Contractor through an appropriate change order at the rate of actual costs of the inspection team. Upon written notice from the Contractor that the re-inspection punch list items are complete, the
Government representative shall conduct the final inspection to verify that the discrepancies have been completed and determine whether the project can be finally accepted.
1.1.9.4. GOVERNMENT ACCEPTANCE. In accordance with the terms of the contract, the
Government shall accept, within ten (10) duty days after Final Inspection. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
1.2. GENERAL INFORMATION. The Contractor shall:
3 | P a g e
a) Conduct themselves in a professional, courteous manner, maintaining acceptable appearances and dress.
b) Report in (with the Government’s Representative) at the beginning of each day as well as check out and provide project status at the end of the day.
c) Be responsible for transportation to and from jobsite as required. Building/area access shall be provided to the Contractor by the Customer or an assigned contact.
d) Maintain a clean and safe work environment. All unused materials, containers, tools and equipment shall be removed whenever possible and all trash debris shall be removed at the end of each day.
e) Take all precautions to protect all floors, walls, windows and other surfaces from stains, marring or other damage and shall be responsible for any necessary repairs.
1.2.1. COMMERCIAL WARRANTY. The Contractor agrees that the supplies/equipment or services furnished under this contract shall be covered by the manufacturer’s warranties. The printed terms and conditions of such warranties shall be provided to the Government with the delivery of any supplies/equipment or services covered.
1.3. QUALITY CONTROL. The contractor shall be responsible for quality control for all work accomplished during the performance of the task. The contractor shall provide and maintain a Quality
Control Plan (QCP) which ensures the requirements in this SOW are met. The QCP will be considered acceptable and approved unless the contractor is notified by the Contracting Officer (CO) prior to award.
The QCP shall be included in the technical proposal for evaluation and acceptance. As a minimum, the contractor shall develop quality control procedures that address the areas identified in section 2, Service
Delivery Summary.
1.3.1. CONTRACT MANAGEMENT. The Government representatives shall be identified to the
Contractor prior to start of work and shall monitor Contractor compliance with terms and conditions of the contract and notify the Government Point of Contact in writing of any deficiencies with recommendations as to corrective action. The Government representative is not authorized to take any actions which may result in changes in the provisions, specifications, or pricing of this contract. No changes in or deviation from the scope of service shall be effected without a modification executed.
1.3.2. HOURS OF OPERATION. Work shall be completed within occupied buildings occupied but unoccupied work areas. Work hours shall be 7:30 a.m. to 4:30 p.m., Monday through Friday, exclusive of
Federal holidays. At the option of the government, work may be permitted on Holidays, weekends or after
4:30 p.m. daily at no additional cost to the government.
1.3.3. HOLIDAYS OBSERVED. The Government holidays (non-workday weekdays) are New Year’s
Day; Dr. Martin Luther King, JR. Birthday; President’s Day; Memorial Day; Independence Day; Labor
Day; Columbus Day; Veterans Day; Thanksgiving Day; Christmas Day.
Note: When any of the above holidays falls on a Saturday, the preceding Friday shall be observed as the legal holiday; holidays falling on a Sunday shall be observed on the following Monday.
1.3.3.1 FACILITY CLOSURES. The Government shall notify the Contractor of anticipated closure of the facility, (i.e., training, holidays, administrative leave granted to the entire staff, or other closure including down days or family days) five (5) business days in advance or as soon as possible. In the event of unplanned closure of the facility due to natural disasters, military emergency, or severe weather, the
4 | P a g e
Contractor shall be notified in the same manner as DOD civilian personnel. The Government shall not pay if work on the TO cannot be performed during these periods.
1.3.4. SECURITY REQUIREMENTS. Contractor shall provide the name, date of birth, driver’s license number and state of issue for all personnel which shall require access to Joint Base San Antonio, Fort
Sam Houston to accomplish contract requirements.
1.3.4.1 APPLICABLE DOCUMENTS. The Contractor shall ensure all construction for this project is completed in with 29 CFR (Code of Federal Regulation) 1910, OSHA General Standards and 29 CFR
1926, to include OSHA Construction Standards, Unified Facilities Criteria (UFC) 3-580-01
Telecommunications Building Cabling Systems Planning and Design, Unified Facilities Criteria (UFC) 3-
600-01 Fire Protection Engineering for Facilities, UFC 4-010-01 Minimum Antiterrorism Standards for
Buildings, International Building Code, and Uniform Mechanical Code, and DA Technical Guide for
Installation Information Infrastructure Architecture (I3A). Furthermore, all electrical work shall comply with NFPA Life Safety Code 101, the latest edition of NFPA 70, (National Electric Code) and NFPA standards for communications.
1.3.4.2 FIRE AND SAFETY REGULATIONS. The Contractor shall comply with all Fort Sam Houston
Post Fire and Safety Regulations. The Contractor is required to comply with the American General
Contractors' Safety Manual and the Occupational Safety and Health Act. The Contractor shall comply with all applicable Air Force Occupational Health and Safety Standards and Regulations.
1.3.5. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL
COMMAND AUTHORITY OR OVERSEAS COMBATANT COMMANDER. The services required under this SOW are not designated as mission essential.
1.3.6. SPECIAL QUALIFICATIONS. The design and programming shall be accomplished under direction and supervision with an individual with ten (10) years’ of experience, licensing and certification sufficient to insure installation meets all government and testing standards, and all operational requirements. The physical installation of equipment will be accomplished by no less than three installers with a minimum of five (5) years’ of experience installing audio/video equipment similar to the environment of the Medical Education and Training Campus. The work shall be in strict accordance with the contract documents and standards of the industry. For those trades not requiring a license, the
Contractor shall ensure qualified and experienced personnel in their trades are assigned to government project work
1.3.7. RECORDS MANAGEMENT. The Contractor shall manage all data created for Government use or legally controlled by the Government, in support of the functional activity or required by AF publication, IAW with the AF records management procedures in Air Force Instruction (AFI) 33 - 322, Records Management Program, paragraph 10, Air Force Manual (AFMAN) 37-123,paragraph 7.4, Air
Force Manual (AFMAN) 37-138, paragraph 2.13, and the Air Force Records Disposition Schedule (AF
RDS) located at https://afrims.amc.af.mil/rds_series.cfm or http://www.amc.af.mil/shared/media/document/AFD-060803-003.pdf
1.3.8. AIR FORCE ANTITERRORISM (AT) PROGRAM. The AT program seeks to deter or limit the effects of terrorist acts against the AF by giving guidance on collecting and disseminating timely threat information, providing training to all AF members, developing comprehensive plans to deter and counter terrorist incidents, allocating funds and personnel and implementing AT measures. In accordance with
AFI 10-245paragraphs 2.18 and paragraph 2.25, DOD contractors and sub-contractor personnel shall be offered Level 1 - AT Awareness Training. AT Awareness Training may be accomplished by either a
5 | P a g e
Level I - qualified instructor, or by completing the "Force Protection" computer based training (CBT) course on the Advanced Distributed Learning System (ADLS) https://golearn.csd.disa.mil/kc/login/login.asp or at https://jkodirect.jten.mil for individuals without access to NIPR, possessing a CAC card, nor enrolled in DEERS. Compliance with the training will be monitored by the contracting officer’s representative.
2. DELIVERY SUMMARY.
Table I
Performance Objective SOW Paragraph Performance Threshold
1. Produce an agreed upon project schedule with the
Contracting Officer
Representative and Project
Manager.
Schedule
(Paragraph 1.1.1)
Produce an agreed upon project schedule with the Contracting
Officer Representative and
Project Manager.
2. Conduct project team meeting with the PM and other government representatives.
Project Plan and Status Reports
(Paragraph 1.1.2)
Conduct project team meeting with the PM and other government representatives.
3. Identify a POC and an alternate with authority to act for the Contractor relating to daily contract operation.
Project Supervision
(Paragraph 1.1.3)
Contractor shall provide a Project
Manager responsible for contract performance and delivery.
4. Furnish and install all required infrastructure to support proper operation of newly installed video teleconference equipment as well as proper integration with existing podiums, screens, speakers, and projector equipment.
Specific Requirements
(Paragraph 1.1).
Contractor shall ensure existing infrastructure fully integrates with new equipment, having less than a
1% error rate that is corrected within 24 hours of noted deficiency.
5. Furnish and install all required podium components, unless otherwise specified to be
Government furnished. The
Contractor shall connect, integrate, configure, program, and test existing screens, speakers, and projectors with new video teleconference components.
Specific Requirements
(Paragraph 1.1)
Contractor shall ensure existing hardware components fully integrates with new components, having less than a 1% error rate that is corrected within 24 hours of noted deficiency
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Contractor may utilize electrical utilities and restrooms facilities as needed. The Contractor shall use good judgment in the
6 | P a g e conservation of government utilities. The Contractor shall adhere to and enforce prevailing energy conservation practices.
3.1 WORK/STORAGE AND PARKING. Do not work or store materials in a manner that would hinder or otherwise block pedestrian circulation to exit corridors and exit doors in the event of an emergency or fire. Storage and parking shall be near the job site or as designated by the Government representatives.
Limited storage may be available to contractor upon request. Storage of materials shall be coordinated with the Government representatives. The storage areas shall be free of debris, refuse, spills, leaks, stains, splashes and excessive materials. All storage areas shall be maintained in a neat, clean, and safe condition.
TABLE II
Required Documentation
Equipment list(s) with room number(s), item description, brand name, make and model with serial numbers and quantity as system equipment is delivered and installed.
Documentation for all OEM equipment, including user guides, maintenance guides, administration/configuration manuals, and training documentation.
Track, document, and deliver all software, software configurations, programming, and software licenses used by the system.
Documentation and full disclosures of warranty items to include time period of coverage and how and from whom to obtain warranty services. This shall cover all equipment, installation and other items with warranties concerning warranty information.
Cable layout and equipment drawings (either in CAD or PDF format).
Names, titles, certifications, training, and years of experience of key personnel in the design and supervision of the installation.
4. APPENDICES.
A. Acronyms
B. Medical Instruction Facility (MIF) 4 Auditorium Lifecycle Upgrade
C. METC Campus-wide Video Teleconference Lifecycle Replacement
7 | P a g e
APPENDIX A ACRONYMS
ADLS Advanced Distributed Learning System
AF Air Force
AFI Air Force Instruction
AFMAN Air Force Manual
AFRDS Air Force Records Disposition Schedule
AT Antiterrorism
AV Audio/Video
BOM Bill of Materials
Bldg Building
CFR Code of Federal Regulation
CAC Common Access Card
CAD Computer Aided Design
CBT Computer Based Training
DEERS Defense Enrollment Eligibility Reporting System
DRMO Defense Reutilization and Marketing Office
DTIC Defense Technical Information Center
DOD Department of Defense
IPT Integrated Project Team
METC Medical Education and Training Campus
MIF Medical Instruction Facility
NFPA National Fire Protection Association
NIPRNet Non-Secure Internet Protocol Router Network
OSHA Occupational Safety and Health Act
OEM Original Equipment Manufacturer
SOW Statement of Work
PC Personal Computer
POC Point of Contact
PDF Portable Document Format
PM Project Manager
QC Quality Control
QCP Quality Control Plan
UFC Unified Facilities Criteria
VGA Video Graphics Array
8 | P a g e
APPENDIX B
Medical Education and Training Campus (METC)
Medical Instruction Facility (MIF) 4 Auditorium Lifecycle Upgrade
1.0 PROJECT INFORMATION: This requirement shall furnish and install up-to-date audio/video and video teleconference equipment, in the Auditorium located in MIF 4 (Bldg 1364) on the
METC Campus on Fort Sam Houston. Video teleconference items furnished must be current on the Department of Defense Information Network’s Approved Products List. Equipment shall be the most up-to-date and fully integrated into existing equipment. The Contractor shall provide all management, tools, supplies, equipment, labor, materials and documentation required including final design and labor required for the engineering, installation, and testing of this project.
2.0 DESCRIPTION OF WORK: Remove obsolete VTC system, hanging projector, and automated projector screen. Install Cisco SX80 and integrate with existing cameras and other peripheral devices to allow for large scale VTCs. Install and commission 18’x12’ (width x height), 3.91mm, indoor LED display, along with required supports and video processors. Install ceiling mounted microphones, both on stage and above audience seating. Remove existing wall mounted TVs and mounts; replace with 84” LED, RS232 controlled displays and swing arm, wall display mount. Install 32” LED, RS232 controlled confidence monitor, centered on the left and right edge of the stage, slanted for use by the presenter’s view of the main program output.
Remove existing spot lights. Install temperature range control LED lights and lighting console to allow for remote controls of devices from within the control booth. Install 2, 4-digit countdown timer displays. Remove and replace existing lectern with executive styled flat top lectern with articulating monitor mount, and cutouts for tabletop control with 10” color touch screen, power outlets and external audio and video connectors.
In addition to these requirements, the Contractor shall remove outdated AV equipment from the control room and replace with necessary equipment to integrate the VTC, podium and standalone PCs, lighting controls, and displays.
The integration will allow for the following capabilities within the auditorium:
From the stage o The stage will be equipped with a standard lectern that will be positioned on stage to the left of the viewing audience.
o The back wall of the stage will hold an 18’x12’ (width x height) LED video display with on/off capabilities capable of being controlled either from the stage or the control booth.
o The stage will be equipped with overhead omni-directional microphones that track presenters’ audio, controlled from the control booth.
o The stage will be equipped with two 32” (or larger) confidence monitor, centered on the left and right edge of the stage, slanted for use by the presenter’s view of the main program output.
o The stage will be equipped with two 4-digit countdown display event timer, located in close proximity to the confidence monitors.
9 | P a g e o The spotlights directed onto the stage will be temperature range controlled LED lights with controls capable from the stage or the control booth.
Lectern o The lectern will have a minimum of 35” flat work surface.
o The lectern will be equipped with an interactive display monitor on an articulating mount. The outputs on the monitor will be controlled by an AV control panel that will be mounted in a flip-top touch screen solution that includes power outlets and
HDMI/VGA/DVI/AUX input connectors with a mini audio jack.
o The podium surface will have a 10” touch/control panel that will be fixed to the far right. Touch panel will also have intercom capabilities between control booth and lectern touch panel.
o The podium will be equipped with a rack-mounted, broadcast quality BLU-Ray/DVD
Player and be controlled by the podium touch panel; it will be used as a source input.
o The podium will be equipped with a state of the art, RS232 controlled Document
Camera; it will be turned on or off by the Touch Panel; it will be used as a source input.
o The podium will be equipped with a surface mounted microphone. The touch panel will control the volume control and mute functions of the microphone.
o The podium will be equipped with the latest desktop computer (government furnished) that will be used as a source input.
o The podium surface will be equipped with a flush mount cubby that will house the
HDMI/VGA/DVI AUX input connectors and the mini audio jack that accompanies the
HDMI/VGA DVI AUX input; for visiting laptops, etc.
o The podium touch panel will control the on/off action of the video wall display; with a function to mute the display.
o The podium touch panel will allow all source inputs (Podium PC, DOC CAM, BLU-
RAY DVD, AUX input) to be sent to the Video Wall Display and the confidence monitor independently.
o The podium touch panel will be set so that audio follows source selected video o The podium touch panel will control the main program audio output; with a mute option.
o The podium touch panel will control the audio volume of all podium source inputs;
with individual mute options.
o A master on/off switch on the touch panel will be used to shut the basic system functions down with one touch (and vice versa); default “on” source for Stage and
Booth will be PC.
o The booth and the podium should work in tandem with all podium sources also as booth sources when needed; and labeled on booth touch panel as such; with the booth touch panel being the primary.
Seating Area o The Seating area will be equipped with two 84” or larger LED monitors, positioned just to the left and right of the stage.
o The monitors on/off function, mute and source selection will be controlled by the
Booth or Stage touch panels.
o The seating area will be equipped with overhead microphones to capture audience comments/questions.
10 | P a g e o The overhead microphones will be controlled by the booth touch panel and be set-up on the panel in zones; each zones on/off, gain controls and mute will be independently controlled by the touch panel.
o The existing (4) cameras in the auditorium will be reutilized and integrated into the upgrade; two of the cameras will have to be repositioned to gain maximum audience views.
o The Cameras will also be used as the primary cameras for the CODEC SX-80
(VTC).
Control Booth o The Control Booth will be the primary area for all Audio Visual and Multimedia control in the Auditorium.
o The current rack and furniture configuration will remain the same.
o The Cameras, camera control units, and camera switcher will be reutilized and integrated into the upgrade.
o The current media racks will neatly house all of the Multimedia equipment required for the upgrade.
o The media racks will be equipped with, at a minimum, a Desktop PC (government furnished); rack-mounted, broadcast quality BLU-Ray/DVD Player; an Video/Audio
Recorder; a CODEC SX-80 (VTC), Camera Control Units; a program monitor; a preview monitor; wireless microphone receivers; ceiling microphone receivers; a source input panel which includes HDMI, VGA and DVI input connectors (for external connections). And related media processing equipment.
o A 15-inch (or greater) touch panel will be used to control and route all Video and
Audio signals. Touch panel will also have intercom capabilities between control booth and lectern touch panel.
o The touch panel display will be user friendly with a clear, easy to use and read layout.
o A master on/off switch on the touch panel will be used to shut the basic system functions down with one touch (and vice versa); default “on” source for Stage and
Booth will be PC.
o All sources will have the ability to be independently routed to the video wall, the confidence monitor, and viewer side monitors.
o The touch panel will independently control the on/off functions of the Video Wall, the confidence monitor and the viewer side monitors; with the ability to mute all independently.
o The primary Video that will be captured by the Video/Audio Recorder will be Camera
Video; and a combination of Room/Stage and Source selected audio.
o When necessary, the booth and the podium should work in tandem; meaning all podium sources will also be booth sources when needed; and labeled on booth touch panel as such; with the booth touch panel being the primary.
o The booth will be equipped with audio monitors to monitor stage and audience audio;
volume and mute for the monitors will be controlled by the touch panel.
o The main audio output volume and mute will be controlled by the touch panel.
o All source audio input volumes (to include mics) will be controlled independently by the touch panel; to include the mute function.
o Stage lights will be controlled by simplistic, wall-mounted lighting control on the stage and independent light control panel in the control booth.
11 | P a g e
VTC
o The CODEC (VTC) will be integrated into the video and audio system of the Media
Booth.
o The VTC will be a source on the touch Panel.
o The VTC should be configured to receive and send DUO Video; to enable the ability to receive/send the camera feed and presentation (slides) at the same time as intended.
o All source audio will remain active during a VTC source selection (to allow for switching to various audio sources during the VTC for audience or recording.
o All functions of the VTC will be controlled by the touch panel or a separate stand-alone touch panel.
o All audio and video can be recorded.
Salient characteristics are listed in (Table I).
Performance and Delivery Location:
MIF-4 Bldg 1364 Room 208
3.0 INFRASTRUCTURE INSTALLATION. Furnish and install all required infrastructure to support proper operation of new VTC systems and ceiling microphones. Coordinate with the
Government PM prior to the infrastructure installation start date to determine that the site is ready for installation. Remove and dispose of any existing irrelevant infrastructure cabling once new infrastructure cabling is installed, tested, and accepted. Prior to the infrastructure installation start date, a joint site inspection by the Contractor and Government Representative shall be held to verify project site status as ready for installation and the successful completion of all tasks supporting this project.
4.0 SYSTEM INSTALLATION. Furnish and install all required necessary components. Connect, integrate, configure, program, and test compatibility and integration of newly installed equipment with existing infrastructure. Ensure that the VTC system installed has all required licensing and are loaded with the most current/updated software packages. NOTE: On-site storage of project material is limited but available with coordination through Government Representative. Upon completion of installation and final testing of system and infrastructure components, provide system documentation (user guides), applicable system code; warranty information; block diagram by room, and initial on-site training services to the Government.
TABLE I
ITEM SPECIFICATIONS/SALIENT CHARACTERISTICS QTY
Aurora Indoor LED Pixel Display
(LK2FS-039IB)
Pixel Pitch: 3.91mm
LED Type: SMD
Pixel Count: 16,384 (128 x 128)
Frame Rate: 60 Hz
Horizontal Viewing Angle: 140 deg
Width: 500mm (19.69”)
Height: 500mm (19.69”)
Depth: 82mm (3.23”)
Weight: 19.8 lbs
Material: DieCast Aluminum Alloy
12 | P a g e
Aurora Video Processor (VP-
MIG550DS-2)
Full color HD video processor for LED video display panel system
Inputs: AV (2 PAL NTSC SECAM), VGA (2 VESA), DVI (1 1080i), HDMI 1.3 (1, 480i/P, 576i/P, 720i/P, 1080i/P), DP 1.1 (1), SDI (1, 480i, 576i, 720P, 1080i/P {3G SDI})
Outputs: DVI Loop (Non-HDCP), VGA (1, begins 1024x768/60Hz up to 2048x1152/60Hz or 1536x1536/60Hz, also user-defined), SDI Loop Out (1, 480i, 576i, 720P, 1080i/P {3G SDI})
Aurora Support Frame (LK2-
MOUNT)
Wall mounted frames for LED panels
Panasonic 84” LED Display
(TH-84EF1U)
Screen Size: 84-inch
Aspect Ratio: 16:9
Resolution: 1920 x 1080
Panel Surface Treatment: Anti-glare
RS-232 Compatible
Panasonic 32” LED Display
(TH-42LF8U)
Screen Size: 32-inch
Aspect Ratio: 16:9
Resolution: 1920 x 1080
Panel Surface Treatment: Anti-glare
RS-232 Compatible
Chief Large Flat Panel
Swing Arm Wall Display Mount
(PDRUB)
Swing arm wall mount for 84” TV
Stage Mounted Confidence
Monitor Cabinet
Stage mount for 32” or larger confidence monitor
Complete enclosure with rear access panel for maintenance
Elation Hedge Hog 4 Series
Lighting Console
(HOG102)
12-Inch Multi-Touch LCD Display
(10) Playback Faders
(12) User Keys (Non-LCD)
(4) Encoder Wheels
Dual Purpose Grand Master Fader
Grand Master Controller Keys (DBO & Flash)
Softkeys for Quick Toolbar Selection
256GB Internal Solid State Hard Disk Drive
(2) Gigabit Base-TX Ethernet Ports
(2) USB 2.0 Ports + (2) USB 3.0 Ports
(2) 5pin Female DMX Outputs
Light Converse Visualizer Software and Dongle Key
Length: 20.74”
Width: 21.83”
Elation Pro Lighting
Temperature Range Control
LED Lights
(16) 10W Multi-Chip CW / WW / Amber LEDs
50,000 Hour Average LED Life*
PHOTOMETRIC DATA: 2,635 LUX 245 FC @9.8’ (3m) (23° Full
ON)
13 | P a g e
(DTW PAR
300)
COLOR: Tungsten to Daylight (2,700K - 6,500K)
EFFECTS: Electronic Strobe and Variable Dim Curves; Unique Dim-to-Warm Channel Control (1.800K - 3.200K)
CONTROL / CONNECTIONS
(7) DMX Channel Modes (8 Total Channels)
4 Button Control Panel and LCD Menu Display
RDM (Remote Device Management)
3pin and 5pin DMX and powerCON In/Out
SIZE / WEIGHT
Length: 14.4" (365mm)
Width: 5.1" (129mm)
Vertical Height: 14.7" (373mm)
Weight: 19.0 lbs. (8.6 kg)
ELECTRICAL / THERMAL
AC 110-250V - 50/60Hz
170W Max Power Consumption
5°F to 113°F (-15°C to 45°C)
4-Digit Countdown
Timer Display (D6340)
Display Size: 4 Digit
Power Requirements: 4.6 watts
Weight: 3.9 lbs
Length: 16.8”
Width: 1.5”
Height: 9.1”
Executive Flat Top Lectern with Articulating Monitor Mount;
Hazlenut Maple
43” flat top work surface
Thermostatically controlled internal fans for dust and temperature control to ensure temperature remains between 85º and 87º at all times, with three year warranty
Articulating monitor arm for 21.5” interactive display
Cut-out for 10” control panel
4” round cut-out for cable caddy and connector cables
Solid steel AV rack-frame
Lectern skin shall be capable of replacement without requirement of full replacement of entire lectern
Input/output box for connectivity with existing infrastructure
Shure Microflex Overhead Mics
(MX202W/C)
Frequency Response: 50 to 17,000 Hz
Output Impedance: EIA Rated at 150 Ω (180 Ω actual)
Sensitivity (At 1,000 Hz, open circuit voltage)
Cardioid: –35.0 dBV/Pa (17.8 mV)
Supercardioid: –33.5 dBV/Pa (21.1 mV)
Omnidirectional: –27.5 dBV/Pa (42.2 mV)
*1 Pascal = 94 dB SPL
Maximum SPL (1 kHz at 1% THD, 1 kΩ load)
Cardioid: 124.2
14 | P a g e
Supercardioid: 122.7 dB
Omnidirectional: 116.7 dB
Equivalent Output Noise (A-weighted)
Cardioid: 28.0 dB SPL
Supercardioid: 26.5 dB SPL
Omnidirectional: 20.5 dB SPL
Signal to Noise Ratio (referenced at 94 dB SPL)
Cardioid: 66.0
Supercardioid: 67.5 dB
Omnidirectional: 73.5 dB
Dynamic Range at 1 kΩ Load: 96.2 dB
Common Mode Rejection: 45.0 dB minimum
Preamplifier Output Clipping Level (1% THD): –6.0 dBV (0.5 V)
Polarity: Positive sound pressure on diaphragm produces positive voltage on pin 2 relative to pin 3 of output connector.
Power Requirements: 11 to 52 Vdc phantom, 2.0 mA
Ceiling mounted Stage
Microphone
Omni-directional microphone
Over 50 sq meter coverage to track presenters
Beam pattern pick-up
Wacom
(DTK2241)
Interactive Monitor with battery-free pen technology Overall Dimension excluding stand 566 x 385 x 55 mm Weight 6.4 kg Interface USB 2.0 Stand 15° - 72° incline ExpressKeys 5 User USB Ports 2 Screen Size 21.5" Native Resolution 1920 x 1080 Aspect Ratio 16:9 Brightness 210 cd/m² Contrast Ratio 900:1 Response Rate 14 ms Viewing Angle 89°/89°, 89°/89° System Requirements Windows (Vista, Win 7, Win 8) and MacOS (10.8x to 10.10x)
Denon Professional
Rack- Mountable Blu-
Ray (DN-
500BD)
RS-232C/IP/Remote Controlled, professional grade Blu-Ray player
Rack Mountable with rack ears
Crestron Digital Media Switcher
(CRE-DM-
MD16x16)
Video
Switcher: 16x16 digital matrix, modular input/output cards
Input Signal Types: Configurable via modular plug-in cards supporting HDMI (DVI & Dual-Mode DisplayPort compatible), DVI, 3G-SDI, RGB/VGA, component, S-Video, composite (NTSC & PAL), DM 8G+ & HDBaseT, DM 8G Fiber, DM 8G SM Fiber, DM CAT (legacy), DM Fiber (legacy), & H.264 streaming
15 | P a g e
Output Signal Types: Configurable via modular plug-in cards supporting HDMI (DVI compatible), DM 8G+ & HDBaseT, DM 8G Fiber, DM 8G SM Fiber, DM CAT (legacy), DM Fiber (legacy), & H.264 streaming (All input cards also include HDMI pass-through outputs)
Backplane Data Rate: 12.5 Gbps
Audio
Switcher: 16x16 digital multichannel audio-follow-video matrix switching, plus independent 16x16 stereo matrix for audio breakaway
Input Signal Types: Configurable via modular plug-in cards supporting HDMI (Dual-Mode DisplayPort compatible), 3G-SDI, analog (stereo 2-channel), SPDIF, DM 8G+ & HDBaseT, DM 8G Fiber, DM 8G SM Fiber, DM CAT (legacy), DM Fiber (legacy), & H.264 streaming
Output Signal Types: Configurable via modular plug-in cards supporting HDMI, analog (stereo 2-channel), DM 8G+ & HDBaseT, DM 8G Fiber, DM 8G SM Fiber, DM CAT (legacy), DM Fiber (legacy), & H.264 streaming (All input cards also include HDMI pass-through outputs, and most digital audio input cards also include analog stereo pass-through audio outputs)
Communications
Ethernet: 10/100/1000 Mbps, auto-switching, auto-negotiating, autodiscovery, full/half duplex, DHCP, Private Network Mode
USB: USB signal routing via select input cards, transmitters, receivers, and extenders; USB computer console port for setup
DigitalMedia: DM 8G+, DM 8G Fiber, DM 8G SM Fiber, DM Fiber, DM CAT, DMNet, HDCP 2.2, EDID, CEC, PoDM, PoDM+, Ethernet
HDBaseT: HDCP 2.2, EDID, CEC, RS-232, PoH, Ethernet
HDMI: HDCP 2.2, EDID, CEC
Card Slots
1 – 16: (16) DM switcher input card slots; Each slot accepts (1) DMC-series input card
DM OUTPUTS 1 – 16: (8) DM switcher output card slots; Each slot accepts (1) DMC-series output card
Connectors
LAN: (1) 8-pin RJ45 female; 10Base-T/100Base-TX/1000Base-T Ethernet port
24ABG / EIG 1 – 16: (16) sets of (1) 4-pin and (1) 3-pin 3.5 mm detachable terminal blocks; Comprises (16) DMNet ports with “EIG” power selection ports, each set is associated with the corresponding DM CAT output port on any installed DM CAT output card; Each DMNet port provides power and communications for a DM CAT device connected via DM cable;
Each EIG port connects to an external power supply, or to the internal power source via a jumper, to power the DM CAT device connected to the corresponding DMNet port; Maximum Load: 40 Watts (1.66 Amps @ 24 Volts DC) per port, limited to the
16 | P a g e available DMNet power from the internal power supply (see “Power Requirements” below) or an external power supply
100-250V~7.0A 50/60Hz: (1) IEC 60320 C14 main power inlet;
Mates with removable power cord, included
G: (1) 6-32 screw, chassis ground lug
COMPUTER (front): (1) USB Type B female; USB computer console port (6 ft cable included)
Crestron 3-series Control System (CRE-
AV3)
Control Engine: Crestron 3-Series; real-time, preemptive multi-threaded/multitasking kernel; Transaction-Safe Extended FAT file system; supports up to 10 simultaneously running programs
Memory: SDRAM: 1 GB; Flash: 4 GB;
Memory Card: Supports SD and SDHC cards up to 32 GB
External Storage: Supports USB mass storage devices up to 1
TB
Communications:
Ethernet: 10/100/1000 Mbps, auto-switching, auto-negotiating, auto-discovery, full/half duplex, industry-standard TCP/IP stack, UDP/IP, CIP, DHCP, SSL, TLS, SSH, SFTP (SSH File Transfer Protocol), FIPS 140-2 compliant encryption, IEEE 802.1X, SNMP, BACnet/IP, IPv4 or IPv6, Active Directory authentication, IIS v.6.0 Web Server, SMTP e-mail client
Control Subnet: 10/100/1000 Mbps Ethernet, auto-switching, auto-negotiating, auto-discovery, full/half duplex, DHCP server, DNS Server, port forwarding, Isolation Mode
USB: Supports USB mass storage class devices via rear panel USB 2.0 host port, supports computer console via front panel USB 2.0 device port
RS-232/422/485: For 2-way device control and monitoring, all ports support RS-232 up to 115.2k baud with software handshaking, two ports also support hardware handshaking, RS- 422, and RS-485
IR/Serial: Supports 1-way device control via infrared up to 1.2 MHz or serial TTL/RS-232 (0-5 Volts) up to 115.2k baud
Connectors & Card Slots:
S1 – S3: (3) 3-Series control card expansion slots (optional)
COM 1 – 2: (2) 5-pin 3.5 mm detachable terminal blocks;
Bidirectional RS-232/422/485 ports; Up to 115.2k baud;
hardware and software handshaking support
COM 3 – 6: (4) 3-pin 3.5 mm detachable terminal blocks;
Bidirectional RS-232 ports; Up to 115.2k baud; software handshaking support
IR - SERIAL OUTPUT 1 – 8: (2) 8-pin 3.5 mm detachable terminal blocks; Comprises (8) IR/Serial output ports; IR output up to 1.2 MHz; 1-way serial TTL/RS-232 (0-5 Volts) up to
115.2k baud
17 | P a g e
RELAY OUTPUT 1 – 8: (2) 8-pin 3.5 mm detachable terminal blocks; Comprises (8) normally open, isolated relays; Rated 1
Amp, 30 Volts AC/DC; MOV arc suppression across contacts
LAN: (1) 8-pin RJ45 jack; 10Base-T/100Base-TX/1000Base-T Ethernet port; Connects to the customer’s LAN
CONTROL SUBNET: (1) 8-pin RJ45 jack; 10Base-T/100Base- TX/1000Base-T Ethernet port
USB: (1) USB Type A female; USB 2.0 port for storage devices
MEMORY: (1) SD memory card slot; Accepts one SD or SDHC card up to 32 GB for memory expansion
I/O 1 – 8: (1) 9-pin 3.5 mm detachable terminal block;
Comprises (8) “Versiport” digital input/output or analog input ports (referenced to GND)
Digital Input: Rated for 0-24 Volts DC, input impedance 20k Ohms, logic threshold >3.125V low/0 and <1.875V high/1
Digital Output: 250 mA sink from maximum 24 Volts DC, catch diodes for use with “real world” loads
Analog Input: Rated for 0-10 Volts DC, protected to 24 Volts DC maximum, input impedance 21k Ohms with pull-up resistor disabled; Programmable 5 Volts, 2k Ohms pull-up resistor per pin
NET: (1) 4-pin 3.5 mm detachable terminal block
100-240V~2.4A 50/60Hz: (1) IEC 60320 C14 main power inlet;
Mates with removable power cord, included
G: (1) 6-32 screw; Chassis ground lug
COMPUTER (front): (1) USB Type B female; USB 2.0 computer console port
Power: 2.4 Amps @ 100-240 Volts AC, 50/60 Hz
Crestron Capture HD
(CRE-
CAPTURE-HD)
Capture & Streaming
Video Recording Formats: H.264 high profile @ 720p24, 720p30, 720p60, 1080p24, and 1080p30
Video Recording Bitrates: 500 to 6000 kbps
Video Streaming Formats: H.264 high profile @ 720p10, 720p15, 720p30, 720p60, 1080p10, 1080p15, and 1080p30
Video Streaming Bitrates: 500 to 6000 kbps
Audio Format: AAC stereo
Container: MPEG-2 transport stream (.ts), MPEG-4 Part 14 (.mp4)
File Transfer Protocols: FTP, SFTP
Streaming Protocols: RTP, RTSP, SDP
Session Initiation Modes: By receiver (unicast), by transmitter (unicast), multicast via RTSP, multicast via UDP
Storage
Memory Card: Supports SD and SDHC memory cards, 16 GB SDHC card included
USB: Supports USB hard drives
Network: Supports file transfer to network media server
18 | P a g e
Scaling: VXP® video processing, 3D and 2D noise reduction, block artifact reduction, mosquito noise reduction, motion and edge adaptive deinterlacing, detail enhancement, adaptive contrast enhancement, adaptive de-banding, film cadence detection, picture-in-picture and side-by-side windowing
Input Signal Types (Content): HDMI® (DVI and Dual-Mode DisplayPort compatible), VGA/RGB (RGBHV, RGBS, RGsB)
Input Signal Types (Camera): Composite (NTSC, PAL), SDI
(SD-SDI SMPTE 259M, HD-SDI SMPTE 292M, 3G-SDI
SMPTE 424M)
Output Signal Types: HDMI (DVI compatible)
Input Resolutions, HDMI, Progressive: Any resolution and frame rate from 640x400 to 1920x1200 up to 162 MHz pixel clock
Input Resolutions, HDMI, Interlaced: 480i, 576i, 1080i25 (1125 lines), 1080i30
Input Resolutions, RGB, Progressive: Any resolution and frame rate from
640x400 to 1920x1200 up to 162 MHz pixel clock
Input Resolutions, Composite: 480i, 576i
Input Resolutions, 3G-SDI [6]:
SMPTE 425M (3G-SDI) 4:2:2 Colorspace:
1920x1080@50Hz (1080p50), 1920x1080@60Hz (1080p60);
SMPTE 425M (3G-SDI) 4:4:4 Colorspace: 1280x720@50Hz (720p50), 1280x720@60Hz (720p60), 1920x1080@24Hz (1080p24), 1920x1080@25Hz (1080p25), 1920x1080@30Hz (1080p30), 1920x1080@50Hz (1080i50 or 1080sF25), 1920x1080@60Hz (1080i60 or 1080sF30);
SMPTE 260M (HD-SDI): 1920x1035@60Hz (1035i60);
SMPTE 295M (HD-SDI): 1920x1080@50Hz (1080i50);
SMPTE 274M (HD-SDI): 1920x1080@24Hz (1080p24), 1920x1080@24Hz (1080sF24), 1920x1080@25Hz (1080p25), 1920x1080@30Hz (1080p30), 1920x1080@50Hz (1080i50 or
1080sF25), 1920x1080@60Hz (1080i60 or 1080sF30);
SMPTE 296M (HD-SDI): 1280x720@50Hz (720p50), 1280x720@60Hz (720p60);
SMPTE 259M-C (SD-SDI): 720x480@59.94 (NTSC), 720x576@50i (PAL)
Output Resolutions, HDMI: Same as CONTENT input (HDMI or RGBHV) when viewing the selected content source, or same as capture settings when viewing the capture image
A-D Conversion: 10-bit 162 MHz per each of 3 channels
Audio
Processing: Provides mixing of the stereo CONTENT audio signals with the mono SPEECH signal
A-D/D-A Conversion: 24-bit 48 kHz
19 | P a g e
Input Signal Types (Content): HDMI (Dual-Mode DisplayPort compatible [5]),analog stereo
Input Signal Types (Speech): Analog mono
Output Signal Types: HDMI, analog stereo
Digital Formats (HDMI): 2-channel PCM
Content Input Compensation: ±10.0 dB
Content Mix Level: -80.0 to 0.0 dB
Content Bass: ±15.0 dB
Content Treble: ±15.0 dB
Content Audio Delay: 0.0 to 40.0 ms
Speech Input Compensation: ±10.0 dB
Speech Mix Level: -80.0 to 0.0 dB
Speech Bass: ±15.0 dB
Speech Treble: ±15.0 dB
Analog Output Volume: -80 to +20 dB, adjustable from 0% to 100%, plus mute
Analog Output Bass: ±15.0 dB
Analog Output Treble: ±15.0 dB
Analog Performance:
Frequency Response: 20 Hz to 20 kHz ±0.75 dB;
S/N Ratio: >90 dB, 20 Hz to 20 kHz A-weighted;
THD+N: <0.05% @ 1 kHz;
Stereo Separation: >90 dB
Communications
Ethernet: 10/100/1000 Mbps, auto-switching, auto-negotiating, autodiscovery, full/half duplex, DHCP
USB: USB 2.0 host, supports USB hard drives
Connectors
SPEECH IN (Unbalanced): (1) RCA female; Unbalanced line-level audio input; Input Impedance: 10k Ohms nominal;
Input Level: 2 Vrms maximum
SPEECH IN (Balanced): (1) 3-pin 3.5 mm detachable terminal block; Balanced/unbalanced line-level audio input;
Input Impedance: 17.5k Ohms nominal balanced/unbalanced; Balanced Input Level: 4 Vrms maximum; Unbalanced Input Level: 2 Vrms maximum
CONTENT AUDIO IN (Unbalanced): (1) 3.5 mm TRS mini phone jack; Unbalanced stereo line-level audio input; Input Impedance: 18.5k Ohms nominal; Input Level: 1 Vrms maximum
CONTENT AUDIO IN (Balanced): (1) 5-pin 3.5 mm detachable terminal block; Balanced/unbalanced stereo line-level audio input; Input Impedance: 24k Ohms nominal balanced/unbalanced; Balanced Input Level: 4 Vrms maximum; Unbalanced Input Level: 2 Vrms maximum
AUDIO OUT L, R (Unbalanced): (2) RCA female;
Unbalanced stereo line-level audio output;
Output Impedance: 100 Ohms nominal; Output Level: 2 Vrms maximum
20 | P a g e
AUDIO OUT (Balanced): (1) 5-pin 3.5 mm detachable terminal block; Balanced/unbalanced stereo line-level audio output; Output Impedance: 200 Ohms balanced, 100 Ohms unbalanced; Balanced Output Level: 4 Vrms maximum;
Unbalanced Output Level: 2 Vrms maximum
CAMERA IN, COMPOSITE: (1) BNC female analog composite video input; RCA adapter included;
Input Impedance: 75 Ohms nominal; Input Level: 1 Vp-p nominal
CAMERA IN, 3G-SDI: (1) BNC female, SDI video input;
Input Impedance: 75 Ohms nominal
CONTENT IN, RGBHV: (1) HD15 female, analog VGA/RGB input; Formats: RGBHV, RGBS, RGsB;
Input Levels: 0.5 to 1.5 Vp-p with built-in DC restoration;
Input Impedance: 75 Ohms nominal;
Sync Detection: RGBHV, RGBS, RGsB; Sync Input Level: 3 to 5 Vp-p; Sync Input Impedance: 511 Ohms nominal
CONTENT IN, HDMI: (1) 19-pin Type A HDMI female; Signal Types: HDMI, DVI, Dual-Mode DisplayPort
LOOP OUT, RGBHV: (1) HD15 female, buffered pass-thru from RGBHV input
HDMI OUT: (1) 19-pin Type A HDMI female; Signal Types:
HDMI, DVI
MEMORY: (1) SD memory card slot; for local storage;
Supports SD and SDHC cards (16 GB SDHC card included)
USB: (2) USB Type A female (1 front, 1 rear); USB 2.0 host ports for connection of a USB hard drive
LAN: (1) 8-wire RJ45, female; 10Base-T/100Base- TX/1000Base-T Ethernet port
12VDC 5.0A: (1) 2.5 x 5.5 mm DC power connector; 12 Volt DC power input; PW-1250DU power pack included
G: (1) 6-32 screw, chassis ground lug
COMPUTER (front): (1) USB Type B female, for future use
Display
Display Type: TFT active matrix color LCD
Size: 1.8 inch (45 mm) diagonal
Resolution: 220 x 176 pixels
Functions: Displays recording status, time counter, audio levels, setup parameters, and other details
Power Requirements
Power Pack: 5 Amps @ 12 Volts DC; 100-240 Volts AC, 50/60 Hz power pack, model PW-1250DU included
Enclosure
Chassis: Metal with black finish, vented sides, variable-speed fan-cooled
Faceplate: Metal, black finish with polycarbonate label overlay
Mounting: Freestanding or 1 RU 19-inch rack-mountable (adhesive feet and rack ears included)
21 | P a g e
Crestron Capture HD
Control Panel
(CRE-
CAPTURE-
TPMC-4SM-B-
S)
Touch Screen Display
Display Type: TFT Active matrix color LCD
Size: 4.3 inch (109 mm) diagonal
Aspect Ratio: 16:9 WVGA
Resolution: 800 x 480 pixels
Brightness: 270 nits (cd/m²)
Contrast: 300:1
Color Depth: 16-bit, 64k colors
Illumination: Backlit LED
Viewing Angle: ±80° horizontal, ±80° vertical
Touch Screen: Resistive membrane
Proximity Sensor
Type: Active infrared beam and receiver
Range: 3-4 feet
Wakes the touch screen and backlight
Graphics Engine
16-bit non-palette graphics, 65,536 colors, pre-programmed for use with the CAPTURE-HD High-Definition Capture Recorder
Communications
Ethernet: 10/100 Mbps, auto-switching, auto-negotiating, auto-discovery, full/half duplex, DHCP, IEEE 802.3af and 802.3at compliant
Video
Streaming Formats: MJPEG (for camera preview)
Connectors
LAN PoE: (1) 8-wire RJ45 with 2 LED indicators; 10Base- T/100Base-TX Ethernet port; Power over Ethernet compliant;
Green and yellow LEDs indicate Ethernet port status
Power Requirements
Power over Ethernet: 802.3at Type 1 (802.3af compatible) Class 3 (12.95W) PoE Powered Device
Crestron 16-port Power
Over Ethernet Switch (CRE-
CEN-SWPOE-
16)
Ethernet
Ports: (16) 10/100/1000Base-T auto-sensing Gigabit Ethernet w/PoE
Network Standards: IEEE 802.3, 802.3u, 802.3ab, 802.3bc, 802.3af, 802.3at Type 1 and 2
Transmission Method: Store-and-Forward
MAC Addresses: Up to 4K
Switch Fabric: 32 Gbps non-blocking
Connectors
10/100/1000 POWER OVER ETHERNET 1 – 16: (16) 8-wire RJ45, female; 10/100/1000Base-T Ethernet ports and PoE Power Sourcing Equipment (PSE) outputs; Supports IEEE 802.3at Type 1 PoE, Class 0-3 (15.4W) power sourcing at…